- Colossus 2 AI campus · MemphisOperating + expanding1.28 GW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.+789 MW pipeline EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- xAI Macrohardrr AI campus · MemphisOperating
Interconnection-queue requests filed here (last two years)
Requests to connect generation or large loads, as the ISO/RTO publishes them. Filing is an application, not a commitment to build.
- Dec 24, 2025 · MISO S1134 Storage generation — S1134 at TWINKLETOWN100 MW · Active · DPP-2026 ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.source
Local impact
Water, on-site generation and air permits, incentives, regulatory events and large-load tariffs, where a source documents them. Counts are of sourced records, not of the state's totals.
Air-cooled (chillers / dry coolers): 1 site EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
2 sites with documented on-site generation (MW not reported)
Not yet collected
Not yet collected for this state's utilities.
Not yet collected
Recent changes
- Jun 15, 2026 · Colossus 2 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Current IT capacity: 490 MW → 946 MW
- Jun 15, 2026 · Colossus 2 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Current facility power: 661 MW → 1.28 GW
- Jun 15, 2026 · Colossus 2 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Buildings operational: 1 → 2
- Jun 15, 2026 · Colossus 2 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. New capacity online: The site is estimated to have at least ~830 MW of GPU server power, with at least "at least 220,000 additional GB300 processors and over 400 additional megawatts of compute power", corresponding to the "next phase of …
- Apr 6, 2026 · Colossus 2 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Current IT capacity: 239 MW → 490 MW
- Apr 6, 2026 · Colossus 2 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Current facility power: 323 MW → 661 MW
- Oct 19, 2025 · Colossus 2 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Buildings operational: 0 → 1
- Oct 19, 2025 · Colossus 2 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Status: Under construction → Operating + expanding
- Oct 19, 2025 · Colossus 2 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. New capacity online: Battery facility looks complete (though more might be added). Turbines look connected up, minimal construction around them. We believe this state corresponds to the first compute cluster brought online at this site of…
- Feb 28, 2025 · Colossus 2 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Construction started: Land clearing begins next to the existing building.