DC
/

Netrality Data Centers

OperatingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.UnclassifiedSiteKansas City, Jackson County, Missouri

Netrality Data Centers is an operating data center in Kansas City, Missouri. Power capacity has not been disclosed or collected yet. Verification: unverified. 6 cited sources.

20% profile completeness
14 claims from 7 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Oct 12, 2026
Follow

Get changes to Netrality Data Centers

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Netrality Data Centers.” /facilities/netrality-data-centers-kansas-city-mo. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_netrality_data_centers_kansas_city_mo_2026,
  title = {{Netrality Data Centers}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/netrality-data-centers-kansas-city-mo}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Evergy Missouri West · SPP
Substation: Charlotte Substation (161 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalOct 12, 2026
    Community map
    • Oct 12, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Netrality Data Centers
  2. substation
    Charlotte Substation (161 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.88 km away. Proximity does not establish that it serves the site.
  3. transmission
    Navy-Terrace (161 kV)[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (1.15 km away). Not confirmed as the supply path.
  4. utility
    Evergy Missouri West[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    SPP[3]
    Service territoryLikely
    Balancing authority: SWPP
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates1

  • Large Load Power Service (LLPS) rate plan for loads over 75 MW[7]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Nov 2025.Nov 2025
    Evergy Missouri West · Missouri Public Service Commission · Approved (non-unanimous stipulation)

    “The provisions in the LLPS rate plans in both Kansas and Missouri apply to new or existing customers adding load in excess of 75 MWs. … agreed to a non-unanimous global stipulation and agreement for the LLPS rate plan which the MPSC approved in November 2025.”

Location & imagery

Street address
Coordinates
39.10091, -94.58115
Address
1102 Grand Boulevard, Kansas City, MO 64106[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
County
Jackson County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: City of Kansas City - (Ks).

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
SPP[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
SWPP[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Charlotte Substation (161 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.9 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
161 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
9.87¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Missouri statewide average, July 2026.

State avg. commercial price
12.64¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Missouri statewide average, July 2026.

Generation within 50 km
3.83 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

20 EIA-reported plants within 50 km.

Generation queued in county
879 MW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived

8 active generation interconnection requests in Jackson County: Storage 879 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Navy-Terrace · EvergyTransmission line1.15 km161 kV[1]
Grand Avenue-Northeast · EvergyTransmission line1.18 km161 kV[1]
Grand West-Navy 2 · EvergyTransmission line1.19 km161 kV[1]
Grand West-Navy 1 · EvergyTransmission line1.19 km161 kV[1]
Crosstown-Troost · EvergyTransmission line1.25 km161 kV[1]
Terrace-State Line · EvergyTransmission line2 km161 kV[1]
Northeast (Mo) · Evergy MetroPower plant (Petroleum)3 km396 MW[6]
Quindaro · City of Kansas City - (KS)Power plant (Natural Gas)7.3 km251 MW[6]
Hawthorn · Evergy MetroPower plant (Coal)9.5 km955 MW[6]
Nearman Creek · City of Kansas City - (KS)Power plant (Coal)12.5 km315 MW[6]
Greenwood (Mo) · Evergy Missouri WestPower plant (Natural Gas)36.1 km253 MW[6]
Dogwood Energy Facility · Dogwood Power Management, LLCPower plant (Natural Gas)42 km657 MW[6]
South Harper · Evergy Missouri WestPower plant (Natural Gas)47.5 km321 MW[6]
West Gardner · Evergy MetroPower plant (Natural Gas)49.4 km315 MW[6]
Charlotte Substation · EvergySubstation0.88 km161 kV[1]
Grand Avenue West Substation · EvergySubstation1.18 km161 kV[1]
Crosstown Substation · EvergySubstation1.2 km161 kV[1]
Navy Substation · EvergySubstation1.21 km161 kV[1]
Grand Avenue Substation · EvergySubstation1.23 km161 kV[1]
Terrace Substation · EvergySubstation1.95 km161 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
GEN-2022-144 at Blue Mills BESS 161kV SubstationSPP GEN-2022-144StorageIA signed · proposed 2030-12210 MW[4]
GEN-2024-074 at Duncan Road 161 kV SubstationSPP GEN-2024-074StorageIn study · proposed 2028-12200 MW[4]
GEN-2024-352 at Sibley 345 kV SubstationSPP GEN-2024-352StorageIn study · proposed 2030-12199 MW[4]
GEN-2023-171 at Sub M 161 kV SubstationSPP GEN-2023-171StorageIn study · proposed 2028-06150 MW[4]
GEN-2021-042 at Independence Power & Light, Blue Valley Substation, 161kV BusSPP GEN-2021-042StorageIA signed · proposed 2028-0550 MW[4]
GEN-2018-031 at Blue Valley 161kV SubstationSPP GEN-2018-031StorageIA signed · proposed 2028-0550 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

14
FieldValueSourceConfidenceAs ofStatus
NameNetrality Data Centersnode/9922928085 name=Netrality Data Centers[1] Likely2026-10-12Shown
StatusOperating[1] derivedUnverified2026-10-12Shown
Websitehttps://netrality.com/locations/data-center-kansas-city/[1] Likely2026-10-12Shown
Address1102 Grand Boulevard, Kansas City, MO 64106[1] Likely2026-10-12Shown
UtilityEvergy Missouri Westterritory 12698: EVERGY MISSOURI WEST (INVESTOR OWNED, GREAT PLAINS ENERGY)[2] derivedUnverified2022Shown
ISO / RTOSPPSOUTHWEST POWER POOL[3] derivedLikely—Shown
Balancing authoritySWPP[2] derivedLikely—Shown
Nearest mapped substationCharlotte Substation (161 kV)way/983840240[1] derivedLikely2026-09-28Shown
Distance to substation0.9 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby161 kV[1] derivedLikely2026-09-28Shown
Generation queued in county879 MW[4] derivedConfirmed2026-10-12Shown
State avg. industrial price9.87¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price12.64¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km3.83 GW[6] derivedConfirmed202502Shown