Core42
What changedGPU cloud
Core42 is linked to 1 tracked US data center in 1 state as owner, operator, developer, tenant, utility or other party. Facilities with a disclosed figure add up to 58 MW online and 0 MW in the pipeline (floors: 1 of 1 report power). Every relationship cites its source.
Follow
Get changes to Core42
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Core42: US data center footprint.” /companies/core42. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_core42_2026,
title = {{Core42: US data center footprint}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/companies/core42}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
Floors, not totals: power sums only facilities with a reported or estimated figure (1 of 1), across all roles (a company can be tenant at one site and owner at another). “—” means not disclosed or not yet collected.
US footprint by state
- New York1 sites · 58 MW
Relationship graph
Derived from the ownership → operation → tenancy → workload chain at each shared facility, plus company-to-company relationships extracted from cited documents. Speculative links are excluded.
Serves workloads of
- G421 site · LikelyCore42 Lake Mariner
Powered by
- Niagara Mohawk Power Corp.1 site · UnverifiedCore42 Lake Mariner
Backed by
- Google1 site · ConfirmedCore42 Lake Mariner
| Facility | Role | Location | Status | Power |
|---|---|---|---|---|
| Core42 Lake Mariner | Owner | Barker, NY | Operating | 58 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |