QES Computers
QES Computers is an operating data center in California. Power capacity has not been disclosed or collected yet. Verification: unverified. 6 cited sources.
Follow
Get changes to QES Computers
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “QES Computers.” /facilities/qes-computers-alameda-county-ca. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_qes_computers_alameda_county_ca_2026,
title = {{QES Computers}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/qes-computers-alameda-county-ca}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityQES Computers
- →substationUnnamed substation[1]Proximity onlyUnverifiedNearest mapped substation, 0.58 km away. Proximity does not establish that it serves the site.
- →transmissionNot identifiedUnknownUnverifiedNo transmission line mapped within 2 km.
- →utilityPacific Gas and Electric[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for Pacific Gas and Electric. Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 37.69948, -121.90380
- County
- Alameda County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Wapa-- Western Area Power Administration.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- CAISO[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Location falls inside this ISO/RTO footprint.
- Balancing authority
- CISO[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Unnamed substation[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 0.6 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- State avg. industrial price
- 25.11¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
California statewide average, July 2026.
- State avg. commercial price
- 30.56¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
California statewide average, July 2026.
- Generation within 50 km
- 6.93 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
126 EIA-reported plants within 50 km.
- Generation queued in county
- 1.34 GW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived
9 active generation interconnection requests in Alameda County: Storage 1,071 MW, Wind 166 MW, Solar + storage 100 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Russell City Energy Center · Russell City Energy Company LLC | Power plant (Natural Gas) | 21.5 km | 605 MW | [6] |
| Los Esteros Critical Energy Center · Los Esteros Critical Energy Facility LLC | Power plant (Natural Gas) | 30.6 km | 300 MW | [6] |
| Delta Energy Center · Delta Energy Center LLC | Power plant (Natural Gas) | 35.7 km | 842 MW | [6] |
| Tracy Combined Cycle Power Plant · MRP San Joaquin Energy LLC. | Power plant (Natural Gas) | 36.4 km | 320 MW | [6] |
| Los Medanos Energy Center · Los Medanos Energy Center LLC | Power plant (Natural Gas) | 36.9 km | 559 MW | [6] |
| Marsh Landing Generating Station · Marsh Landing LLC | Power plant (Natural Gas) | 37.3 km | 765 MW | [6] |
| Gateway Generating Station · Pacific Gas & Electric Co. | Power plant (Natural Gas) | 37.6 km | 563 MW | [6] |
| Solano Wind · Sacramento Municipal Util Dist | Power plant (Wind) | 47.8 km | 301 MW | [6] |
| Unnamed substation | Substation | 0.58 km | — | [1] |
| Unnamed substation | Substation | 1.92 km | — | [1] |
| Unnamed substation | Substation | 2.08 km | — | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| SPECTRUM ENERGY STORAGECAISO 1881 | Storage | IA signed · proposed 2032-02 | 500 MW | [4] |
| ESPRESSOCAISO 1912 | Storage | IA signed · proposed 2031-08 | 300 MW | [4] |
| ZORIN STORAGECAISO 1911 | Storage | IA signed · proposed 2034-02 | 180 MW | [4] |
| ARAMIS POWER PLANTCAISO 1349 | Solar + storage | IA signed · proposed 2026-07 | 100 MW | [4] |
| RECLAIMED WINDCAISO 1461 | Storage | IA signed · proposed 2026-12 | 91 MW | [4] |
| SAND HILL CCAISO 1363 | Wind | IA signed · proposed 2027-04 | 81 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
- 900 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
12| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | QES Computersway/358946546 name=QES Computers | [1] | Likely | 2026-10-12 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-10-12 | Shown |
| Utility | Pacific Gas and Electricterritory 14328: PACIFIC GAS & ELECTRIC CO. (INVESTOR OWNED, PACIFIC GAS & ELECT | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | CAISOCALIFORNIA INDEPENDENT SYSTEM OPERATOR | [3] derived | Likely | — | Shown |
| Balancing authority | CISO | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substationway/66413929 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.6 km | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 1.34 GW | [4] derived | Confirmed | 2026-10-12 | Shown |
| State avg. industrial price | 25.11¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 30.56¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 6.93 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 900 sq ft | [1] derived | Likely | 2026-10-12 | Shown |