Greenidge Power Plant and Data Center

OperatingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.UnclassifiedBuildingYates County, New York

Greenidge Power Plant and Data Center is an operating data center in New York. Operated or owned by Greenidge Generation Holdings Inc.. Power capacity has not been disclosed or collected yet. Verification: unverified. 5 cited sources.

20% profile completeness
13 claims from 5 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Oct 12, 2026
Follow

Get changes to Greenidge Power Plant and Data Center

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Greenidge Power Plant and Data Center.” /facilities/greenidge-power-plant-and-data-center-yates-county-ny. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_greenidge_power_plant_and_data_center_ya_2026,
  title = {{Greenidge Power Plant and Data Center}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/greenidge-power-plant-and-data-center-yates-county-ny}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
95,900 sq ft[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
New York State Elec & Gas Corp · NYISO
Substation: Unnamed substation (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalOct 12, 2026
    Community map
    • Oct 12, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Greenidge Power Plant and Data Center
  2. substation
    Unnamed substation[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.05 km away. Proximity does not establish that it serves the site.
  3. transmission
    115 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.19 km away). Not confirmed as the supply path.
  4. utility
    New York State Elec & Gas Corp[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    NYISO[3]
    Service territoryLikely
    Balancing authority: NYIS
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

  • Greenidge Generation LLC (Natural Gas, 105 MW) is 0.1 km away[5]
    EIA plant within 1.5 km; proximity does not establish that it supplies the facility
    Natural gasCo-located105 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Unverified

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits1

  • Greenidge Generation LLC (Natural Gas, 105 MW) is 0.1 km away105 MW[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Natural gas · Co-located

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for New York State Elec & Gas Corp. Know one? Add a source

Location & imagery

Mapped outline
Coordinates
42.67938, -76.94874
County
Yates County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Location falls inside this utility's retail service territory.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
NYISO[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
NYIS[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Unnamed substation[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.1 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
115 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
10.81¢/kWh[4]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

New York statewide average, July 2026.

State avg. commercial price
24.18¢/kWh[4]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

New York statewide average, July 2026.

Generation within 50 km
419 MW[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

59 EIA-reported plants within 50 km.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
115 kV lineTransmission line0.19 km115 kV[1]
Greenidge Generation LLC · Greenidge Generation Holdings LLCPower plant (Natural Gas)0.1 km105 MW[5]
Ontario Lfgte · Seneca Energy IIPower plant (Biomass)22.9 km11 MW[5]
Seneca Energy · Seneca Energy IIPower plant (Biomass)29 km18 MW[5]
Lansing Renewables, LLC · Lansing Renewables, LLCPower plant (Solar)32.8 km8 MW[5]
Newfield Community Solar LLC · Newfield Solar LLCPower plant (Solar)44.9 km12 MW[5]
Cornell University Central Heat · Cornell UniversityPower plant (Natural Gas)46.8 km33 MW[5]
Dutch Hill Wind Project · Evergreen Wind, LLCPower plant (Wind)47.2 km38 MW[5]
Ellis Solar · Altus Power America Management, LLCPower plant (Solar)49.6 km18 MW[5]
Unnamed substationSubstation0.05 km—[1]
Unnamed substationSubstation0.19 km115 kV[1]
Unnamed substationSubstation0.46 km—[1]
NYSEG substation · NYSEGSubstation0.63 km—[1]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
95,900 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)
  • Load interconnection request
    60 MWSep 27, 2026[6]AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.→200 MWSep 27, 2026[6]AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.

Timeline

No dated events sourced yet.

All claims (provenance audit)

13
FieldValueSourceConfidenceAs ofStatus
NameGreenidge Power Plant and Data Centerway/253670255 name=Greenidge Power Plant and Data Center[1] Likely2026-10-12Shown
StatusOperating[1] derivedUnverified2026-10-12Shown
OperatorGreenidge Generation Holdings Inc.operator=Greenidge Generation Holdings Inc.[1] Likely2026-10-12Shown
UtilityNew York State Elec & Gas Corpterritory 13511: NEW YORK STATE ELEC & GAS CORP (INVESTOR OWNED, IBERDROLA USA I[2] derivedLikely2022Shown
ISO / RTONYISONEW YORK INDEPENDENT SYSTEM OPERATOR[3] derivedLikely—Shown
Balancing authorityNYIS[2] derivedLikely—Shown
Nearest mapped substationUnnamed substationway/1485150951[1] derivedLikely2026-09-28Shown
Distance to substation0.1 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby115 kV[1] derivedLikely2026-09-28Shown
State avg. industrial price10.81¢/kWh[4] Confirmed2026-07Shown
State avg. commercial price24.18¢/kWh[4] Confirmed2026-07Shown
Generation within 50 km419 MW[5] derivedConfirmed202502Shown
Building footprint95,900 sq ft[1] derivedLikely2026-10-12Shown