DC
/

TierPoint Baltimore BWI

OperatingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.UnclassifiedBuildingLinthicum Heights, Anne Arundel County, Maryland

TierPoint Baltimore BWI is an operating data center in Linthicum Heights, Maryland. Power capacity has not been disclosed or collected yet. Verification: unverified. 6 cited sources.

20% profile completeness
14 claims from 6 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Oct 12, 2026
Follow

Get changes to TierPoint Baltimore BWI

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “TierPoint Baltimore BWI.” /facilities/tierpoint-baltimore-bwi-linthicum-heights-md. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_tierpoint_baltimore_bwi_linthicum_height_2026,
  title = {{TierPoint Baltimore BWI}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/tierpoint-baltimore-bwi-linthicum-heights-md}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
33,400 sq ft[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Baltimore Gas & Electric CO · PJM
Substation: Unnamed substation (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalOct 12, 2026
    Community map
    • Oct 12, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    TierPoint Baltimore BWI
  2. substation
    Unnamed substation[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.95 km away. Proximity does not establish that it serves the site.
  3. transmission
    Howard to Pumphrey (230 kV)[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.19 km away). Not confirmed as the supply path.
  4. utility
    Baltimore Gas & Electric CO[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    PJM[3]
    Service territoryLikely
    Balancing authority: PJM
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for Baltimore Gas & Electric CO. Know one? Add a source

Location & imagery

Mapped outline
Coordinates
39.21346, -76.68267
Address
813 Pinnacle Drive, Linthicum Heights, MD 21090[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
County
Anne Arundel County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Location falls inside this utility's retail service territory.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
PJM[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
PJM[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Unnamed substation[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
1 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
230 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
16.21¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Maryland statewide average, July 2026.

State avg. commercial price
17.51¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Maryland statewide average, July 2026.

Generation within 50 km
3.03 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

119 EIA-reported plants within 50 km.

Generation queued in county
935 MW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived

6 active generation interconnection requests in Anne Arundel County: Storage 860 MW, Solar 75 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Howard to Pumphrey · Baltimore Gas and ElectricTransmission line0.19 km230 kV[1]
(Viaduct Ave) to Pumphrey · Baltimore Gas and ElectricTransmission line1 km115 kV[1]
Severn - Loudon Park · AmtrakTransmission line1.02 km138 kV[1]
Wheelabrator Baltimore Refuse · Wheelabrator Environmental SystemsPower plant (Biomass)7.4 km61 MW[6]
Brandon Shores · Brandon Shores LLCPower plant (Coal)13 km1.27 GW[6]
Herbert A Wagner · H.A. Wagner LLCPower plant (Petroleum)14 km841 MW[6]
Philadelphia · Constellation Power Source Generation, LLCPower plant (Petroleum)14 km60 MW[6]
Central Utility Plant At White Oak · GSA Metropolitan Service CenterPower plant (Natural Gas)32.3 km54 MW[6]
Nih Cogeneration Facility · National Institutes of HealthPower plant (Natural Gas)42.7 km28 MW[6]
Perryman · Constellation Power Source Generation, LLCPower plant (Natural Gas)47.1 km404 MW[6]
Fairview Farms · Madison Energy Investments LLCPower plant (Solar)48.7 km30 MW[6]
Unnamed substationSubstation0.95 km—[1]
Unnamed substationSubstation1.63 km—[1]
Unnamed substationSubstation1.95 km—[1]
Unnamed substationSubstation2.14 km—[1]
Unnamed substationSubstation2.28 km—[1]
Shipley Substation · Baltimore Gas and ElectricSubstation2.9 km115 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
Chapel Energy Storage FacilityPJM AG1-104StorageIn study · proposed 2024-06300 MW[4]
Brandon Shores 230 kVPJM AG2-207StorageIn study · proposed 2023-03275 MW[4]
Brandon Shores 230 kVPJM AG2-319StorageIn study · proposed 2025-12150 MW[4]
Wagner 115 kVPJM AG2-225StorageIn study · proposed 2022-12135 MW[4]
Waugh Chapel 115 kVPJM AG2-617SolarIn study · proposed 2023-1255 MW[4]
Columbia-Geisinger Tap #1 69 kVPJM AF2-434SolarIn study · proposed 2022-0620 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
33,400 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

14
FieldValueSourceConfidenceAs ofStatus
NameTierPoint Baltimore BWIway/610845529 name=TierPoint Baltimore BWI[1] Likely2026-10-12Shown
StatusOperating[1] derivedUnverified2026-10-12Shown
Address813 Pinnacle Drive, Linthicum Heights, MD 21090[1] Likely2026-10-12Shown
UtilityBaltimore Gas & Electric COterritory 1167: BALTIMORE GAS & ELECTRIC CO (INVESTOR OWNED, EXELON CORP)[2] derivedLikely2022Shown
ISO / RTOPJMPJM INTERCONNECTION, LLC[3] derivedLikely—Shown
Balancing authorityPJM[2] derivedLikely—Shown
Nearest mapped substationUnnamed substationway/113887563[1] derivedLikely2026-09-28Shown
Distance to substation1 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby230 kV[1] derivedLikely2026-09-28Shown
Generation queued in county935 MW[4] derivedConfirmed2026-10-12Shown
State avg. industrial price16.21¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price17.51¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km3.03 GW[6] derivedConfirmed202502Shown
Building footprint33,400 sq ft[1] derivedLikely2026-10-12Shown