Applied Digital
What changedDeveloper · also matched as Applied Digital Corporation
Applied Digital is linked to 4 tracked US data centers in 3 states as owner, operator, developer, tenant, utility or other party. Facilities with a disclosed figure add up to 88 MW online and 442 MW in the pipeline (floors: 4 of 4 report power). Every relationship cites its source.
Follow
Get changes to Applied Digital
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Applied Digital: US data center footprint.” /companies/applied-digital. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_applied_digital_2026,
title = {{Applied Digital: US data center footprint}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/companies/applied-digital}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
Floors, not totals: power sums only facilities with a reported or estimated figure (4 of 4), across all roles (a company can be tenant at one site and owner at another). “—” means not disclosed or not yet collected.
US footprint by state
- North Dakota2 sites · 88 MW
- South Dakota1 sites
- Louisiana1 sites
Relationship graph
Derived from the ownership → operation → tenancy → workload chain at each shared facility, plus company-to-company relationships extracted from cited documents. Speculative links are excluded.
Develops for
- CoreWeave1 site · ConfirmedCoreWeave Ellendale ND
| Facility | Role | Location | Status | Power |
|---|---|---|---|---|
| Applied Digital Center, ND | Developer | Center, ND | Unknown | 430 MW planned ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. |
| Applied Digital Toronto, SD | Developer | Toronto, SD | Unknown | 430 MW planned ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. |
| Applied Digital Alexandria | Developer | Alexandria, LA | Unknown | 210 MW planned ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. |
| CoreWeave Ellendale ND | Developer | Ellendale, ND | Operating + expanding | 88 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |