Liquid Web, Inc
Liquid Web, Inc is an operating data center in Lansing, Michigan. Power capacity has not been disclosed or collected yet. Verification: unverified. 6 cited sources.
Follow
Get changes to Liquid Web, Inc
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Liquid Web, Inc.” /facilities/liquid-web-inc-lansing-mi. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_liquid_web_inc_lansing_mi_2026,
title = {{Liquid Web, Inc}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/liquid-web-inc-lansing-mi}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityLiquid Web, Inc
- →substationCanal Substation (138 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.26 km away. Proximity does not establish that it serves the site.
- →transmission138 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.24 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for Consumers Energy CO. Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 42.70539, -84.66609
- Address
- 2703 Ena Drive, Lansing, MI 48917[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
- County
- Eaton County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 4 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: City of Lansing - (Mi), Tri-County Electric Coop (Mi), Wolverine Power Supply Coop.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- MISO[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Location falls inside this ISO/RTO footprint.
- Balancing authority
- MISO[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Canal Substation (138 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 0.3 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 138 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 9.81¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Michigan statewide average, July 2026.
- State avg. commercial price
- 16.46¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Michigan statewide average, July 2026.
- Generation within 50 km
- 724 MW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
17 EIA-reported plants within 50 km.
- Generation queued in county
- 928 MW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived
4 active generation interconnection requests in Eaton County: Storage 750 MW, Solar 178 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 138 kV line | Transmission line | 0.24 km | 138 kV | [1] |
| 46 kV line · Consumers Energy | Transmission line | 1.47 km | 46 kV | [1] |
| Delta Energy Park · Lansing Board of Water and Light | Power plant (Natural Gas) | 1.8 km | 224 MW | [6] |
| Lansing Bwl Reo Town Plant · Lansing Board of Water and Light | Power plant (Natural Gas) | 9.5 km | 75 MW | [6] |
| T B Simon Power Plant · Michigan State University | Power plant (Natural Gas) | 15 km | 126 MW | [6] |
| Blue Elk III Solar, LLC · Blue Elk III Solar, LLC | Power plant (Solar) | 21.9 km | 20 MW | [6] |
| Blue Elk II Solar, LLC · Blue Elk II Solar, LLC | Power plant (Solar) | 27.1 km | 20 MW | [6] |
| Bingham Solar, LLC · National Grid Renewables | Power plant (Solar) | 35.9 km | 20 MW | [6] |
| Shipsterns Solar, LLC · Shipsterns Solar, LLC | Power plant (Solar) | 45.7 km | 20 MW | [6] |
| River Fork Solar, LLC · River Fork Solar, LLC | Power plant (Solar) | 47.7 km | 149 MW | [6] |
| Canal Substation · Lansing Board of Water & Light | Substation | 0.26 km | 138 kV | [1] |
| Olds 5 Substation · Lansing Board of Water and Light | Substation | 1.11 km | 138 kV | [1] |
| Erickson Substation · Lansing Board of Water and Light | Substation | 1.56 km | 138 kV | [1] |
| Delta Energy Park Substation · Lansing Board of Water & Light | Substation | 1.7 km | 138 kV | [1] |
| South Creyts Substation · Lansing Board of Water and Light | Substation | 2.09 km | 138 kV | [1] |
| Davis Substation · Lansing Board of Water and Light | Substation | 2.61 km | 138 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| J3992 at MAJESTIC - ONEIDA 345.0kVMISO J3992 | Storage | In study · proposed 2028-04 | 400 MW | [4] |
| J3836 at ONEIDAMISO J3836 | Storage | In study · proposed 2028-10 | 250 MW | [4] |
| J4043 at OneidaMISO J4043 | Solar | In study · proposed 2028-04 | 178 MW | [4] |
| J4128 at Clinton InterconnectionMISO J4128 | Storage | In study · proposed 2030-02 | 100 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- 145,800 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Unverifiedestimated
Estimated as footprint × 2 mapped floors; gross, not leasable, area.
- Building footprint
- 72,900 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Computed from the mapped OSM building outline.
- Floors
- 2[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
17| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Liquid Web, Incway/545060574 name=Liquid Web, Inc | [1] | Likely | 2026-10-12 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-10-12 | Shown |
| Website | https://www.liquidweb.com/ | [1] | Likely | 2026-10-12 | Shown |
| Address | 2703 Ena Drive, Lansing, MI 48917 | [1] | Likely | 2026-10-12 | Shown |
| Utility | Consumers Energy COterritory 4254: CONSUMERS ENERGY CO (INVESTOR OWNED, CMS ENERGY CORPORATION) | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | MISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC.. | [3] derived | Likely | — | Shown |
| Balancing authority | MISO | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Canal Substation (138 kV)way/590901969 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.3 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 138 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 928 MW | [4] derived | Confirmed | 2026-10-12 | Shown |
| State avg. industrial price | 9.81¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 16.46¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 724 MW | [6] derived | Confirmed | 202502 | Shown |
| Floor area | 145,800 sq ft | [1] estimated | Unverified | 2026-10-12 | Shown |
| Building footprint | 72,900 sq ft | [1] derived | Likely | 2026-10-12 | Shown |
| Floors | 2building:levels=2 | [1] | Likely | 2026-10-12 | Shown |