PowerHouse Data Centers
What changedDeveloper · also matched as PowerHouse
PowerHouse Data Centers is linked to 5 tracked US data centers in 3 states as owner, operator, developer, tenant, utility or other party. None of its linked facilities disclose power yet. Every relationship cites its source.
Follow
Get changes to PowerHouse Data Centers
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “PowerHouse Data Centers: US data center footprint.” /companies/powerhouse. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_powerhouse_2026,
title = {{PowerHouse Data Centers: US data center footprint}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/companies/powerhouse}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
Floors, not totals: power sums only facilities with a reported or estimated figure (3 of 5), across all roles (a company can be tenant at one site and owner at another). “—” means not disclosed or not yet collected.
US footprint by state
- Virginia3 sites
- Pennsylvania1 sites
- Kentucky1 sites
Relationship graph
Derived from the ownership → operation → tenancy → workload chain at each shared facility, plus company-to-company relationships extracted from cited documents. Speculative links are excluded.
Occupies property owned by
- Arep Beaumeade LLC1 site · LikelyCyrusOne NVA14
- Pacific-Ashburn Campus LLC1 site · LikelyPowerHouse Pacific Building 1
Powered by
- Dominion Energy3 sites · LikelyCyrusOne NVA14, PowerHouse CTP-02, PowerHouse Pacific Building 1
| Facility | Role | Location | Status | Power |
|---|---|---|---|---|
| PowerHouse Carlisle | Developer | Carlisle, PA | Unknown | 1.35 GW planned ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. |
| PowerHouse / Poe Louisville | Developer | Louisville, KY | Unknown | 400 MW planned ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. |
| CyrusOne NVA14 | Operator Likely | Ashburn, VA | Operating | 60 MW planned AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. |
| PowerHouse CTP-02 | Operator Likely | VA | Operating | — |
| PowerHouse Pacific Building 1 | Operator Likely | VA | Under construction | — |