DC
/

QTS Suwanee Data Center 1

OperatingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.ColocationBuildingGwinnett County, Georgia

QTS Suwanee Data Center 1 is an operating colocation in Georgia. Operated or owned by QTS Data Centers. Power capacity has not been disclosed or collected yet. Verification: unverified. 5 cited sources.

Part of QTS Data Centers — Gwinnett County, GA campus

30% profile completeness
15 claims from 6 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Oct 12, 2026
Follow

Get changes to QTS Suwanee Data Center 1

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “QTS Suwanee Data Center 1.” /facilities/qts-suwanee-data-center-1-gwinnett-county-ga. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_qts_suwanee_data_center_1_gwinnett_count_2026,
  title = {{QTS Suwanee Data Center 1}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/qts-suwanee-data-center-1-gwinnett-county-ga}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
311,300 sq ft[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Georgia Power · None (non-RTO region)
Substation: Avonlea Substation (230 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalOct 12, 2026
    Community map
    • Oct 12, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    QTS Suwanee Data Center 1
  2. substation
    Avonlea Substation (230 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 1.21 km away. Proximity does not establish that it serves the site.
  3. transmission
    230 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (1.2 km away). Not confirmed as the supply path.
  4. utility
    Georgia Power[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    None (non-RTO region)[3]
    Service territoryLikely
    Balancing authority: SOCO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates1

  • Rules for serving large-load customers through customized contracts[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jan 2025.Jan 2025
    Georgia Power · Georgia Public Service Commission · Approved

    “In January, the Georgia PSC approved new rules and regulations that enable Georgia Power to serve large-load customers through customized contracts — including terms such as upfront infrastructure payments, long-term commitments, and financial guarantees”

Location & imagery

Mapped outline
Coordinates
34.03543, -84.06121
Address
300 Satellite Boulevard Northwest[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
County
Gwinnett County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Operator
Utility

Location falls inside this utility's retail service territory.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
None (non-RTO region)[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Outside all ISO/RTO footprints; balancing authority shown separately.

Balancing authority
SOCO[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Avonlea Substation (230 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
1.2 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
230 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
10.03¢/kWh[4]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Georgia statewide average, July 2026.

State avg. commercial price
12.54¢/kWh[4]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Georgia statewide average, July 2026.

Generation within 50 km
3.82 GW[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

30 EIA-reported plants within 50 km.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
230 kV lineTransmission line1.2 km230 kV[1]
115 kV lineTransmission line1.42 km115 kV[1]
Georgia Lfg Richland Creek Plant · Cube District Energy, LLCPower plant (Biomass)10.5 km11 MW[5]
Buford · USCE-Mobile DistrictPower plant (Hydroelectric)14.2 km127 MW[5]
State Farm Support Center East · State Farm Mutual Auto Ins CoPower plant (Petroleum)17.8 km11 MW[5]
Doyle Energy Facility · Oglethorpe Power CorporationPower plant (Natural Gas)40 km311 MW[5]
Walton County Power, LLC · Oglethorpe Power CorporationPower plant (Natural Gas)41.7 km455 MW[5]
Mpc Generating · MPC Generating, LLCPower plant (Natural Gas)41.9 km303 MW[5]
Cnn Center · RREF IV-P CP III Marietta Street LLCPower plant (Petroleum)43.5 km13 MW[5]
Jack Mcdonough · Georgia Power CoPower plant (Natural Gas)44.9 km2.54 GW[5]
Avonlea Substation · Georgia PowerSubstation1.21 km230 kV[1]
Exit 44 Substation · Georgia PowerSubstation1.89 km115 kV[1]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
311,300 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

Other buildings on this campus

2

All claims (provenance audit)

15
FieldValueSourceConfidenceAs ofStatus
NameQTS Suwanee Data Center 1way/387378765 name=QTS Suwanee Data Center 1[1] Likely2026-10-12Shown
StatusOperating[1] derivedUnverified2026-10-12Shown
Facility typeColocation[1] derivedUnverified2026-10-12Shown
Address300 Satellite Boulevard Northwest[1] Likely2026-10-12Shown
OperatorQTS Data Centersoperator=Quality Technology Services[1] Likely2026-10-12Shown
UtilityGeorgia Powerterritory 7140: GEORGIA POWER CO (INVESTOR OWNED, SOUTHERN COMPANY)[2] derivedLikely2022Shown
ISO / RTONone (non-RTO region)[3] derivedLikely—Shown
Balancing authoritySOCO[2] derivedLikely—Shown
Nearest mapped substationAvonlea Substation (230 kV)way/461017241[1] derivedLikely2026-09-28Shown
Distance to substation1.2 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby230 kV[1] derivedLikely2026-09-28Shown
State avg. industrial price10.03¢/kWh[4] Confirmed2026-07Shown
State avg. commercial price12.54¢/kWh[4] Confirmed2026-07Shown
Generation within 50 km3.82 GW[5] derivedConfirmed202502Shown
Building footprint311,300 sq ft[1] derivedLikely2026-10-12Shown