Argo Data Center
Argo Data Center is an under construction data center in Texas. Power capacity has not been disclosed or collected yet. Verification: unverified. 6 cited sources.
Part of Coreweave Helios
Follow
Get changes to Argo Data Center
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Argo Data Center.” /facilities/argo-data-center-dickens-county-tx. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_argo_data_center_dickens_county_tx_2026,
title = {{Argo Data Center}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/argo-data-center-dickens-county-tx}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
- ⚠ No public interconnection record for this load — ERCOT does not publish large-load requests.
- ⚠ No permit record linked to this site yet.
- ⚠ No announcement, filing or permit found for this site.
How the time-to-power window was estimated
- Evidence: Evidence is limited to community map.
- An estimate needs at least one dated development, permit, grid or construction record.
- The window is a range of plausible outcomes under these assumptions, not a forecast. It moves as new filings, queue updates or imagery arrive.
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Energization
- Operational
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityArgo Data Center
- →substationUnnamed substation (345 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.47 km away. Proximity does not establish that it serves the site.
- →transmission345 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.35 km away). Not confirmed as the supply path.
- →utilitySouth Plains Electric Coop INC[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
- Dickens (Batteries, 200 MW) is 1.4 km away[6]EIA plant within 1.5 km; proximity does not establish that it supplies the facilityBattery storageCo-located200 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Unverified
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits1
- Dickens (Batteries, 200 MW) is 1.4 km away200 MW[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Battery storage · Co-located
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for South Plains Electric Coop INC. Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 33.77788, -100.86812
- County
- Dickens County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 3 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Lighthouse Electric Coop, INC, AEP Texas North Company.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- ERCOT[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Location falls inside this ISO/RTO footprint.
- Balancing authority
- ERCO, SWPP[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Unnamed substation (345 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 0.5 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 345 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 7.07¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Texas statewide average, July 2026.
- State avg. commercial price
- 8.47¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Texas statewide average, July 2026.
- Generation within 50 km
- 876 MW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
7 EIA-reported plants within 50 km.
- Generation queued in county
- 2.32 GW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 1, 2026.Confirmedderived
9 active generation interconnection requests in Dickens County: Solar 1,102 MW, Storage 922 MW, Wind 293 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 345 kV line · American Electric Power | Transmission line | 0.35 km | 345 kV | [1] |
| Dickens · Engie North America | Power plant (Batteries) | 1.4 km | 200 MW | [6] |
| Mcadoo Wind Energy LLC · Invenergy Services LLC | Power plant (Wind) | 9.6 km | 150 MW | [6] |
| Wake Wind Energy Center · Southern Power Co | Power plant (Wind) | 22 km | 257 MW | [6] |
| Whirlwind Energy Center · Whirlwind Energy LLC | Power plant (Wind) | 42.1 km | 57 MW | [6] |
| Old Settler Wind · Old Settler Wind, LLC | Power plant (Wind) | 43.1 km | 151 MW | [6] |
| Cotton Plains Wind Farm · Cotton Plains Wind I, LLC | Power plant (Wind) | 43.1 km | 50 MW | [6] |
| Ralls Wind Farm · Ralls Wind Farm LLC | Power plant (Wind) | 50 km | 10 MW | [6] |
| Unnamed substation | Substation | 0.47 km | 345 kV | [1] |
| Cottonwood Substation · Wind Energy Transmission Texas | Substation | 0.79 km | 345 kV | [1] |
| Burksol, LLC substation · Burksol, LLC | Substation | 0.9 km | 345 kV | [1] |
| Pitchfork Switchyard | Substation | 1.02 km | — | [1] |
| Engie North America substation · Engie North America | Substation | 1.44 km | 345 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| CORUSCANT BESSERCOT 27INR0195 · AEU Battery Project III LLC | Storage | In study · proposed 2027-04 | 418 MW | [4] |
| Spurland Solar IERCOT 29INR0192 · Spurland Solar I | Solar | IA signed · proposed 2028-12 | 302 MW | [4] |
| Outrider BESSERCOT 28INR0288 · Sanders Hollow Energy Center, LLC | Storage | IA signed · proposed 2029-06 | 302 MW | [4] |
| Sanders Hollow Energy CenterERCOT 28INR0169 · Sanders Hollow Energy Center, LLC | Wind | IA signed · proposed 2029-06 | 293 MW | [4] |
| Wolf Spring StorageERCOT 25INR0173 · Wolf Spring Solar, LLC | Storage | IA signed · proposed 2028-08 | 203 MW | [4] |
| Spurland Solar IIERCOT 29INR0195 · Spurland Solar II | Solar | IA signed · proposed 2028-12 | 202 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Site area
- 146 acres[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Area of the mapped OSM site outline.
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)- StatusOperatingSep 27, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→Under constructionOct 12, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Timeline
No dated events sourced yet.
Other buildings on this campus
1- Coreweave HeliosOperating + expanding
All claims (provenance audit)
13| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Argo Data Centerway/1490401523 name=Argo Data Center | [1] | Likely | 2026-10-12 | Shown |
| Status | Under construction | [1] derived | Likely | 2026-10-12 | Shown |
| Utility | South Plains Electric Coop INCterritory 17561: SOUTH PLAINS ELECTRIC COOP INC (COOPERATIVE, SOUTH PLAINS ELECT | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | ERCOTELECTRIC RELIABILITY COUNCIL OF TEXAS, INC. | [3] derived | Likely | — | Shown |
| Balancing authority | ERCO, SWPP | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substation (345 kV)way/1130569621 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.5 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 345 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 2.32 GW | [4] derived | Confirmed | 2026-10-01 | Shown |
| State avg. industrial price | 7.07¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 8.47¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 876 MW | [6] derived | Confirmed | 202502 | Shown |
| Site area | 146 acres | [1] derived | Likely | 2026-10-12 | Shown |