The Toledo Edison CO

What changed

Utility / energy

The Toledo Edison CO is linked to 1 tracked US data center in 1 state as owner, operator, developer, tenant, utility or other party. Facilities with a disclosed figure add up to 0 MW online and 570 MW in the pipeline (floors: 1 of 1 report power). Every relationship cites its source.

This company record was created automatically from a source’s name string and hasn’t been reviewed or de-duplicated yet.

View on map →
Follow

Get changes to The Toledo Edison CO

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “The Toledo Edison CO: US data center footprint.” /companies/the-toledo-edison-co. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_the_toledo_edison_co_2026,
  title = {{The Toledo Edison CO: US data center footprint}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/companies/the-toledo-edison-co}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Linked facilities
1
States
1
Reported power online (floor)
—
Reported planned capacity (floor)
570 MW
EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.100%
This company's facilities:Download CSVJSONAPI docs

Floors, not totals: power sums only facilities with a reported or estimated figure (1 of 1), across all roles (a company can be tenant at one site and owner at another). “—” means not disclosed or not yet collected.

Loading map…

US footprint by state

Relationship graph

Derived from the ownership → operation → tenancy → workload chain at each shared facility, plus company-to-company relationships extracted from cited documents. Speculative links are excluded.

Supplies power to

  • Meta1 site · Likely
    Meta Bowling Green
FacilityRoleLocationStatusPower
Meta Bowling GreenUtility LikelyBowling Green, OHUnder construction570 MW planned EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.