DC
/

QTS Sacramento

OperatingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.ColocationBuildingSacramento, Sacramento County, California

QTS Sacramento is an operating colocation in Sacramento, California. Operated or owned by QTS Data Centers. Planned capacity: 4 MW (announced). Verification: announced only. 7 cited sources.

40% profile completeness
18 claims from 7 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Oct 12, 2026
Follow

Get changes to QTS Sacramento

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “QTS Sacramento.” /facilities/qts-sacramento-sacramento-ca. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_qts_sacramento_sacramento_ca_2026,
  title = {{QTS Sacramento}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/qts-sacramento-sacramento-ca}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
4 MW[3]
AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Sep 30, 2026.Likely
Building footprint
90,300 sq ft[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Energized — operating
Medium confidence
Project verification
Announced only
Only announcements or press coverage found.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Sacramento Municipal Util Dist · None (non-RTO region)
Substation: Sacramento Municipal Utility District substation (69 kV) (nearest, unverified)

Power reality

Announced
4 MW[3]AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Sep 30, 2026.
Reported by qtsdatacenters.com
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. AnnouncedSep 30, 2026
    Company announcement
    • Sep 30, 2026 · Planned capacity reported: 4 MW[3]
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalOct 12, 2026
    Community map
    • Oct 12, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Company announcement, Community map.

Grid path

  1. facility
    QTS Sacramento
  2. substation
    Sacramento Municipal Utility District substation (69 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.1 km away. Proximity does not establish that it serves the site.
  3. transmission
    Natomas-Hurley/Elverta-Station E (230 kV)[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.1 km away). Not confirmed as the supply path.
  4. utility
    Sacramento Municipal Util Dist[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    None (non-RTO region)[4]
    Service territoryLikely
    Balancing authority: BANC
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for Sacramento Municipal Util Dist. Know one? Add a source

Location & imagery

Mapped outline
Coordinates
38.64646, -121.48627
Address
1100 North Market Boulevard, Sacramento, CA 95834[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
County
Sacramento County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Operator
Utility

Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Wapa-- Western Area Power Administration.

No tenants or end users identified in our sources yet.

Power (all fields)

Planned capacity
4 MW[3]AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Sep 30, 2026.Likely

“4MW+ critical power capacity .” — Capacity stated on the operator's facility page (critical IT load). Recorded as design capacity, not as power currently in use.

Current facility power
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
None (non-RTO region)[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Outside all ISO/RTO footprints; balancing authority shown separately.

Balancing authority
BANC[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Sacramento Municipal Utility District substation (69 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.1 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
230 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
25.11¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

California statewide average, July 2026.

State avg. commercial price
30.56¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

California statewide average, July 2026.

Generation within 50 km
2.72 GW[7]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

95 EIA-reported plants within 50 km.

Generation queued in county
50 MW[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived

1 active generation interconnection requests in Sacramento County: Storage 50 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Natomas-Hurley/Elverta-Station E · Sacramento Municipal Utility DistrictTransmission line0.1 km230 kV[1]
Elverta-Hurley · Western Area Power AdministrationTransmission line0.13 km230 kV[1]
Natomas-Hurley · Sacramento Municipal Utility DistrictTransmission line0.31 km230 kV[1]
230 kV line · Sacramento Municipal Utility DistrictTransmission line0.39 km230 kV[1]
O'Banion-Natomas · Sacramento Municipal Utility DistrictTransmission line0.48 km230 kV[1]
O'Banion-Natomas/Elverta-Station E · Sacramento Municipal Utility DistrictTransmission line0.56 km230 kV[1]
Sca Cogen 2 · Sacramento Municipal Util DistPower plant (Natural Gas)14.9 km177 MW[7]
Spa Cogen 3 · Sacramento Municipal Util DistPower plant (Natural Gas)15.1 km178 MW[7]
Roseville Energy Park · City of Roseville - (CA)Power plant (Natural Gas)18.7 km212 MW[7]
Carson Ice-Gen Project · Sacramento Municipal Util DistPower plant (Natural Gas)22.4 km109 MW[7]
Folsom · U S Bureau of ReclamationPower plant (Hydroelectric)29.2 km215 MW[7]
Rancho Seco Solar II, LLC · Rancho Seco Solar II, LLCPower plant (Solar)46.1 km160 MW[7]
Cosumnes · Sacramento Municipal Util DistPower plant (Natural Gas)46.6 km545 MW[7]
Sutter Energy Center · Calpine Corp-SutterPower plant (Natural Gas)48.7 km528 MW[7]
Sacramento Municipal Utility District substation · Sacramento Municipal Utility DistrictSubstation0.1 km69 kV[1]
Natomas Substation · Sacramento Municipal Utility DistrictSubstation0.43 km230 kV[1]
Unnamed substationSubstation0.52 km—[1]
Unnamed substationSubstation0.55 km—[1]
Sacramento Municipal Utility District substation · Sacramento Municipal Utility DistrictSubstation1.03 km69 kV[1]
Sacramento Municipal Utility District substation · Sacramento Municipal Utility DistrictSubstation1.17 km69 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
PROSPECT ENERGY STORAGECAISO 1507StorageSuspended · proposed 2028-0650 MW[5]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —
Planned capacity
4 MW[3]AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Sep 30, 2026.Likely

“4MW+ critical power capacity .” — Capacity stated on the operator's facility page (critical IT load). Recorded as design capacity, not as power currently in use.

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
90,300 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

18
FieldValueSourceConfidenceAs ofStatus
NameQTS Sacramentoway/194049551 name=QTS Sacramento[1] Likely2026-10-12Shown
StatusOperating[1] derivedUnverified2026-10-12Shown
Facility typeColocation[1] derivedUnverified2026-10-12Shown
Websitehttps://www.qtsdatacenters.com/data-centers/sacramento[1] Likely2026-10-12Shown
Address1100 North Market Boulevard, Sacramento, CA 95834[1] Likely2026-10-12Shown
OperatorQTS Data Centersoperator=Quality Technology Services[1] Likely2026-10-12Shown
UtilitySacramento Municipal Util Distterritory 16534: SACRAMENTO MUNICIPAL UTIL DIST (POLITICAL SUBDIVISION, SACRAMEN[2] derivedUnverified2022Shown
Planned capacity4 MW[3] Likely2026-09-30Shown
ISO / RTONone (non-RTO region)[4] derivedLikely—Shown
Balancing authorityBANC[2] derivedLikely—Shown
Nearest mapped substationSacramento Municipal Utility District substation (69 kV)way/1292445307[1] derivedLikely2026-09-28Shown
Distance to substation0.1 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby230 kV[1] derivedLikely2026-09-28Shown
Generation queued in county50 MW[5] derivedConfirmed2026-10-12Shown
State avg. industrial price25.11¢/kWh[6] Confirmed2026-07Shown
State avg. commercial price30.56¢/kWh[6] Confirmed2026-07Shown
Generation within 50 km2.72 GW[7] derivedConfirmed202502Shown
Building footprint90,300 sq ft[1] derivedLikely2026-10-12Shown