DC
/

Unnamed data center

OperatingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.UnclassifiedBuildingPecos County, Texas

Unnamed data center is an operating data center in Texas. Power capacity has not been disclosed or collected yet. Verification: unverified. 6 cited sources.

10% profile completeness
12 claims from 6 sources
Follow

Get changes to Unnamed data center

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Unnamed data center.” /facilities/unnamed-data-center-pecos-county-tx. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_unnamed_data_center_pecos_county_tx_2026,
  title = {{Unnamed data center}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/unnamed-data-center-pecos-county-tx}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
17,500 sq ft[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Rio Grande Electric Coop, INC · ERCOT
Substation: Lonestar Dream - Tarbush (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalOct 12, 2026
    Community map
    • Oct 12, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Unnamed data center
  2. substation
    Lonestar Dream - Tarbush[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.27 km away. Proximity does not establish that it serves the site.
  3. transmission
    138 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.33 km away). Not confirmed as the supply path.
  4. utility
    Rio Grande Electric Coop, INC[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    ERCOT[3]
    Service territoryLikely
    Balancing authority: EPE, ERCO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for Rio Grande Electric Coop, INC. Know one? Add a source

Location & imagery

Mapped outline
Coordinates
31.10347, -103.23855
County
Pecos County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Most likely retail provider among 4 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Southwest Texas Elec Coop, INC, Texas-New Mexico Power CO, AEP Texas North Company.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
ERCOT[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
EPE, ERCO[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Lonestar Dream - Tarbush[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.3 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
138 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
7.07¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Texas statewide average, July 2026.

State avg. commercial price
8.47¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Texas statewide average, July 2026.

Generation within 50 km
1.35 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

20 EIA-reported plants within 50 km.

Generation queued in county
21.38 GW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 1, 2026.Confirmedderived

52 active generation interconnection requests in Pecos County: Solar 8,875 MW, Gas 5,886 MW, Wind 4,675 MW, Storage 1,945 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
138 kV lineTransmission line0.33 km138 kV[1]
Taygete Energy Project LLC · Taygete Energy Project LLCPower plant (Solar)12.7 km255 MW[6]
Taygete II Energy Project · West Texas Solar Project II LLCPower plant (Solar)14 km204 MW[6]
Flower Valley II · Flower Valley IIPower plant (Batteries)15.7 km101 MW[6]
Re Roserock · Southern Power CoPower plant (Solar)17.2 km158 MW[6]
Barilla Solar · Leeward Asset Management, LLCPower plant (Solar)19.2 km30 MW[6]
Rodeo Ranch Energy Storage · Rodeo Ranch Energy Storage, LLCPower plant (Batteries)29.8 km300 MW[6]
St. Gall Energy Storage I · St. Gall Energy Storage IPower plant (Batteries)33.7 km100 MW[6]
Swoose II · Swoose IIPower plant (Batteries)40.4 km101 MW[6]
Lonestar Dream - TarbushSubstation0.27 km—[1]
Unnamed substationSubstation1.75 km138 kV[1]
Unnamed substationSubstation1.8 km—[1]
Unnamed substationSubstation1.9 km138 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
Big Canyon WindERCOT 30INR0018 · Longfellow Wind, LLCWindIA signed · proposed 2030-071.5 GW[4]
The Giant Arc-IIERCOT 30INR0105 · Powering Knowledge, LLCGasIn study · proposed 2030-041.3 GW[4]
The Giant Arc IERCOT 30INR0113 · Powering Knowledge, LLCGasIn study · proposed 2030-041.3 GW[4]
Gravitas I Natural GasERCOT 30INR0084 · S&S Renewables, LLCGasIn study · proposed 2030-061.25 GW[4]
Permian I Natural GasERCOT 31INR0019 · S&S Renewables, LLCGasIn study · proposed 2030-061.25 GW[4]
Permian I SolarERCOT 31INR0018 · S&S Renewables, LLCSolarIn study · proposed 2030-061.13 GW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
17,500 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

12
FieldValueSourceConfidenceAs ofStatus
StatusOperating[1] derivedUnverified2026-10-12Shown
UtilityRio Grande Electric Coop, INCterritory 16057: RIO GRANDE ELECTRIC COOP, INC (COOPERATIVE, RIO GRANDE ELECTRIC[2] derivedUnverified2022Shown
ISO / RTOERCOTELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.[3] derivedLikely—Shown
Balancing authorityEPE, ERCO[2] derivedLikely—Shown
Nearest mapped substationLonestar Dream - Tarbushway/1463210151[1] derivedLikely2026-09-28Shown
Distance to substation0.3 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby138 kV[1] derivedLikely2026-09-28Shown
Generation queued in county21.38 GW[4] derivedConfirmed2026-10-01Shown
State avg. industrial price7.07¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price8.47¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km1.35 GW[6] derivedConfirmed202502Shown
Building footprint17,500 sq ft[1] derivedLikely2026-10-12Shown