Verizon Branchburg NEC Datacenter
Verizon Branchburg NEC Datacenter is an operating enterprise in New Jersey. Operated or owned by Verizon. Power capacity has not been disclosed or collected yet. Verification: unverified. 6 cited sources.
Follow
Get changes to Verizon Branchburg NEC Datacenter
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Verizon Branchburg NEC Datacenter.” /facilities/verizon-branchburg-nec-datacenter-somerset-county-nj. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_verizon_branchburg_nec_datacenter_somers_2026,
title = {{Verizon Branchburg NEC Datacenter}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/verizon-branchburg-nec-datacenter-somerset-county-nj}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityVerizon Branchburg NEC Datacenter
- →substationAzoplate J T Substation (34.5 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.98 km away. Proximity does not establish that it serves the site.
- →transmissionNot identifiedUnknownUnverifiedNo transmission line mapped within 2 km.
- →utilityJersey Central Power & Light[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
| Queue | Relationship | Stage | MW req. | MW appr. | Queued | Expected in service | POI / TO | Source · as of |
|---|---|---|---|---|---|---|---|---|
PJM W2-036 Central SP · Solar | Possibly related generation Speculative Generation request name/developer shares “central” with this facility, in the same county. Not confirmed as serving it. | In service In Service; feasibility: Document Posted; system impact: Document Posted; facilities: Not Required; ISA/GIA: Wholesale Market Participation Agreement | 0.7 ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026. | 0.284 | Jun 18, 2010 | In service Mar 21, 2011 | Polhemus Lane 13kV TO: PSEG | [4] Oct 12, 2026 |
On-site & dedicated generation
- PJM W2-036 Central SP (Solar, 0.7 MW requested)[4]Generation request name/developer shares “central” with this facility, in the same county. Not confirmed as serving it.SolarArrangement unknown1 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Speculative
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for Jersey Central Power & Light. Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 40.59953, -74.70998
- County
- Somerset County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- PJM[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Location falls inside this ISO/RTO footprint.
- Balancing authority
- PJM[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Azoplate J T Substation (34.5 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 1 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- State avg. industrial price
- 15.63¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
New Jersey statewide average, July 2026.
- State avg. commercial price
- 19.17¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
New Jersey statewide average, July 2026.
- Generation within 50 km
- 9.9 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
219 EIA-reported plants within 50 km.
- Generation queued in county
- 8 MW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived
1 active generation interconnection requests in Somerset County: Solar 8 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Woodbridge Energy Center · Woodbridge Energy Center | Power plant (Natural Gas) | 34.4 km | 727 MW | [6] |
| Red Oak Power LLC · Red Oak Operating Services LLC | Power plant (Natural Gas) | 34.8 km | 776 MW | [6] |
| Pseg Sewaren Generating Station · Sewaren Generating Station | Power plant (Natural Gas) | 39.4 km | 538 MW | [6] |
| Talenenergy Martins Creek · TalenEnergy Martins Creek LLC | Power plant (Natural Gas) | 40 km | 1.7 GW | [6] |
| Lower Mount Bethel Energy · Lower Mount Bethel Energy LLC | Power plant (Natural Gas) | 40.4 km | 602 MW | [6] |
| Linden Cogen Plant · EFS Cogen Holdings I LLC | Power plant (Natural Gas) | 41.9 km | 904 MW | [6] |
| Pseg Linden Generating Station · Linden Combined Cycle | Power plant (Natural Gas) | 42.5 km | 1.64 GW | [6] |
| Arthur Kill Generating Station · NRG Arthur Kill Operations Inc | Power plant (Natural Gas) | 43.1 km | 896 MW | [6] |
| Azoplate J T Substation · Jersey Central Power and Light | Substation | 0.98 km | 34.5 kV | [1] |
| North Branch Substation · Jersey Central Power and Light | Substation | 2.11 km | 34.5 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Somerville 26 kVPJM AI1-033 | Solar | In study · proposed 2026-12 | 8 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
- 57,000 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
14| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Verizon Branchburg NEC Datacenterway/756382880 name=Verizon Branchburg NEC Datacenter | [1] | Likely | 2026-10-12 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-10-12 | Shown |
| Facility type | Enterprise | [1] derived | Unverified | 2026-10-12 | Shown |
| Operator | Verizonoperator=Verizon | [1] | Likely | 2026-10-12 | Shown |
| Utility | Jersey Central Power & Lightterritory 9726: JERSEY CENTRAL POWER & LT CO (INVESTOR OWNED, FIRSTENERGY CORP) | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [3] derived | Likely | — | Shown |
| Balancing authority | PJM | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Azoplate J T Substation (34.5 kV)way/675179436 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 1 km | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 8 MW | [4] derived | Confirmed | 2026-10-12 | Shown |
| State avg. industrial price | 15.63¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 19.17¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 9.9 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 57,000 sq ft | [1] derived | Likely | 2026-10-12 | Shown |