Cable & Wireless Cable Landing Station
Cable & Wireless Cable Landing Station is an operating data center in Shirley, New York. Power capacity has not been disclosed or collected yet. Verification: unverified. 5 cited sources.
Follow
Get changes to Cable & Wireless Cable Landing Station
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Cable & Wireless Cable Landing Station.” /facilities/cable-and-wireless-cable-landing-station-shirley-ny. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_cable_and_wireless_cable_landing_station_2026,
title = {{Cable \& Wireless Cable Landing Station}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/cable-and-wireless-cable-landing-station-shirley-ny}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityCable & Wireless Cable Landing Station
- →substationYaphank Substation[1]Proximity onlyUnverifiedNearest mapped substation, 0.83 km away. Proximity does not establish that it serves the site.
- →transmission138kV Transmission line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.85 km away). Not confirmed as the supply path.
- →utilityLong Island Power Authority[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for Long Island Power Authority. Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 40.84362, -72.88336
- Address
- 21 Ramsey Road, Shirley, 11967[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
- County
- Suffolk County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Fishers Island Utility CO INC.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- NYISO[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Location falls inside overlapping ISO-NE and NYISO footprints; chosen by the balancing areas of the overlapping utilities.
- Balancing authority
- NYIS[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Yaphank Substation[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 0.8 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 138 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 10.81¢/kWh[4]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
New York statewide average, July 2026.
- State avg. commercial price
- 24.18¢/kWh[4]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
New York statewide average, July 2026.
- Generation within 50 km
- 6.52 GW[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
61 EIA-reported plants within 50 km.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 69 kV line · Long Island Power Authority | Transmission line | 0.32 km | 69 kV | [1] |
| 138kV Transmission line · Long Island Power Authority | Transmission line | 0.85 km | 138 kV | [1] |
| Caithness Long Island Energy Center · Caithness Long Island, LLC | Power plant (Natural Gas) | 5.8 km | 317 MW | [5] |
| Holtsville · National Grid Generation LLC | Power plant (Petroleum) | 15.7 km | 532 MW | [5] |
| Port Jefferson · National Grid Generation LLC | Power plant (Natural Gas) | 20.2 km | 481 MW | [5] |
| Northport · National Grid Generation LLC | Power plant (Natural Gas) | 39.6 km | 1.6 GW | [5] |
| Bridgeport Energy Project · Bridgeport Energy LLC | Power plant (Natural Gas) | 44.1 km | 538 MW | [5] |
| Bridgeport Station · Generation Bridge II Connecticut, LLC | Power plant (Natural Gas) | 44.3 km | 483 MW | [5] |
| Milford Power Project · Milford Power Co LLC | Power plant (Natural Gas) | 46.1 km | 510 MW | [5] |
| New Haven Harbor · Generation Bridge II Connecticut, LLC | Power plant (Petroleum) | 49 km | 562 MW | [5] |
| Yaphank Substation · Long Island Power Authority | Substation | 0.83 km | — | [1] |
| Unnamed substation | Substation | 2.94 km | 69 kV | [1] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
- 36,800 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
13| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Cable & Wireless Cable Landing Stationway/459188725 name=Cable & Wireless Cable Landing Station | [1] | Likely | 2026-10-12 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-10-12 | Shown |
| Address | 21 Ramsey Road, Shirley, 11967 | [1] | Likely | 2026-10-12 | Shown |
| Utility | Long Island Power Authorityterritory 11171: LONG ISLAND POWER AUTHORITY (STATE, LONG ISLAND POWER AUTHORITY | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | NYISOISO NEW ENGLAND INC. | NEW YORK INDEPENDENT SYSTEM OPERATOR | [3] derived | Likely | — | Shown |
| Balancing authority | NYIS | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Yaphank Substationway/83469873 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.8 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 138 kV | [1] derived | Likely | 2026-09-28 | Shown |
| State avg. industrial price | 10.81¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 24.18¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 6.52 GW | [5] derived | Confirmed | 202502 | Shown |
| Building footprint | 36,800 sq ft | [1] derived | Likely | 2026-10-12 | Shown |