Unnamed data center
Unnamed data center is an operating data center in Wyoming. Power capacity has not been disclosed or collected yet. Verification: unverified. 6 cited sources.
Follow
Get changes to Unnamed data center
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Unnamed data center.” /facilities/unnamed-data-center-laramie-county-wy-4. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_unnamed_data_center_laramie_county_wy_4_2026,
title = {{Unnamed data center}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/unnamed-data-center-laramie-county-wy-4}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityUnnamed data center
- →substationMicrosoft/Data Center Substation (115 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.49 km away. Proximity does not establish that it serves the site.
- →transmission230 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.24 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for Black Hills Energy. Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 41.12528, -104.89927
- County
- Laramie County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 3 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Wapa-- Western Area Power Administration, Black Hills Power, INC..
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- None (non-RTO region)[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
- WACM[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Microsoft/Data Center Substation (115 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 0.5 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 230 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 8.62¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Wyoming statewide average, July 2026.
- State avg. commercial price
- 10.26¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Wyoming statewide average, July 2026.
- Generation within 50 km
- 1.46 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
10 EIA-reported plants within 50 km.
- Generation queued in county
- 980 MW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived
3 active generation interconnection requests in Laramie County: Wind 650 MW, Hybrid 330 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 230 kV line | Transmission line | 0.24 km | 230 kV | [1] |
| 115 kV line | Transmission line | 0.26 km | 115 kV | [1] |
| North Range to King Ranch · Cheyenne Light Fuel and Power | Transmission line | 0.69 km | 115 kV | [1] |
| North Range to West Cheyenne · Cheyenne Light Fuel and Power | Transmission line | 0.7 km | 115 kV | [1] |
| Happy Jack to North Range · Cheyenne Light Fuel and Power | Transmission line | 0.7 km | 115 kV | [1] |
| Happy Jack to North Range to West Cheyenne · Cheyenne Light Fuel and Power | Transmission line | 0.76 km | 115 kV | [1] |
| Corriedale Wind Energy · Black Hills Service Company LLC | Power plant (Wind) | 7.2 km | 53 MW | [6] |
| Silver Sage Windpower · Duke Energy Renewables Services | Power plant (Wind) | 10.5 km | 42 MW | [6] |
| Roundhouse Renewable Energy II · Roundhouse Renewable Energy II, LLC | Power plant (Wind) | 11.2 km | 106 MW | [6] |
| South Cheyenne Solar · Southern Power Co | Power plant (Solar) | 15 km | 150 MW | [6] |
| Cheyenne Prairie Generating Station · Black Hills Service Company LLC | Power plant (Natural Gas) | 15 km | 131 MW | [6] |
| Roundhouse Wind Energy Project · Roundhouse Renewable Energy, LLC | Power plant (Wind) | 17.8 km | 226 MW | [6] |
| Bison Solar LLC · Bison Solar LLC | Power plant (Solar) | 30.6 km | 30 MW | [6] |
| Rawhide · Platte River Power Authority | Power plant (Natural Gas) | 31.1 km | 668 MW | [6] |
| Microsoft/Data Center Substation · Cheyenne Light Fuel and Power | Substation | 0.49 km | 115 kV | [1] |
| North Range Substation · Cheyenne Light Fuel and Power | Substation | 0.69 km | 115 kV | [1] |
| King Ranch Substation · Cheyenne Light Fuel and Power | Substation | 1.08 km | 115 kV | [1] |
| Happy Jack Substation · Cheyenne Light Fuel and Power | Substation | 1.11 km | 115 kV | [1] |
| Warren AFB Substation · Western Area Power Administration | Substation | 1.67 km | 115 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| GI-TC-2024-16 at Ault-Laramie River Station 345 LineSPP GI-TC-2024-16 | Wind | IA signed · proposed 2029-06 | 400 MW | [4] |
| GI-CS-2025-04 at Ault LRS 345 LineSPP GI-CS-2025-04 | Hybrid | In study · proposed 2029-11 | 330 MW | [4] |
| GI-TC-2024-15 at Big Bear 345 Switching StationSPP GI-TC-2024-15 | Wind | IA signed · proposed 2029-09 | 250 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
- 62,600 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
12| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Status | Operating | [1] derived | Unverified | 2026-10-12 | Shown |
| Utility | Black Hills Energyterritory 3461: CHEYENNE LIGHT FUEL & POWER (INVESTOR OWNED, BLACK HILLS UTILITY | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | None (non-RTO region) | [3] derived | Likely | — | Shown |
| Balancing authority | WACM | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Microsoft/Data Center Substation (115 kV)way/537172348 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.5 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 980 MW | [4] derived | Confirmed | 2026-10-12 | Shown |
| State avg. industrial price | 8.62¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 10.26¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.46 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 62,600 sq ft | [1] derived | Likely | 2026-10-12 | Shown |