The Toledo Edison CO
What changedUtility / energy
The Toledo Edison CO is linked to 1 tracked US data center in 1 state as owner, operator, developer, tenant, utility or other party. Facilities with a disclosed figure add up to 0 MW online and 570 MW in the pipeline (floors: 1 of 1 report power). Every relationship cites its source.
This company record was created automatically from a source’s name string and hasn’t been reviewed or de-duplicated yet.
Follow
Get changes to The Toledo Edison CO
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “The Toledo Edison CO: US data center footprint.” /companies/the-toledo-edison-co. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_the_toledo_edison_co_2026,
title = {{The Toledo Edison CO: US data center footprint}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/companies/the-toledo-edison-co}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
Floors, not totals: power sums only facilities with a reported or estimated figure (1 of 1), across all roles (a company can be tenant at one site and owner at another). “—” means not disclosed or not yet collected.
US footprint by state
- Ohio1 sites
Relationship graph
Derived from the ownership → operation → tenancy → workload chain at each shared facility, plus company-to-company relationships extracted from cited documents. Speculative links are excluded.
Supplies power to
- Meta1 site · LikelyMeta Bowling Green
| Facility | Role | Location | Status | Power |
|---|---|---|---|---|
| Meta Bowling Green | Utility Likely | Bowling Green, OH | Under construction | 570 MW planned EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |