DC
/

Google Storey County

Operating + expandingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Apr 13, 2026.AI campusCampusStorey County, Nevada

Google Storey County is an operating + expanding ai campus in Nevada. Operated or owned by Google. Current power: 214 MW (estimated). Planned capacity: 389 MW (estimated). Verification: verified operating. 10 cited sources.

70% profile completeness
43 claims from 10 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Apr 13, 2026
Follow

Get changes to Google Storey County

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Google Storey County.” /facilities/google-storey-county-storey-county-nv. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_google_storey_county_storey_county_nv_2026,
  title = {{Google Storey County}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/google-storey-county-storey-county-nv}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
214 MW[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Apr 13, 2026.Likelyestimated
Planned capacity
389 MW[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Apr 13, 2026.Likelyestimated
Floor area
Not yet sourced
Buildings (planned)
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Apr 13, 2026.Likelyderived
Capital cost / investment
$6.1B[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Apr 13, 2026.Likelyestimated
First operational
Aug 30, 2023[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Apr 13, 2026.Likelyderived

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Remaining capacity: H1 2027 – H2 2028
Medium confidencewindow, not a prediction
Project verification
Verified operating
Operation documented by satellite imagery.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
NV Energy · None (non-RTO region)
Substation: On-site substation

Power reality

Announced
389 MW[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Research estimate of planned capacity (no company figure found)
Interconnection request
No record
Contracted / approved
No record
Under construction
175 MW[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Building 3 under construction (satellite-tracked phases)
Operational
214 MW[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Estimated from buildings observed operational
  • ⚠ No public interconnection record for this load — None (non-RTO region) does not publish large-load requests.
  • ⚠ No permit record linked to this site yet.
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.
How the time-to-power window was estimated
Evidence used
  • Current stage: Operational (furthest stage with documented evidence)[1]
  • Stated date: Next projected milestone: 2027-06-30 (modeled/speculative)[1]
  • Required: 389 MW
Assumptions
  • From “Under construction”, large loads have typically taken 0.5–2 more years to first power (editorial range; see Methodology).
  • The window is a range of plausible outcomes under these assumptions, not a forecast. It moves as new filings, queue updates or imagery arrive.
Window: H1 2027 – H2 2028

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionAug 30, 2023
    Model estimate · Satellite imagery
    • Aug 30, 2023 · Reported status: expanding[1]
    • Aug 30, 2023 · Construction start[1]
    • Aug 30, 2023 · Building 1, which was first operational in 2021, has increased power capacity by about 75%. This is based on the expansion of the dry cooling array from 4 to 7 columns (seen on [Go[1]
  3. EnergizationJun 30, 2025
    Satellite imagery
    • Jun 30, 2025 · Building 2 is operational. Based on a [Google Earth image](https://earth.google.com/web/@39.49733738,-119.43113543,1552.05877612a,1467.7067385d,35y,0h,0t,0r/) showing complete buil[1]
  4. OperationalJun 30, 2025
    Satellite imagery
    • Jun 30, 2025 · Building 2 is operational. Based on a [Google Earth image](https://earth.google.com/web/@39.49733738,-119.43113543,1552.05877612a,1467.7067385d,35y,0h,0t,0r/) showing complete buil[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Model estimate, Satellite imagery.

Grid path

  1. facility
    Google Storey County
  2. substation
    On-site substation[1]
    Satellite imageryLikely
    2 substation outlines traced inside the campus on satellite imagery
  3. transmission
    120 kV line[5]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.54 km away). Not confirmed as the supply path.
  4. utility
    NV Energy[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    None (non-RTO region)[4]
    Service territoryLikely
    Balancing authority: NEVP
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling1

  • 0.001 million gal/day[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 30, 2023.Aug 30, 2023modeled water use

    Epoch AI's modeled estimate at the latest observed milestone, in million gallons per day. Not a permit or metered figure.

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for NV Energy. Know one? Add a source

Location & imagery

Mapped outline
Coordinates
39.49558, -119.43176
County
Storey County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
Power supply
Utility:

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Owner
Google[1]Confirmed
End user
Utility

Location falls inside this utility's retail service territory.

Power (all fields)

Current facility power
214 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Apr 13, 2026.Likelyestimated

Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.

Current IT capacity
161 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Apr 13, 2026.Likelyestimated

Estimated IT load currently online, based on buildings observed operational.

Planned capacity
389 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Apr 13, 2026.Likelyestimated

Projected facility power at the last tracked milestone (2027-06-30); not necessarily full build-out.

Estimated annual consumption
1,312 GWh/yr[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Speculativeestimated

214 MW × 8,760 h × 70% utilization.

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
None (non-RTO region)[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Outside all ISO/RTO footprints; balancing authority shown separately.

Balancing authority
NEVP[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Highest-voltage line nearby
120 kV[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
10.04¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Nevada statewide average, July 2026.

State avg. commercial price
9.72¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Nevada statewide average, July 2026.

Generation within 50 km
1.61 GW[7]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

24 EIA-reported plants within 50 km.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
120 kV lineTransmission line0.54 km120 kV[5]
Western 102 Power Plant · Nevada Gold MinesPower plant (Natural Gas)9.9 km117 MW[7]
Tracy · Sierra Pacific Power CoPower plant (Natural Gas)10.9 km954 MW[7]
Turquoise Nevada, LLC · Greenbacker Renewable Energy CorporationPower plant (Solar)11.8 km60 MW[7]
Richard Burdette Geothermal · Ormat Nevada IncPower plant (Geothermal)30.1 km20 MW[7]
Steamboat Hills LP · Ormat Nevada IncPower plant (Geothermal)32 km27 MW[7]
Patua Acquisition Project, LLC · Patua Acquisition Company, LLCPower plant (Geothermal)32.4 km41 MW[7]
Fort Churchill · Sierra Pacific Power CoPower plant (Natural Gas)48.3 km226 MW[7]
Brady · Ormat Nevada IncPower plant (Geothermal)49.2 km22 MW[7]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    Aug 30, 2023[1]
  5. First operational
    Aug 30, 2023[1]
  6. Expected completion
    Jun 30, 2027[1]
    Projected
Planned capacity
389 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Apr 13, 2026.Likelyestimated

Projected facility power at the last tracked milestone (2027-06-30); not necessarily full build-out.

Buildings (planned)
3[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Apr 13, 2026.Likelyderived

Count of building outlines traced on satellite imagery.

Buildings operational
2[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Apr 13, 2026.Likelyestimated
PhaseStatusAdded MWCompleted / expectedSource
Building 1operational107 MWAug 30, 2023[1]
Building 2operational107 MWJun 30, 2025[1]
Building 3under construction175 MWJun 30, 2027 (projected)[1]

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Capital cost / investment
$6.1B[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Apr 13, 2026.Likelyestimated

Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

Compute

Chip types
TPU v5e, TPU v4, TPU v6e, TPU v5p[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Apr 13, 2026.Confirmed
Compute (H100-equivalents)
133,900[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Apr 13, 2026.Likelyestimated

What changed (last 3 years)

Follow this facility (RSS)
  • Current IT capacity
    81 MWAug 30, 2023[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→161 MWJun 30, 2025[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
  • Current facility power
    107 MWAug 30, 2023[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→214 MWJun 30, 2025[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
  • Buildings operational
    1Aug 30, 2023[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→2Jun 30, 2025[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.

Timeline

Construction start: Aug 30, 2023[1]
First operational: Aug 30, 2023[1]
  1. Aug 30, 2023107 MW facility power· 1 buildings operational[1]

    Building 1, which was first operational in 2021, has increased power capacity by about 75%. This is based on the expansion of the dry cooling array from 4 to 7 columns (seen on Google Earth). Its backup generators also grew from 18 to 33, an 83% increase. Around this time (2023 Q3) the quarterly PUE of the campus is 1.24, down from the initial 1.29 in 2022 Q3. Since no other buildings have been added, these changes indicate an increase in power density, which may entail a new generation of hardware getting installed.

  2. Mar 11, 2025107 MW facility power· 1 buildings operational[1]

    Building 2 now has generators in place, but there is still a crane and construction work present.

  3. Jun 30, 2025214 MW facility power· 2 buildings operational[1]

    Building 2 is operational. Based on a Google Earth image showing complete building shell, mechanical equipment and generators, plus cars parked at the front.

  4. Sep 28, 2025214 MW facility power· 2 buildings operational[1]

    Building 3 foundation is underway. Building 2 exterior looks totally clean/landscaped.

  5. Apr 13, 2026214 MW facility power· 2 buildings operational[1]

    Building 3 has a partially complete shell, electrical and mechanical equipment. Building 4 foundation is underway.

  6. Jun 30, 2027Projected389 MW facility power· 3 buildings operational[1]

    Building 3 is estimated to be operational. We estimate the operational date by analogy to the time that Building 1 took to go from a foundation to being operational. The power capacity is based on the number of generators reported in an air quality permit application (p.92-93). The dry cooler array is more than double the size of the Building 1 array, which suggests an even larger power capacity than we estimate, but we believe the generator-based estimate is more reliable here.

All claims (provenance audit)

43
FieldValueSourceConfidenceAs ofStatus
NameGoogle Storey County[1] Likely2026-04-13Shown
StatusOperating + expanding[1] derivedLikely2023-08-30Superseded / alternative
StatusOperating + expanding[1] derivedLikely2025-03-11Superseded / alternative
StatusOperating + expanding[1] derivedLikely2025-06-30Superseded / alternative
StatusOperating + expanding[1] derivedLikely2025-09-28Superseded / alternative
StatusOperating + expanding[1] derivedLikely2026-04-13Shown
Facility typeAI campus[1] derivedLikely2026-04-13Shown
OwnerGoogleOwner: Google[1] Confirmed2026-04-13Shown
End usersGoogle DeepMindUsers: Google DeepMind[1] Speculative2026-04-13Shown
UtilityNV Energyterritory 17166: SIERRA PACIFIC POWER CO (INVESTOR OWNED, NEVADA ENERGY)[2] derivedLikely2022Shown
Current facility power214 MW[1] estimatedLikely2026-04-13Shown
Current facility power107 MW[1] estimatedLikely2023-08-30Superseded / alternative
Current facility power107 MW[1] estimatedLikely2025-03-11Superseded / alternative
Current facility power214 MW[1] estimatedLikely2025-06-30Superseded / alternative
Current facility power214 MW[1] estimatedLikely2025-09-28Superseded / alternative
Current IT capacity161 MW[1] estimatedLikely2026-04-13Shown
Current IT capacity81 MW[1] estimatedLikely2023-08-30Superseded / alternative
Current IT capacity81 MW[1] estimatedLikely2025-03-11Superseded / alternative
Current IT capacity161 MW[1] estimatedLikely2025-06-30Superseded / alternative
Current IT capacity161 MW[1] estimatedLikely2025-09-28Superseded / alternative
Planned capacity389 MW[1] estimatedLikely2026-04-13Shown
Estimated annual consumption1,312 GWh/yr[3] estimatedSpeculative2026-10-12Shown
ISO / RTONone (non-RTO region)[4] derivedLikely—Shown
Balancing authorityNEVP[2] derivedLikely—Shown
Highest-voltage line nearby120 kV[5] derivedLikely2026-09-28Shown
State avg. industrial price10.04¢/kWh[6] Confirmed2026-07Shown
State avg. commercial price9.72¢/kWh[6] Confirmed2026-07Shown
Generation within 50 km1.61 GW[7] derivedConfirmed202502Shown
Buildings (planned)3[1] derivedLikely2026-04-13Shown
Buildings operational2[1] estimatedLikely2026-04-13Shown
Buildings operational1[1] estimatedLikely2023-08-30Superseded / alternative
Buildings operational1[1] estimatedLikely2025-03-11Superseded / alternative
Buildings operational2[1] estimatedLikely2025-06-30Superseded / alternative
Buildings operational2[1] estimatedLikely2025-09-28Superseded / alternative
Capital cost / investment$6.1B[1] estimatedLikely2026-04-13Shown
Compute (H100-equivalents)133,900[1] estimatedLikely2026-04-13Shown
Chip typesTPU v5e[1] Confirmed2026-04-13Shown
Chip typesTPU v4[1] Confirmed2026-04-13Shown
Chip typesTPU v6e[1] Confirmed2026-04-13Shown
Chip typesTPU v5p[1] Confirmed2026-04-13Shown
Construction startAug 30, 2023[1] derivedLikely2026-04-13Shown
First operationalAug 30, 2023[1] derivedLikely2026-04-13Shown
Expected completionJun 30, 2027[1] estimatedSpeculative2026-04-13Shown