DC
/

xAI Macrohardrr

OperatingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.AI campusBuildingMemphis, DeSoto County, Mississippi

xAI Macrohardrr is an operating ai campus in Memphis, Mississippi. Operated or owned by SpaceXAI (xAI). Power capacity has not been disclosed or collected yet. Verification: unverified. 6 cited sources.

Part of Colossus 2

30% profile completeness
16 claims from 6 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Oct 12, 2026
Follow

Get changes to xAI Macrohardrr

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “xAI Macrohardrr.” /facilities/xai-macrohardrr-memphis-ms. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_xai_macrohardrr_memphis_ms_2026,
  title = {{xAI Macrohardrr}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/xai-macrohardrr-memphis-ms}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
814,800 sq ft[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Entergy · MISO
Substation: Unnamed substation (500 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalOct 12, 2026
    Community map
    • Oct 12, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    xAI Macrohardrr
  2. substation
    Unnamed substation (500 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.54 km away. Proximity does not establish that it serves the site.
  3. transmission
    Freeport Sub TVA to Southaven Sub TVA 500KV[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.59 km away). Not confirmed as the supply path.
  4. utility
    Entergy[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    MISO[3]
    Service territoryLikely
    Balancing authority: MISO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

  • TVA Southaven Combined Cycle (Natural Gas, 780 MW) is 0.3 km away[6]
    EIA plant within 1.5 km; proximity does not establish that it supplies the facility
    Natural gasCo-located780 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Unverified

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits1

  • TVA Southaven Combined Cycle (Natural Gas, 780 MW) is 0.3 km away780 MW[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Natural gas · Co-located

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for Entergy. Know one? Add a source

Location & imagery

Mapped outline
Coordinates
34.99349, -90.03417
Address
Stateline Road West, Memphis, TN[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
County
DeSoto County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:
Entergy[2]Unverified

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Operator
Utility
Entergy[2]Unverified

Most likely retail provider among 3 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: City of West Memphis - (Ar), Coahoma Electric Power Assn.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
MISO[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
MISO[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Unnamed substation (500 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.5 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
500 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
7.66¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Mississippi statewide average, July 2026.

State avg. commercial price
13.65¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Mississippi statewide average, July 2026.

Generation within 50 km
2.8 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

10 EIA-reported plants within 50 km.

Generation queued in county
1.92 GW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived

7 active generation interconnection requests in DeSoto County: Gas 920 MW, Solar 649 MW, Storage 350 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
230 kV lineTransmission line0.55 km230 kV[1]
Freeport Sub TVA to Southaven Sub TVA 500KV · Tennessee Valley AuthorityTransmission line0.59 km500 kV[1]
Freeport - Southeast Gate 161kV #2 · Memphis Light, Gas and WaterTransmission line0.82 km161 kV[1]
500 kV lineTransmission line1.22 km500 kV[1]
Freeport Sub TVA to Cordova Sub TVA 500KV · Memphis Light, Gas and WaterTransmission line1.41 km500 kV[1]
Allen Fossil Plant TVA to Freeport Sub TVA 500KV · Memphis Light, Gas and WaterTransmission line1.44 km500 kV[1]
TVA Southaven Combined Cycle · Tennessee Valley AuthorityPower plant (Natural Gas)0.3 km780 MW[6]
Allen · Tennessee Valley AuthorityPower plant (Natural Gas)13.7 km1.48 GW[6]
Wildflower Solar, LLC (Ms) · Duke Energy Renewables ServicesPower plant (Solar)14.1 km100 MW[6]
West Memphis Solar Station · Entergy Arkansas LLCPower plant (Solar)31 km180 MW[6]
Sr Byhalia, LLC · SR Byhalia, LLCPower plant (Solar)36.6 km5 MW[6]
Sr Canadaville, LLC · SR Canadaville, LLCPower plant (Solar)41.4 km16 MW[6]
Millington Solar Farm · SR Millington, LLCPower plant (Solar)43 km53 MW[6]
Big Cypress Solar, LLC · Big Cypress Solar, LLCPower plant (Solar)46.3 km180 MW[6]
Unnamed substationSubstation0.54 km500 kV[1]
Freeport Substation · Tennessee Valley AuthoritySubstation1.35 km500 kV[1]
Memphis Light, Gas and Water substation · Memphis Light, Gas and WaterSubstation2.02 km161 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
J1813 at Entergy Freeport 230 kV SubstationMISO J1813GasIA signed · proposed 2020-03920 MW[4]
J2091 at TWINKLETOWN 230 KVMISO J2091StorageIA signed · proposed 2025-02250 MW[4]
J2602 at Twinkletown 230 kVMISO J2602SolarIn study · proposed 2026-06250 MW[4]
J2047 at Robinsonville 230 kVMISO J2047SolarIA signed · proposed 2024-12199 MW[4]
J962 at Twinkletown 230 kV SubstationMISO J962SolarUnder construction · proposed 2021-01100 MW[4]
J1748 at Twinkletown 230 kVMISO J1748SolarIA signed · proposed 2023-08100 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
814,800 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

Other buildings on this campus

2

All claims (provenance audit)

16
FieldValueSourceConfidenceAs ofStatus
NamexAI Macrohardrrway/1077131079 name=xAI Macrohardrr[1] Likely2026-10-12Shown
StatusOperating[1] derivedUnverified2026-10-12Shown
Facility typeAI campus[1] derivedUnverified2026-10-12Shown
AddressStateline Road West, Memphis, TN[1] Likely2026-10-12Shown
OperatorSpaceXAI (xAI)operator=xAI[1] Likely2026-10-12Shown
UtilityEntergyterritory 12685: ENTERGY MISSISSIPPI LLC (INVESTOR OWNED, ENTERGY CORP)[2] derivedUnverified2022Shown
ISO / RTOMISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC..[3] derivedLikely—Shown
Balancing authorityMISO[2] derivedLikely—Shown
Nearest mapped substationUnnamed substation (500 kV)way/90962691[1] derivedLikely2026-09-28Shown
Distance to substation0.5 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby500 kV[1] derivedLikely2026-09-28Shown
Generation queued in county1.92 GW[4] derivedConfirmed2026-10-12Shown
State avg. industrial price7.66¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price13.65¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km2.8 GW[6] derivedConfirmed202502Shown
Building footprint814,800 sq ft[1] derivedLikely2026-10-12Shown