DC
/

Iron Mountain AZP-2

OperatingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.ColocationBuildingPhoenix, Maricopa County, Arizona

Iron Mountain AZP-2 is an operating colocation in Phoenix, Arizona. Operated or owned by Iron Mountain. Power capacity has not been disclosed or collected yet. Verification: verified operating. 7 cited sources.

Part of Iron Mountain — Phoenix, AZ campus

30% profile completeness
25 claims from 7 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Oct 12, 2026
Follow

Get changes to Iron Mountain AZP-2

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Iron Mountain AZP-2.” /facilities/iron-mountain-azp-2-phoenix-az. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_iron_mountain_azp_2_phoenix_az_2026,
  title = {{Iron Mountain AZP-2}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/iron-mountain-azp-2-phoenix-az}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Energized — operating
High confidence
Project verification
Verified operating
Operation documented by government record.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Salt River Project · None (non-RTO region)
Substation: Unnamed substation (69 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredSep 1, 2015
    Government record
    • Sep 1, 2015 · Land acquisition / deed recorded[2]
    • Sep 1, 2015 · Deed/transfer recorded for parcel 125-08-002C: $8,550,000.[2]
    • Feb 1, 2016 · Deed recorded for parcel 125-08-002C (owner of record: 4802 E Van Buren LLC).[2]
    • Oct 12, 2026 · Owner of record in county parcel data[2]
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalOct 12, 2026
    Community map · Government record
    • Oct 12, 2026 · Reported status: operating[1]
    • Oct 12, 2026 · County land use: Property use code 1507[2]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Government record, Community map.

Grid path

  1. facility
    Iron Mountain AZP-2
  2. substation
    Unnamed substation (69 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.15 km away. Proximity does not establish that it serves the site.
  3. transmission
    69 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.04 km away). Not confirmed as the supply path.
  4. utility
    Salt River Project[3]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    None (non-RTO region)[4]
    Service territoryLikely
    Balancing authority: SRP
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for Salt River Project. Know one? Add a source

Location & imagery

Mapped outline
Coordinates
33.45200, -111.97791
Address
4802 East Van Buren Street, Phoenix, AZ 85008[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
County
Maricopa County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Property owner of record
Operator
Utility

Most likely retail provider among 12 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Wapa-- Western Area Power Administration, Electrical Dist No8 Maricopa, City of Mesa - (Az), Usbia-San Carlos Project, Gila River Indian Utility Authority (Gricua), Maricopa County M W C Dist #1, ….

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
None (non-RTO region)[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Outside all ISO/RTO footprints; balancing authority shown separately.

Balancing authority
SRP[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Unnamed substation (69 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.2 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
69 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
9.35¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Arizona statewide average, July 2026.

State avg. commercial price
13.12¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Arizona statewide average, July 2026.

Generation within 50 km
4.65 GW[7]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

31 EIA-reported plants within 50 km.

Generation queued in county
1.12 GW[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived

5 active generation interconnection requests in Maricopa County: Solar + storage 1,100 MW, Solar 20 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
69 kV lineTransmission line0.04 km69 kV[1]
Ocotillo · Arizona Public Service CoPower plant (Natural Gas)6.9 km605 MW[7]
Kyrene · Salt River ProjectPower plant (Natural Gas)11.4 km525 MW[7]
West Phoenix · Arizona Public Service CoPower plant (Natural Gas)16.8 km909 MW[7]
Superstition Energy Storage · Superstition Energy Storage, LLCPower plant (Batteries)17.1 km90 MW[7]
Agua Fria · Salt River ProjectPower plant (Natural Gas)24.9 km741 MW[7]
Santan · Salt River ProjectPower plant (Natural Gas)25 km1.29 GW[7]
Sierra Estrella Energy Storage · Sierra Estrella Energy Storage, LLCPower plant (Batteries)31.5 km250 MW[7]
Westwing · AES Clean EnergyPower plant (Batteries)43.3 km82 MW[7]
Unnamed substationSubstation0.15 km69 kV[1]
Unnamed substationSubstation0.43 km69 kV[1]
Unnamed substationSubstation1.13 km69 kV[1]
Hohokam Substation · Arizona Public ServiceSubstation1.22 km69 kV[1]
40th Place Substation · Arizona Public ServiceSubstation1.51 km69 kV[1]
Unnamed substationSubstation1.57 km0.75 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
HARQUAHALA FLATS 2CAISO 2027Solar + storageIn study · proposed 2028-04400 MW[5]
HARQUAHALA SUNRISECAISO 1678Solar + storageIn study · proposed 2030-04300 MW[5]
VULCANCAISO 1534Solar + storageIn study · proposed 2027-12250 MW[5]
HARQUAHALA SUNRISE 2CAISO 2029Solar + storageIn study · proposed 2026-09150 MW[5]
AGUA CALIENTE SOLAR 2CAISO 1222SolarIn study · proposed 2016-1220 MW[5]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    Sep 1, 2015[2]
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year
  • $135.8M[2]
    Full cash value · tax year 2027 · parcel 125-08-002C
  • $81.3M[2]
    Limited property value (taxable basis) · tax year 2027 · parcel 125-08-002C
  • $133.4M[2]
    Full cash value · tax year 2026 · parcel 125-08-002C
Recorded transactions
Sale prices from recorded deeds
  • $8.6M[2]
    Recorded sale · Sep 1, 2015 · parcel 125-08-002C
Model estimates
Our model — not an appraisal

None sourced yet

ParcelRecord ownerAcresZoning / useBuilding sq ftSource
125-08-002C
Maricopa County, AZ
4802 E VAN BUREN LLC
1101 ENTERPRISE DR ROYERSFORD PA USA 19468
9.01CONTACT LOCAL JURISDICTION · Property use code 1507—[2]
Site area
9 acres[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed

Sum of county land area across parcels.

Sources disagree. Also reported: 10.7 acres[1] (likely)
Land use
Property use code 1507[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Annual property tax
Not yet sourced
Nearby comparable transactions

Size

Parcel / land records
125-08-002C (Maricopa County)[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

  1. Sep 1, 2015[2]

    Deed/transfer recorded for parcel 125-08-002C: $8,550,000.

  2. Feb 1, 2016[2]

    Deed recorded for parcel 125-08-002C (owner of record: 4802 E Van Buren LLC).

Other buildings on this campus

1

All claims (provenance audit)

25
FieldValueSourceConfidenceAs ofStatus
NameIron Mountain AZP-2way/685011021 name=Iron Mountain AZP-2[1] Likely2026-10-12Shown
StatusOperating[1] derivedUnverified2026-10-12Shown
Facility typeColocation[1] derivedUnverified2026-10-12Shown
Websitehttps://www.ironmountain.com/data-centers/locations/phoenix-data-center[1] Likely2026-10-12Shown
Address4802 East Van Buren Street, Phoenix, AZ 85008[1] Likely2026-10-12Shown
Property owner of record4802 E Van Buren LLCParcel 125-08-002C: 4802 E VAN BUREN LLC[2] Confirmed2026-10-12Shown
OperatorIron Mountainoperator=Iron Mountain[1] Likely2026-10-12Shown
UtilitySalt River Projectterritory 16572: SALT RIVER PROJECT (POLITICAL SUBDIVISION, SALT RIVER PROJECT)[3] derivedUnverified2022Shown
ISO / RTONone (non-RTO region)[4] derivedLikely—Shown
Balancing authoritySRP[3] derivedLikely—Shown
Nearest mapped substationUnnamed substation (69 kV)way/136759056[1] derivedLikely2026-09-28Shown
Distance to substation0.2 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby69 kV[1] derivedLikely2026-09-28Shown
Generation queued in county1.12 GW[5] derivedConfirmed2026-10-12Shown
State avg. industrial price9.35¢/kWh[6] Confirmed2026-07Shown
State avg. commercial price13.12¢/kWh[6] Confirmed2026-07Shown
Generation within 50 km4.65 GW[7] derivedConfirmed202502Shown
Site area10.7 acres[1] derivedLikely2026-10-12Superseded / alternative
Site area9 acres[2] Confirmed2026-10-12Shown
Parcel / land records125-08-002C (Maricopa County)[2] Confirmed2026-10-12Shown
Assessed value (official)$135.8M[2] Confirmed2027Shown
Last recorded sale price$8.6M[2] Confirmed2015-09-01Shown
Last recorded sale dateSep 1, 2015[2] Confirmed2015-09-01Shown
Land useProperty use code 1507[2] Confirmed2026-10-12Shown
Land acquiredSep 1, 2015[2] derivedConfirmed2026-10-12Shown