NTT Chicago CH2
NTT Chicago CH2 is an operating colocation in Itasca, Illinois. Operated or owned by NTT Global Data Centers. Power capacity has not been disclosed or collected yet. Verification: unverified. 5 cited sources.
Part of NTT Global Data Centers — Itasca, IL campus
Follow
Get changes to NTT Chicago CH2
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “NTT Chicago CH2.” /facilities/ntt-chicago-ch2-itasca-il. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_ntt_chicago_ch2_itasca_il_2026,
title = {{NTT Chicago CH2}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/ntt-chicago-ch2-itasca-il}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityNTT Chicago CH2
- →substationCommonwealth Edison substation[1]Proximity onlyUnverifiedNearest mapped substation, 0.17 km away. Proximity does not establish that it serves the site.
- →transmissionDes Plaines - Itasca 345 kV[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (1.1 km away). Not confirmed as the supply path.
- →utilityCommonwealth Edison (ComEd)[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for Commonwealth Edison (ComEd). Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 41.98883, -88.00725
- Address
- 275 East Pierce Road, Itasca, IL 60143[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
- County
- DuPage County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- PJM[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Location falls inside this ISO/RTO footprint.
- Balancing authority
- PJM[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Commonwealth Edison substation[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 0.2 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 345 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 11.87¢/kWh[4]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Illinois statewide average, July 2026.
- State avg. commercial price
- 15.19¢/kWh[4]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Illinois statewide average, July 2026.
- Generation within 50 km
- 2.46 GW[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
52 EIA-reported plants within 50 km.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Des Plaines - Itasca 345 kV · Commonwealth Edison | Transmission line | 1.1 km | 345 kV | [1] |
| Des Plaines - Lombard 345 kV & Tonne - Itasca 138 kV · Commonwealth Edison | Transmission line | 1.12 km | 345 kV | [1] |
| 345 kV line · Commonwealth Edison | Transmission line | 1.12 km | 345 kV | [1] |
| 138 kV line | Transmission line | 1.28 km | 138 kV | [1] |
| Itasca - Lombard 345 kV · Commonwealth Edison | Transmission line | 1.33 km | 345 kV | [1] |
| Des Plaines - Lombard 345 kV & Itasca - Lombard 138 kV · Commonwealth Edison | Transmission line | 1.79 km | 345 kV | [1] |
| Mrp Elgin LLC · Lincoln Operating Services, LLC | Power plant (Natural Gas) | 19.7 km | 489 MW | [5] |
| Mrp Rocky Road LLC · Lincoln Operating Services, LLC | Power plant (Natural Gas) | 22.4 km | 336 MW | [5] |
| Aurora · Aurora Generation LLC | Power plant (Natural Gas) | 26.5 km | 991 MW | [5] |
| Winnetka · Village of Winnetka - (IL) | Power plant (Natural Gas) | 26.8 km | 33 MW | [5] |
| Ingredion Incorporated · Ingredion Inc - Illinois | Power plant (Natural Gas) | 28 km | 51 MW | [5] |
| University of Illinois Cogen Facility · University of Illinois | Power plant (Natural Gas) | 32.3 km | 56 MW | [5] |
| Fisk Street · Midwest Generations EME LLC | Power plant (Petroleum) | 33.1 km | 197 MW | [5] |
| Waukegan · Midwest Generations EME LLC | Power plant (Petroleum) | 46.7 km | 108 MW | [5] |
| Commonwealth Edison substation · Commonwealth Edison | Substation | 0.17 km | — | [1] |
| ComEd Itasca 138kV-345kV Substation · Commonwealth Edison | Substation | 1.38 km | 345 kV | [1] |
| Tonne 138kV Substation · Commonwealth Edison | Substation | 2.57 km | 138 kV | [1] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
- 115,600 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
Other buildings on this campus
3- NTT Chicago CH1Operating · 113,600 sq ft footprint
- NTT Chicago CH3Operating · 84,000 sq ft footprint
- NTT Chicago CH4Operating · 101,400 sq ft footprint
All claims (provenance audit)
15| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | NTT Chicago CH2way/1271571726 name=NTT Chicago CH2 | [1] | Likely | 2026-10-12 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-10-12 | Shown |
| Facility type | Colocation | [1] derived | Unverified | 2026-10-12 | Shown |
| Address | 275 East Pierce Road, Itasca, IL 60143 | [1] | Likely | 2026-10-12 | Shown |
| Operator | NTT Global Data Centersoperator=NTT | [1] | Likely | 2026-10-12 | Shown |
| Utility | Commonwealth Edison (ComEd)territory 4110: COMMONWEALTH EDISON CO (INVESTOR OWNED, EXELON CORP) | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [3] derived | Likely | — | Shown |
| Balancing authority | PJM | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Commonwealth Edison substationway/1537710030 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.2 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 345 kV | [1] derived | Likely | 2026-09-28 | Shown |
| State avg. industrial price | 11.87¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 15.19¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 2.46 GW | [5] derived | Confirmed | 202502 | Shown |
| Building footprint | 115,600 sq ft | [1] derived | Likely | 2026-10-12 | Shown |