MARA Data Center

OperatingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.UnclassifiedBuildingGranbury, Hood County, Texas

MARA Data Center is an operating data center in Granbury, Texas. Operated or owned by Marathon Digital Holdings. Power capacity has not been disclosed or collected yet. Verification: unverified. 6 cited sources.

30% profile completeness
16 claims from 6 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Oct 12, 2026
Follow

Get changes to MARA Data Center

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “MARA Data Center.” /facilities/mara-data-center-granbury-tx. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_mara_data_center_granbury_tx_2026,
  title = {{MARA Data Center}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/mara-data-center-granbury-tx}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Tri-County Electric Coop, INC (Tx) · ERCOT
Substation: Wolf Hollow Substation (345 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalOct 12, 2026
    Community map
    • Oct 12, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    MARA Data Center
  2. substation
    Wolf Hollow Substation (345 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.52 km away. Proximity does not establish that it serves the site.
  3. transmission
    345 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.3 km away). Not confirmed as the supply path.
  4. utility
    Tri-County Electric Coop, INC (Tx)[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    ERCOT[3]
    Service territoryLikely
    Balancing authority: ERCO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

  • Wolf Hollow II (Natural Gas, 1103 MW) is 0.6 km away[6]
    EIA plant within 1.5 km; proximity does not establish that it supplies the facility
    Natural gasCo-located1.1 GWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Unverified
  • Wolf Hollow I LP (Natural Gas, 756 MW) is 0.9 km away[6]
    EIA plant within 1.5 km; proximity does not establish that it supplies the facility
    Natural gasCo-located756 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Unverified

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits2

  • Wolf Hollow II (Natural Gas, 1103 MW) is 0.6 km away1.1 GW[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Natural gas · Co-located
  • Wolf Hollow I LP (Natural Gas, 756 MW) is 0.9 km away756 MW[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Natural gas · Co-located

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for Tri-County Electric Coop, INC (Tx). Know one? Add a source

Location & imagery

Mapped outline
Coordinates
32.34232, -97.73124
Address
2001 Mitchell Bend Highway, Granbury, TX[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
County
Hood County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Most likely retail provider among 4 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: United Electric Coop Service INC - (Tx), Texas-New Mexico Power CO, Oncor Electric Delivery Company LLC.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
ERCOT[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
ERCO[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Wolf Hollow Substation (345 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.5 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
345 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
7.07¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Texas statewide average, July 2026.

State avg. commercial price
8.47¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Texas statewide average, July 2026.

Generation within 50 km
5.1 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

12 EIA-reported plants within 50 km.

Generation queued in county
560 MW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 1, 2026.Confirmedderived

3 active generation interconnection requests in Hood County: Gas 306 MW, Solar 148 MW, Storage 106 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
138 kV lineTransmission line0.27 km138 kV[1]
345 kV lineTransmission line0.3 km345 kV[1]
Wolf Hollow II · Constellation Power, IncPower plant (Natural Gas)0.6 km1.1 GW[6]
Wolf Hollow I LP · Wolf Hollow I Power, LLCPower plant (Natural Gas)0.9 km756 MW[6]
Comanche Peak · Luminant Generation Company LLCPower plant (Nuclear)7.1 km2.4 GW[6]
Decordova Steam Electric Station · Luminant Generation Company LLCPower plant (Natural Gas)7.3 km534 MW[6]
Walnut Springs Solar · Cypress Creek RenewablesPower plant (Solar)29.5 km5 MW[6]
Johnson County · Johnson County Power LLCPower plant (Natural Gas)31 km267 MW[6]
Tpe Erath Solar, LLC · Navisun LLCPower plant (Solar)45.6 km10 MW[6]
Tpe Whitney Solar, LLC · Cardinal RenewablesPower plant (Solar)48.4 km10 MW[6]
Wolf Hollow Substation · OncorSubstation0.52 km345 kV[1]
Wolf Hollow SubstationSubstation0.77 km345 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
Wolf Hollow IIIERCOT 24INR0567 · Wolf Hollow II Power LLCGasIn study · proposed 2027-05306 MW[4]
Rain Lily Solar 1ERCOT 27INR0288 · Rain Lily Solar 1 LLCSolarIA signed · proposed 2028-10148 MW[4]
Rain Lily Storage 1ERCOT 27INR0285 · Rain Lily Storage One, LLCStorageIA signed · proposed 2028-10106 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Site area
40.7 acres[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived

Area of the mapped OSM site outline.

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

16
FieldValueSourceConfidenceAs ofStatus
NameMARA Data Centerway/1301559332 name=MARA Data Center[1] Likely2026-10-12Shown
StatusOperating[1] derivedUnverified2026-10-12Shown
Websitehttps://www.maragranbury.com/[1] Likely2026-10-12Shown
Address2001 Mitchell Bend Highway, Granbury, TX[1] Likely2026-10-12Shown
OperatorMarathon Digital Holdingsoperator=Marathon Digital Holdings[1] Likely2026-10-12Shown
UtilityTri-County Electric Coop, INC (Tx)territory 19159: TRI-COUNTY ELECTRIC COOP, INC (TX) (COOPERATIVE, TRI-COUNTY ELE[2] derivedUnverified2022Shown
ISO / RTOERCOTELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.[3] derivedLikely—Shown
Balancing authorityERCO[2] derivedLikely—Shown
Nearest mapped substationWolf Hollow Substation (345 kV)way/862801075[1] derivedLikely2026-09-28Shown
Distance to substation0.5 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby345 kV[1] derivedLikely2026-09-28Shown
Generation queued in county560 MW[4] derivedConfirmed2026-10-01Shown
State avg. industrial price7.07¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price8.47¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km5.1 GW[6] derivedConfirmed202502Shown
Site area40.7 acres[1] derivedLikely2026-10-12Shown