T5@Cleveland
T5@Cleveland is an operating colocation in Ohio. Operated or owned by T5 Data Centers. Power capacity has not been disclosed or collected yet. Verification: unverified. 5 cited sources.
Part of T5 Data Centers — Cuyahoga County, OH campus
Follow
Get changes to T5@Cleveland
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “T5@Cleveland.” /facilities/t5-cleveland-cuyahoga-county-oh. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_t5_cleveland_cuyahoga_county_oh_2026,
title = {{T5@Cleveland}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/t5-cleveland-cuyahoga-county-oh}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityT5@Cleveland
- →substationUnnamed substation[1]Proximity onlyUnverifiedNearest mapped substation, 1.14 km away. Proximity does not establish that it serves the site.
- →transmissionNot identifiedUnknownUnverifiedNo transmission line mapped within 2 km.
- →utilityCleveland Electric Illum CO[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for Cleveland Electric Illum CO. Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 41.44222, -81.80327
- County
- Cuyahoga County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
- Utility
Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: City of Cleveland - (Oh).
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- PJM[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Location falls inside this ISO/RTO footprint.
- Balancing authority
- PJM[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Unnamed substation[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 1.1 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- State avg. industrial price
- 10.95¢/kWh[4]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Ohio statewide average, July 2026.
- State avg. commercial price
- 14.06¢/kWh[4]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Ohio statewide average, July 2026.
- Generation within 50 km
- 746 MW[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
22 EIA-reported plants within 50 km.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| West 41st Street · City of Cleveland - (OH) | Power plant (Natural Gas) | 8.2 km | 32 MW | [5] |
| Cleveland Works · Cleveland Cliffs | Power plant (Other) | 11.4 km | 99 MW | [5] |
| Collinwood · City of Cleveland - (OH) | Power plant (Petroleum) | 22 km | 16 MW | [5] |
| Cleveland Peaking · American Mun Power-Ohio, Inc | Power plant (Petroleum) | 22 km | 11 MW | [5] |
| West Lorain · Vermillion Power LLC | Power plant (Natural Gas) | 38.5 km | 501 MW | [5] |
| Oberlin (Oh) · City of Oberlin - (OH) | Power plant (Natural Gas) | 39 km | 18 MW | [5] |
| Wadsworth Ips Rto Btm · American Mun Power-Ohio, Inc | Power plant (Petroleum) | 40.1 km | 11 MW | [5] |
| Cuyahoga Falls 1 · City of Cuyahoga Falls - (OH) | Power plant (Petroleum) | 43.2 km | 14 MW | [5] |
| Unnamed substation | Substation | 1.14 km | — | [1] |
| Unnamed substation | Substation | 1.3 km | — | [1] |
| Unnamed substation | Substation | 1.31 km | — | [1] |
| Unnamed substation | Substation | 1.37 km | — | [1] |
| Unnamed substation | Substation | 2.23 km | — | [1] |
| Unnamed substation | Substation | 2.91 km | — | [1] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Site area
- 22.4 acres[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Area of the mapped OSM site outline.
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
Other buildings on this campus
1- T5@ClevelandOperating · 244,900 sq ft footprint
All claims (provenance audit)
14| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | T5@Clevelandway/1292169104 name=T5@Cleveland | [1] | Likely | 2026-10-12 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-10-12 | Shown |
| Facility type | Colocation | [1] derived | Unverified | 2026-10-12 | Shown |
| Website | https://t5datacenters.com/wp-content/uploads/2020/08/T5-Cleveland-Onesheet-2020.pdf | [1] | Likely | 2026-10-12 | Shown |
| Operator | T5 Data Centersoperator=T5 Data Centers | [1] | Likely | 2026-10-12 | Shown |
| Utility | Cleveland Electric Illum COterritory 3755: CLEVELAND ELECTRIC ILLUM CO (INVESTOR OWNED, FIRSTENERGY CORP) | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [3] derived | Likely | — | Shown |
| Balancing authority | PJM | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substationway/170771911 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 1.1 km | [1] derived | Likely | 2026-09-28 | Shown |
| State avg. industrial price | 10.95¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 14.06¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 746 MW | [5] derived | Confirmed | 202502 | Shown |
| Site area | 22.4 acres | [1] derived | Likely | 2026-10-12 | Shown |