Data Center Lenexa
Data Center Lenexa is an operating data center in Lenexa, Kansas. Power capacity has not been disclosed or collected yet. Verification: unverified. 6 cited sources.
Follow
Get changes to Data Center Lenexa
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Data Center Lenexa.” /facilities/data-center-lenexa-lenexa-ks. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_data_center_lenexa_lenexa_ks_2026,
title = {{Data Center Lenexa}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/data-center-lenexa-lenexa-ks}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityData Center Lenexa
- →substationCollege Substation (161 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.6 km away. Proximity does not establish that it serves the site.
- →transmissionCollege-Olathe (161 kV)[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.16 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates1
- Large Load Power Service (LLPS) rate plan for loads over 75 MW[7]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Nov 2025.Nov 2025Evergy Metro · Kansas Corporation Commission · Approved (unanimous settlement)
“The provisions in the LLPS rate plans in both Kansas and Missouri apply to new or existing customers adding load in excess of 75 MWs. … reached a unanimous settlement agreement for the LLPS rate plan which the KCC approved in November 2025.”
Location & imagery
Mapped outline- Coordinates
- 38.92524, -94.77040
- Address
- 11200 Lakeview Avenue, Lenexa, KS 66219[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
- County
- Johnson County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: City of Kansas City - (Ks).
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- SPP[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Location falls inside this ISO/RTO footprint.
- Balancing authority
- SWPP[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- College Substation (161 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 0.6 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 161 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 8.52¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Kansas statewide average, July 2026.
- State avg. commercial price
- 12.04¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Kansas statewide average, July 2026.
- Generation within 50 km
- 4.43 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
27 EIA-reported plants within 50 km.
- Generation queued in county
- 778 MW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived
3 active generation interconnection requests in Johnson County: Solar 500 MW, Storage 278 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| College-Olathe · Evergy | Transmission line | 0.16 km | 161 kV | [1] |
| Craig - College · Evergy | Transmission line | 0.61 km | 161 kV | [1] |
| Craig - Pflumm · Evergy | Transmission line | 1.05 km | 161 kV | [1] |
| Craig - Pflumm;Craig - College · Evergy | Transmission line | 1.11 km | 161 kV | [1] |
| West Gardner · Evergy Metro | Power plant (Natural Gas) | 24.2 km | 315 MW | [6] |
| Nearman Creek · City of Kansas City - (KS) | Power plant (Coal) | 27.7 km | 315 MW | [6] |
| Northeast (Mo) · Evergy Metro | Power plant (Petroleum) | 28.5 km | 396 MW | [6] |
| Hawthorn · Evergy Metro | Power plant (Coal) | 34.1 km | 955 MW | [6] |
| South Harper · Evergy Missouri West | Power plant (Natural Gas) | 36.9 km | 321 MW | [6] |
| Greenwood (Mo) · Evergy Missouri West | Power plant (Natural Gas) | 41.5 km | 253 MW | [6] |
| Dogwood Energy Facility · Dogwood Power Management, LLC | Power plant (Natural Gas) | 43.3 km | 657 MW | [6] |
| Lawrence Energy Center · Evergy Kansas Central, Inc | Power plant (Coal) | 44.1 km | 488 MW | [6] |
| College Substation · Evergy | Substation | 0.6 km | 161 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| GEN-2017-195 at West Gardner 345kVSPP GEN-2017-195 | Solar | IA signed · proposed 2030-12 | 500 MW | [4] |
| GEN-2021-103 at Evergy's Atlantic Substation115kV busSPP GEN-2021-103 | Storage | IA signed · proposed 2030-03 | 150 MW | [4] |
| GEN-2017-196 at West Gardner 345kVSPP GEN-2017-196 | Storage | IA signed · proposed 2030-12 | 128 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- 44,600 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Unverifiedestimated
Estimated as footprint × 1 mapped floors; gross, not leasable, area.
- Building footprint
- 44,600 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Computed from the mapped OSM building outline.
- Floors
- 1[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
16| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Data Center Lenexaway/502927599 name=Data Center Lenexa | [1] | Likely | 2026-10-12 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-10-12 | Shown |
| Address | 11200 Lakeview Avenue, Lenexa, KS 66219 | [1] | Likely | 2026-10-12 | Shown |
| Utility | Evergy Metroterritory 10000: EVERGY METRO (INVESTOR OWNED, KANSAS CITY POWER & LIGHT CO) | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | SPPSOUTHWEST POWER POOL | [3] derived | Likely | — | Shown |
| Balancing authority | SWPP | [2] derived | Likely | — | Shown |
| Nearest mapped substation | College Substation (161 kV)way/48770536 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.6 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 161 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 778 MW | [4] derived | Confirmed | 2026-10-12 | Shown |
| State avg. industrial price | 8.52¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 12.04¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 4.43 GW | [6] derived | Confirmed | 202502 | Shown |
| Floor area | 44,600 sq ft | [1] estimated | Unverified | 2026-10-12 | Shown |
| Building footprint | 44,600 sq ft | [1] derived | Likely | 2026-10-12 | Shown |
| Floors | 1building:levels=1 | [1] | Likely | 2026-10-12 | Shown |