Google Papillion
Google Papillion is an operating ai campus in Nebraska. Operated or owned by Google. Current power: 284 MW (estimated). Verification: verified operating. 10 cited sources.
Follow
Get changes to Google Papillion
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Google Papillion.” /facilities/google-papillion-sarpy-county-ne. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_google_papillion_sarpy_county_ne_2026,
title = {{Google Papillion}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/google-papillion-sarpy-county-ne}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Model estimate, Satellite imagery.
Grid path
- →facilityGoogle Papillion
- →substationSatellite imageryLikely4 substation outlines traced inside the campus on satellite imagery; OSM maps Omaha Public Power District substation 0.16 km away
- →transmission345 kV line[5]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.22 km away). Not confirmed as the supply path.
- →utilityOmaha Public Power District[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling2
- 0.088 million gal/day[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 3, 2024.Aug 3, 2024modeled water use
Epoch AI's modeled estimate at the latest observed milestone, in million gallons per day. Not a permit or metered figure.
- Evaporative (cooling towers)[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Feb 15, 2024.Feb 15, 2024cooling
“Building 2 assumed operational due to vapor from cooling towers.”
Named in Epoch AI's satellite-imagery notes for this date.
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for Omaha Public Power District. Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 41.13543, -96.14942
- Address
- 14651-15249 Gold Coast Rd 68138 Papillion Nebraska, USA[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of May 4, 2026.Likely
- County
- Sarpy County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developer
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workload
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- End user
- Utility
Location falls inside this utility's retail service territory.
Power (all fields)
- Current facility power
- 284 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of May 4, 2026.Likelyestimated
Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.
- Current IT capacity
- 237 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of May 4, 2026.Likelyestimated
Estimated IT load currently online, based on buildings observed operational.
- Estimated annual consumption
- 1,741 GWh/yr[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Speculativeestimated
284 MW × 8,760 h × 70% utilization.
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- SPP[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Location falls inside this ISO/RTO footprint.
- Balancing authority
- SWPP[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Omaha Public Power District substation (345 kV)[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 0.2 km[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 345 kV[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 10.00¢/kWh[7]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Nebraska statewide average, July 2026.
- State avg. commercial price
- 9.39¢/kWh[7]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Nebraska statewide average, July 2026.
- Generation within 50 km
- 3.29 GW[8]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
15 EIA-reported plants within 50 km.
- Generation queued in county
- 258 MW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived
1 active generation interconnection requests in Sarpy County: Other 258 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 161 kV line · Omaha Public Power District | Transmission line | 0.01 km | 161 kV | [5] |
| 345 kV line · Omaha Public Power District | Transmission line | 0.22 km | 345 kV | [5] |
| 69 kV line | Transmission line | 0.91 km | 69 kV | [5] |
| Sarpy County · Omaha Public Power District | Power plant (Natural Gas) | 15.5 km | 316 MW | [8] |
| Platteview Solar LLC · AES Distributed Energy | Power plant (Solar) | 20.2 km | 81 MW | [8] |
| Jones Street · Omaha Public Power District | Power plant (Petroleum) | 22.9 km | 124 MW | [8] |
| Cass County · Omaha Public Power District | Power plant (Natural Gas) | 26 km | 324 MW | [8] |
| Walter Scott Jr Energy Center · MidAmerican Energy Co | Power plant (Coal) | 26.3 km | 1.51 GW | [8] |
| North Omaha · Omaha Public Power District | Power plant (Coal) | 27.5 km | 564 MW | [8] |
| Lon Wright · City of Fremont - (NE) | Power plant (Coal) | 41.7 km | 159 MW | [8] |
| Terry Bundy Generating Station · Lincoln Electric System | Power plant (Natural Gas) | 46.3 km | 171 MW | [8] |
| Omaha Public Power District substation · Omaha Public Power District | Substation | 0.16 km | 345 kV | [5] |
| Unnamed substation | Substation | 0.33 km | 161 kV | [5] |
| Unnamed substation | Substation | 0.36 km | 161 kV | [5] |
| Unnamed substation | Substation | 0.43 km | 161 kV | [5] |
| Unnamed substation | Substation | 0.72 km | 161 kV | [5] |
| Hwy 50 Substation · Omaha Public Power District | Substation | 1.34 km | 161 kV | [5] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| GEN-2020-031 at Substation 1363; 161kV SubstationSPP GEN-2020-031 | Other | IA signed · proposed 2028-02 | 258 MW | [6] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction startMar 4, 2020[1]
- First operationalJan 23, 2023[1]
- Expected completion—
- Buildings (planned)
- 5[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of May 4, 2026.Likelyderived
Count of building outlines traced on satellite imagery.
- Buildings operational
- 3[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of May 4, 2026.Likelyestimated
Real estate
None sourced yet
None sourced yet
None sourced yet
- Capital cost / investment
- $9B[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of May 4, 2026.Likelyestimated
Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
Compute
- Chip types
- TPU v4, TPU v5e, TPU v5p[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of May 4, 2026.Confirmed
- Compute (H100-equivalents)
- 100,600[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of May 4, 2026.Likelyestimated
What changed (last 3 years)
Follow this facility (RSS)- Current IT capacity79 MWJan 23, 2023[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→237 MWAug 3, 2024[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Current facility power95 MWJan 23, 2023[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→284 MWAug 3, 2024[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Buildings operational
- StatusOperating + expandingJan 23, 2023[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→OperatingMay 4, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Timeline
- Mar 4, 2020[1]
Land clearing begins for Building 1 of expansion.
- Oct 16, 2022[1]
Building 2 under construction. Building 3 begins construction.
Building 1 assumed operational due to vapor from cooling towers. Building 2 4/7 cooling towers installed. Building 3 roof complete coverage but unfinished.
Building 2 assumed operational due to vapor from cooling towers. Building 3 5/7 cooling towers installed.
Building 3 looks operational.
Land cleared for Building 4 and 5.
Building 4 shell mostly complete, Building 5 steel framing is underway.
Buildings on this campus
4All claims (provenance audit)
49| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Google Papillion | [1] | Likely | 2026-05-04 | Shown |
| Status | Under construction | [1] derived | Likely | 2020-03-04 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2022-10-16 | Superseded / alternative |
| Status | Operating + expanding | [1] derived | Likely | 2023-01-23 | Superseded / alternative |
| Status | Operating + expanding | [1] derived | Likely | 2024-02-15 | Superseded / alternative |
| Status | Operating + expanding | [1] derived | Likely | 2024-08-03 | Superseded / alternative |
| Status | Operating + expanding | [1] derived | Likely | 2025-11-03 | Superseded / alternative |
| Status | Operating | [1] derived | Likely | 2026-05-04 | Shown |
| Facility type | AI campus | [1] derived | Likely | 2026-05-04 | Shown |
| Address | 14651-15249 Gold Coast Rd 68138 Papillion Nebraska, USA | [1] | Likely | 2026-05-04 | Shown |
| Owner | GoogleOwner: Google | [1] | Confirmed | 2026-05-04 | Shown |
| End users | Google DeepMindUsers: Google DeepMind | [1] | Speculative | 2026-05-04 | Shown |
| Utility | Omaha Public Power Districtterritory 14127: OMAHA PUBLIC POWER DISTRICT (POLITICAL SUBDIVISION, OMAHA PUBLI | [2] derived | Likely | 2022 | Shown |
| Investors | GoogleInvestors: Google | [1] | Confirmed | 2026-05-04 | Shown |
| Current facility power | 284 MW | [1] estimated | Likely | 2026-05-04 | Shown |
| Current facility power | 95 MW | [1] estimated | Likely | 2023-01-23 | Superseded / alternative |
| Current facility power | 95 MW | [1] estimated | Likely | 2024-02-15 | Superseded / alternative |
| Current facility power | 284 MW | [1] estimated | Likely | 2024-08-03 | Superseded / alternative |
| Current facility power | 284 MW | [1] estimated | Likely | 2025-11-03 | Superseded / alternative |
| Current IT capacity | 237 MW | [1] estimated | Likely | 2026-05-04 | Shown |
| Current IT capacity | 79 MW | [1] estimated | Likely | 2023-01-23 | Superseded / alternative |
| Current IT capacity | 79 MW | [1] estimated | Likely | 2024-02-15 | Superseded / alternative |
| Current IT capacity | 237 MW | [1] estimated | Likely | 2024-08-03 | Superseded / alternative |
| Current IT capacity | 237 MW | [1] estimated | Likely | 2025-11-03 | Superseded / alternative |
| Estimated annual consumption | 1,741 GWh/yr | [3] estimated | Speculative | 2026-10-12 | Shown |
| ISO / RTO | SPPSOUTHWEST POWER POOL | [4] derived | Likely | — | Shown |
| Balancing authority | SWPP | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Omaha Public Power District substation (345 kV)way/844394350 | [5] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.2 km | [5] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 345 kV | [5] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 258 MW | [6] derived | Confirmed | 2026-10-12 | Shown |
| State avg. industrial price | 10.00¢/kWh | [7] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 9.39¢/kWh | [7] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 3.29 GW | [8] derived | Confirmed | 202502 | Shown |
| Buildings (planned) | 5 | [1] derived | Likely | 2026-05-04 | Shown |
| Buildings operational | 3 | [1] estimated | Likely | 2026-05-04 | Shown |
| Buildings operational | 0 | [1] estimated | Likely | 2020-03-04 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2022-10-16 | Superseded / alternative |
| Buildings operational | 1 | [1] estimated | Likely | 2023-01-23 | Superseded / alternative |
| Buildings operational | 1 | [1] estimated | Likely | 2024-02-15 | Superseded / alternative |
| Buildings operational | 3 | [1] estimated | Likely | 2024-08-03 | Superseded / alternative |
| Buildings operational | 3 | [1] estimated | Likely | 2025-11-03 | Superseded / alternative |
| Capital cost / investment | $9B | [1] estimated | Likely | 2026-05-04 | Shown |
| Compute (H100-equivalents) | 100,600 | [1] estimated | Likely | 2026-05-04 | Shown |
| Chip types | TPU v4 | [1] | Confirmed | 2026-05-04 | Shown |
| Chip types | TPU v5e | [1] | Confirmed | 2026-05-04 | Shown |
| Chip types | TPU v5p | [1] | Confirmed | 2026-05-04 | Shown |
| Construction start | Mar 4, 2020 | [1] derived | Likely | 2026-05-04 | Shown |
| First operational | Jan 23, 2023 | [1] derived | Likely | 2026-05-04 | Shown |