DC
/

Liquid Web

OperatingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.UnclassifiedBuildingEaton County, Michigan

Liquid Web is an operating data center in Michigan. Power capacity has not been disclosed or collected yet. Verification: unverified. 6 cited sources.

10% profile completeness
14 claims from 6 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Oct 12, 2026
Follow

Get changes to Liquid Web

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Liquid Web.” /facilities/liquid-web-eaton-county-mi. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_liquid_web_eaton_county_mi_2026,
  title = {{Liquid Web}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/liquid-web-eaton-county-mi}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
23,100 sq ft[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Consumers Energy CO · MISO
Substation: Delta Energy Park Substation (138 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalOct 12, 2026
    Community map
    • Oct 12, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Liquid Web
  2. substation
    Delta Energy Park Substation (138 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 1.36 km away. Proximity does not establish that it serves the site.
  3. transmission
    138 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.74 km away). Not confirmed as the supply path.
  4. utility
    Consumers Energy CO[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    MISO[3]
    Service territoryLikely
    Balancing authority: MISO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

  • Delta Energy Park (Natural Gas, 224 MW) is 1.2 km away[6]
    EIA plant within 1.5 km; proximity does not establish that it supplies the facility
    Natural gasCo-located224 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Unverified

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits1

  • Delta Energy Park (Natural Gas, 224 MW) is 1.2 km away224 MW[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Natural gas · Co-located

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for Consumers Energy CO. Know one? Add a source

Location & imagery

Mapped outline
Coordinates
42.68796, -84.64311
County
Eaton County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Most likely retail provider among 4 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: City of Lansing - (Mi), Tri-County Electric Coop (Mi), Wolverine Power Supply Coop.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
MISO[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
MISO[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Delta Energy Park Substation (138 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
1.4 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
138 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
9.81¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Michigan statewide average, July 2026.

State avg. commercial price
16.46¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Michigan statewide average, July 2026.

Generation within 50 km
731 MW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

18 EIA-reported plants within 50 km.

Generation queued in county
928 MW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived

4 active generation interconnection requests in Eaton County: Storage 750 MW, Solar 178 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
46 kV line · Consumers EnergyTransmission line0.05 km46 kV[1]
138 kV line · Lansing Board of Water & LightTransmission line0.74 km138 kV[1]
Enterprise - Oneida · ITCTransmission line1.24 km138 kV[1]
Delhi - Island Road · ITCTransmission line1.29 km138 kV[1]
Davis - Oneida · Lansing Board of Water and LightTransmission line1.53 km138 kV[1]
Davis - Oneida;Enterprise - Oneida · ITCTransmission line2 km138 kV[1]
Delta Energy Park · Lansing Board of Water and LightPower plant (Natural Gas)1.2 km224 MW[6]
Lansing Bwl Reo Town Plant · Lansing Board of Water and LightPower plant (Natural Gas)8.3 km75 MW[6]
T B Simon Power Plant · Michigan State UniversityPower plant (Natural Gas)13.5 km126 MW[6]
Blue Elk III Solar, LLC · Blue Elk III Solar, LLCPower plant (Solar)19.6 km20 MW[6]
Blue Elk II Solar, LLC · Blue Elk II Solar, LLCPower plant (Solar)24.5 km20 MW[6]
Bingham Solar, LLC · National Grid RenewablesPower plant (Solar)37.2 km20 MW[6]
Shipsterns Solar, LLC · Shipsterns Solar, LLCPower plant (Solar)44.2 km20 MW[6]
River Fork Solar, LLC · River Fork Solar, LLCPower plant (Solar)46.1 km149 MW[6]
Delta Energy Park Substation · Lansing Board of Water & LightSubstation1.36 km138 kV[1]
Erickson Substation · Lansing Board of Water and LightSubstation1.45 km138 kV[1]
Olds 5 Substation · Lansing Board of Water and LightSubstation2.29 km138 kV[1]
Canal Substation · Lansing Board of Water & LightSubstation2.51 km138 kV[1]
Canal Substation · Consumers EnergySubstation2.79 km138 kV[1]
Consumers Energy substation · Consumers EnergySubstation2.82 km46 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
J3992 at MAJESTIC - ONEIDA 345.0kVMISO J3992StorageIn study · proposed 2028-04400 MW[4]
J3836 at ONEIDAMISO J3836StorageIn study · proposed 2028-10250 MW[4]
J4043 at OneidaMISO J4043SolarIn study · proposed 2028-04178 MW[4]
J4128 at Clinton InterconnectionMISO J4128StorageIn study · proposed 2030-02100 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
23,100 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

14
FieldValueSourceConfidenceAs ofStatus
NameLiquid Webway/544536822 name=Liquid Web[1] Likely2026-10-12Shown
StatusOperating[1] derivedUnverified2026-10-12Shown
Websitehttps://www.liquidweb.com/[1] Likely2026-10-12Shown
UtilityConsumers Energy COterritory 4254: CONSUMERS ENERGY CO (INVESTOR OWNED, CMS ENERGY CORPORATION)[2] derivedUnverified2022Shown
ISO / RTOMISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC..[3] derivedLikely—Shown
Balancing authorityMISO[2] derivedLikely—Shown
Nearest mapped substationDelta Energy Park Substation (138 kV)way/1216871800[1] derivedLikely2026-09-28Shown
Distance to substation1.4 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby138 kV[1] derivedLikely2026-09-28Shown
Generation queued in county928 MW[4] derivedConfirmed2026-10-12Shown
State avg. industrial price9.81¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price16.46¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km731 MW[6] derivedConfirmed202502Shown
Building footprint23,100 sq ft[1] derivedLikely2026-10-12Shown