NCSA Petascale Computing Facility
Also known as Blue Waters
NCSA Petascale Computing Facility is an operating data center in Champaign, Illinois. Power capacity has not been disclosed or collected yet. Verification: unverified. 6 cited sources.
Follow
Get changes to NCSA Petascale Computing Facility
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “NCSA Petascale Computing Facility.” /facilities/ncsa-petascale-computing-facility-champaign-il. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_ncsa_petascale_computing_facility_champa_2026,
title = {{NCSA Petascale Computing Facility}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/ncsa-petascale-computing-facility-champaign-il}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityNCSA Petascale Computing Facility
- →substationUnnamed substation[1]Proximity onlyUnverifiedNearest mapped substation, 0.64 km away. Proximity does not establish that it serves the site.
- →transmission138 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.85 km away). Not confirmed as the supply path.
- →utilityAmeren Illinois Company[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
- University of Illinois Abbott Power Plt (Natural Gas, 79 MW) is 1.1 km away[6]EIA plant within 1.5 km; proximity does not establish that it supplies the facilityNatural gasCo-located79 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Unverified
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits1
- University of Illinois Abbott Power Plt (Natural Gas, 79 MW) is 1.1 km away79 MW[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Natural gas · Co-located
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for Ameren Illinois Company. Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 40.09516, -88.24204
- Address
- 1725 South Oak Street, Champaign, IL 61820[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
- County
- Champaign County

Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Eastern Illinois Elec Coop.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- MISO[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Location falls inside this ISO/RTO footprint.
- Balancing authority
- MISO[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Unnamed substation[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 0.6 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 138 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 11.87¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Illinois statewide average, July 2026.
- State avg. commercial price
- 15.19¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Illinois statewide average, July 2026.
- Generation within 50 km
- 1.91 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
18 EIA-reported plants within 50 km.
- Generation queued in county
- 1.12 GW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived
7 active generation interconnection requests in Champaign County: Storage 500 MW, Wind 288 MW, Solar 191 MW, Hybrid 135 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 138 kV line | Transmission line | 0.85 km | 138 kV | [1] |
| University of Illinois Abbott Power Plt · University of Illinois | Power plant (Natural Gas) | 1.1 km | 79 MW | [6] |
| Goose Creek Energy Center · Union Electric Co - (MO) | Power plant (Natural Gas) | 30.5 km | 438 MW | [6] |
| Prosperity Wind · Prosperity Wind, LLC | Power plant (Wind) | 31.3 km | 300 MW | [6] |
| Harvest Ridge Wind Farm · Harvest Ridge Wind Farm | Power plant (Wind) | 32.7 km | 202 MW | [6] |
| California Ridge Wind Energy LLC · SunEdison LLC | Power plant (Wind) | 33.5 km | 200 MW | [6] |
| Sapphire Sky Wind Energy LLC · Invenergy Services LLC | Power plant (Wind) | 36.6 km | 260 MW | [6] |
| Gibson City Energy Center LLC · Earthrise Energy, PBC | Power plant (Natural Gas) | 43.8 km | 232 MW | [6] |
| Pioneer Trail Wind Farm, LLC · RWE Renewables Americas, LLC | Power plant (Wind) | 45.1 km | 150 MW | [6] |
| Unnamed substation | Substation | 0.64 km | — | [1] |
| Unnamed substation | Substation | 0.82 km | 138 kV | [1] |
| Unnamed substation | Substation | 0.89 km | — | [1] |
| Unnamed substation | Substation | 1.37 km | — | [1] |
| Southeast Substation | Substation | 1.74 km | — | [1] |
| Ameren substation · Ameren | Substation | 1.96 km | — | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| J3558 at RisingMISO J3558 | Storage | In study · proposed 2027-09 | 300 MW | [4] |
| J3353 at RisingMISO J3353 | Solar | In study · proposed 2028-08 | 191 MW | [4] |
| J1967 at Rantoul East 138kVMISO J1967 | Wind | In study · proposed 2025-10 | 150 MW | [4] |
| J3918 at 4RANTOUL - 4RISING 138.0kVMISO J3918 | Wind | In study · proposed 2028-06 | 138 MW | [4] |
| J2648 at Sidney 138 kVMISO J2648 | Hybrid | In study · proposed 2027-09 | 135 MW | [4] |
| J2124 at RisingMISO J2124 | Storage | In study · proposed 2022-12 | 100 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
- 45,700 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
15| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | NCSA Petascale Computing Facilityway/138260136 name=NCSA Petascale Computing Facility | [1] | Likely | 2026-10-12 | Shown |
| Also known as | Blue Watersalt_name=Blue Waters | [1] | Likely | 2026-10-12 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-10-12 | Shown |
| Address | 1725 South Oak Street, Champaign, IL 61820 | [1] | Likely | 2026-10-12 | Shown |
| Utility | Ameren Illinois Companyterritory 56697: AMEREN ILLINOIS COMPANY (INVESTOR OWNED, AMEREN ILLINOIS COMPAN | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | MISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC.. | [3] derived | Likely | — | Shown |
| Balancing authority | MISO | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substationway/1159692297 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.6 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 138 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 1.12 GW | [4] derived | Confirmed | 2026-10-12 | Shown |
| State avg. industrial price | 11.87¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 15.19¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.91 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 45,700 sq ft | [1] derived | Likely | 2026-10-12 | Shown |