DC
/

Serverfarm - LAX1

OperatingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.ColocationBuildingEl Segundo, Los Angeles County, California

Serverfarm - LAX1 is an operating colocation in El Segundo, California. Operated or owned by Serverfarm. Planned capacity: 17 MW (announced). Verification: announced only. 7 cited sources.

50% profile completeness
19 claims from 7 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Oct 12, 2026
Follow

Get changes to Serverfarm - LAX1

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Serverfarm - LAX1.” /facilities/serverfarm-lax1-el-segundo-ca. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_serverfarm_lax1_el_segundo_ca_2026,
  title = {{Serverfarm - LAX1}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/serverfarm-lax1-el-segundo-ca}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
17 MW[3]
AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Sep 30, 2026.Likely
Building footprint
119,400 sq ft[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
1973[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Energized — operating
Medium confidence
Project verification
Announced only
Only announcements or press coverage found.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Southern California Edison · CAISO
Substation: Unnamed substation (66 kV) (nearest, unverified)

Power reality

Announced
17 MW[3]AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Sep 30, 2026.
Reported by serverfarmllc.com
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. AnnouncedSep 30, 2026
    Company announcement
    • Sep 30, 2026 · Planned capacity reported: 17.3 MW[3]
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalOct 12, 2026
    Community map
    • Oct 12, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Company announcement, Community map.

Grid path

  1. facility
    Serverfarm - LAX1
  2. substation
    Unnamed substation (66 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.1 km away. Proximity does not establish that it serves the site.
  3. transmission
    220 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (1.7 km away). Not confirmed as the supply path.
  4. utility
    Southern California Edison[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    CAISO[4]
    Service territoryLikely
    Balancing authority: CISO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for Southern California Edison. Know one? Add a source

Location & imagery

Mapped outline
Coordinates
33.92164, -118.38661
Address
444 North Nash Street, El Segundo, CA 90245[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
County
Los Angeles County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Operator
Utility

Location falls inside this utility's retail service territory.

No tenants or end users identified in our sources yet.

Power (all fields)

Planned capacity
17 MW[3]AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Sep 30, 2026.Likely

“IT 17.3MW .” — Capacity stated on the operator's facility page (facility capacity). Recorded as design capacity, not as power currently in use.

Current facility power
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
CAISO[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
CISO[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Unnamed substation (66 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.1 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
220 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
25.11¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

California statewide average, July 2026.

State avg. commercial price
30.56¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

California statewide average, July 2026.

Generation within 50 km
10.63 GW[7]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

157 EIA-reported plants within 50 km.

Generation queued in county
6.89 GW[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived

20 active generation interconnection requests in Los Angeles County: Storage 4,550 MW, Solar + storage 2,336 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
66 kV lineTransmission line0.1 km66 kV[1]
220 kV line · Southern California EdisonTransmission line1.7 km220 kV[1]
Scattergood · Los Angeles Department of Water & PowerPower plant (Natural Gas)3.8 km778 MW[7]
El Segundo Energy Center LLC · NRG Energy Services LLCPower plant (Natural Gas)3.8 km510 MW[7]
Aes Alamitos LLC · AES Alamitos LLCPower plant (Natural Gas)31.4 km1.14 GW[7]
Aes Alamitos Energy Center · AES Alamitos Energy, LLCPower plant (Natural Gas)31.5 km603 MW[7]
Haynes · Los Angeles Department of Water & PowerPower plant (Natural Gas)31.8 km1.6 GW[7]
Valley (Ca) · Los Angeles Department of Water & PowerPower plant (Natural Gas)36 km563 MW[7]
Walnut Creek Energy Park · Walnut Creek LLCPower plant (Natural Gas)41.9 km501 MW[7]
Aes Huntington Beach Energy Project · AES Huntington Beach Energy, LLCPower plant (Natural Gas)48.6 km630 MW[7]
Unnamed substationSubstation0.1 km66 kV[1]
Unnamed substationSubstation0.18 km66 kV[1]
Unnamed substationSubstation0.36 km66 kV[1]
Unnamed substationSubstation0.84 km66 kV[1]
Sepulveda Substation · Southern California EdisonSubstation0.99 km66 kV[1]
Unnamed substationSubstation1.2 km66 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
ANGELENO SOLAR FARMCAISO 1625Solar + storageIA signed · proposed 2028-121.15 GW[5]
ANTELOPE SOLAR 2CAISO 1208Solar + storageIA signed · proposed 2025-11650 MW[5]
FLEETWOODCAISO 2111StorageIn study · proposed 2032-04400 MW[5]
GABRIEL STORAGECAISO 2113StorageIA signed · proposed 2033-05400 MW[5]
SIMONCAISO 2115StorageIn study · proposed 2032-04400 MW[5]
MARICICAISO 2116StorageIA signed · proposed 2031-02400 MW[5]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    1973[1]
  6. Expected completion
    —
Planned capacity
17 MW[3]AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Sep 30, 2026.Likely

“IT 17.3MW .” — Capacity stated on the operator's facility page (facility capacity). Recorded as design capacity, not as power currently in use.

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
119,400 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

First operational: 1973[1]

    All claims (provenance audit)

    19
    FieldValueSourceConfidenceAs ofStatus
    NameServerfarm - LAX1way/424945845 name=Serverfarm - LAX1[1] Likely2026-10-12Shown
    StatusOperating[1] derivedUnverified2026-10-12Shown
    Facility typeColocation[1] derivedUnverified2026-10-12Shown
    Websitehttps://www.serverfarmllc.com/los-angeles-data-center/[1] Likely2026-10-12Shown
    Address444 North Nash Street, El Segundo, CA 90245[1] Likely2026-10-12Shown
    OperatorServerfarmoperator=Serverfarm LLC.[1] Likely2026-10-12Shown
    UtilitySouthern California Edisonterritory 17609: SOUTHERN CALIFORNIA EDISON CO (INVESTOR OWNED, SOUTHERN CALIFOR[2] derivedLikely2022Shown
    Planned capacity17 MW[3] Likely2026-09-30Shown
    ISO / RTOCAISOCALIFORNIA INDEPENDENT SYSTEM OPERATOR[4] derivedLikely—Shown
    Balancing authorityCISO[2] derivedLikely—Shown
    Nearest mapped substationUnnamed substation (66 kV)way/734110282[1] derivedLikely2026-09-28Shown
    Distance to substation0.1 km[1] derivedLikely2026-09-28Shown
    Highest-voltage line nearby220 kV[1] derivedLikely2026-09-28Shown
    Generation queued in county6.89 GW[5] derivedConfirmed2026-10-12Shown
    State avg. industrial price25.11¢/kWh[6] Confirmed2026-07Shown
    State avg. commercial price30.56¢/kWh[6] Confirmed2026-07Shown
    Generation within 50 km10.63 GW[7] derivedConfirmed202502Shown
    Building footprint119,400 sq ft[1] derivedLikely2026-10-12Shown
    First operational1973start_date=1973[1] Likely2026-10-12Shown