DC
/

The Putney School data center

OperatingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.UnclassifiedBuildingWindham County, Vermont

The Putney School data center is an operating data center in Vermont. Operated or owned by The Putney School. Power capacity has not been disclosed or collected yet. Verification: unverified. 5 cited sources.

20% profile completeness
9 claims from 5 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Oct 12, 2026
Follow

Get changes to The Putney School data center

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “The Putney School data center.” /facilities/the-putney-school-data-center-windham-county-vt. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_the_putney_school_data_center_windham_co_2026,
  title = {{The Putney School data center}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/the-putney-school-data-center-windham-county-vt}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
100 sq ft[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Green Mountain Power Corp · ISO-NE
Substation: Not identified

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalOct 12, 2026
    Community map
    • Oct 12, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    The Putney School data center
  2. substation
    Not identified
    UnknownUnverified
    No substation mapped within 3 km and none named in filings.
  3. transmission
    Not identified
    UnknownUnverified
    No transmission line mapped within 2 km.
  4. utility
    Green Mountain Power Corp[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    ISO-NE[3]
    Service territoryLikely
    Balancing authority: ISNE
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for Green Mountain Power Corp. Know one? Add a source

Location & imagery

Mapped outline
Coordinates
42.98763, -72.55176
County
Windham County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Location falls inside this utility's retail service territory.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
ISO-NE[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
ISNE[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

State avg. industrial price
13.07¢/kWh[4]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Vermont statewide average, July 2026.

State avg. commercial price
20.71¢/kWh[4]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Vermont statewide average, July 2026.

Generation within 50 km
2.3 GW[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

46 EIA-reported plants within 50 km.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Bellows Falls · Great River Hydro, LLCPower plant (Hydroelectric)18.7 km47 MW[5]
Vernon Dam · Great River Hydro, LLCPower plant (Hydroelectric)24.2 km34 MW[5]
Harriman · Great River Hydro, LLCPower plant (Hydroelectric)36.6 km41 MW[5]
Deerfield Wind LLC · Avangrid Power LLCPower plant (Wind)38 km30 MW[5]
Northfield Mountain · FirstLight Power Resources, Inc. - MAPower plant (Pumped Storage)42.4 km1.17 GW[5]
Cabot · FirstLight Power Resources, Inc. - MAPower plant (Hydroelectric)44.5 km62 MW[5]
Antrim Wind · Antrim Wind Energy LLCPower plant (Wind)45.1 km29 MW[5]
Bear Swamp · Bear Swamp Power Company LLCPower plant (Pumped Storage)47.4 km666 MW[5]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
100 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

9
FieldValueSourceConfidenceAs ofStatus
StatusOperating[1] derivedUnverified2026-10-12Shown
OperatorThe Putney Schooloperator=The Putney School[1] Likely2026-10-12Shown
UtilityGreen Mountain Power Corpterritory 7601: GREEN MOUNTAIN POWER CORP (INVESTOR OWNED, GREEN MOUNTAIN POWER [2] derivedLikely2022Shown
ISO / RTOISO-NEISO NEW ENGLAND INC.[3] derivedLikely—Shown
Balancing authorityISNE[2] derivedLikely—Shown
State avg. industrial price13.07¢/kWh[4] Confirmed2026-07Shown
State avg. commercial price20.71¢/kWh[4] Confirmed2026-07Shown
Generation within 50 km2.3 GW[5] derivedConfirmed202502Shown
Building footprint100 sq ft[1] derivedLikely2026-10-12Shown