DC
/

Lumen Technologies

OperatingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.UnclassifiedBuildingTustin, Orange County, California

Lumen Technologies is an operating data center in Tustin, California. Power capacity has not been disclosed or collected yet. Verification: unverified. 6 cited sources.

20% profile completeness
14 claims from 6 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Oct 12, 2026
Follow

Get changes to Lumen Technologies

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Lumen Technologies.” /facilities/lumen-technologies-tustin-ca. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_lumen_technologies_tustin_ca_2026,
  title = {{Lumen Technologies}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/lumen-technologies-tustin-ca}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
85,900 sq ft[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Southern California Edison · CAISO
Substation: Bryan Substation (66 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalOct 12, 2026
    Community map
    • Oct 12, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Lumen Technologies
  2. substation
    Bryan Substation (66 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 1.98 km away. Proximity does not establish that it serves the site.
  3. transmission
    Johanna - Santiago; Ellis - Santiago (220 kV)[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (1.63 km away). Not confirmed as the supply path.
  4. utility
    Southern California Edison[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    CAISO[3]
    Service territoryLikely
    Balancing authority: CISO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for Southern California Edison. Know one? Add a source

Location & imagery

Mapped outline
Coordinates
33.71697, -117.80604
Address
14452 Franklin Avenue, Tustin, 92780[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
County
Orange County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Location falls inside this utility's retail service territory.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
CAISO[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
CISO[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Bryan Substation (66 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
2 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
220 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
25.11¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

California statewide average, July 2026.

State avg. commercial price
30.56¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

California statewide average, July 2026.

Generation within 50 km
8.53 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

161 EIA-reported plants within 50 km.

Generation queued in county
400 MW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived

2 active generation interconnection requests in Orange County: Storage 400 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Johanna - Bryan - Irvine;Villa Park - Bryan · Southern California EdisonTransmission line1.03 km66 kV[1]
Johanna - Santiago; Ellis - Santiago · Southern California EdisonTransmission line1.63 km220 kV[1]
Santiago - Estrella #1 · Southern California EdisonTransmission line1.66 km66 kV[1]
Johanna - Bryan - Irvine · Southern California EdisonTransmission line1.68 km66 kV[1]
66 kV line · Southern California EdisonTransmission line1.96 km66 kV[1]
Villa Park - Bryan · Southern California EdisonTransmission line1.97 km66 kV[1]
Aes Huntington Beach Energy Project · AES Huntington Beach Energy, LLCPower plant (Natural Gas)17.9 km630 MW[6]
Haynes · Los Angeles Department of Water & PowerPower plant (Natural Gas)27.6 km1.6 GW[6]
Aes Alamitos Energy Center · AES Alamitos Energy, LLCPower plant (Natural Gas)27.8 km603 MW[6]
Aes Alamitos LLC · AES Alamitos LLCPower plant (Natural Gas)27.9 km1.14 GW[6]
Walnut Creek Energy Park · Walnut Creek LLCPower plant (Natural Gas)34.9 km501 MW[6]
Long Beach Generation LLC · Long Beach Generation LLCPower plant (Natural Gas)39.1 km260 MW[6]
Watson Cogeneration · ARCO Products Co-WatsonPower plant (Natural Gas)42 km398 MW[6]
Harbor · Los Angeles Department of Water & PowerPower plant (Natural Gas)42.9 km428 MW[6]
Bryan Substation · Southern California EdisonSubstation1.98 km66 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
TYRELL ENERGY STORAGECAISO 2125StorageIA signed · proposed 2032-05300 MW[4]
LOS NIETOSCAISO 2129StorageIA signed · proposed 2032-03100 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
85,900 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

14
FieldValueSourceConfidenceAs ofStatus
NameLumen Technologiesway/441502816 name=Lumen Technologies[1] Likely2026-10-12Shown
StatusOperating[1] derivedUnverified2026-10-12Shown
Address14452 Franklin Avenue, Tustin, 92780[1] Likely2026-10-12Shown
UtilitySouthern California Edisonterritory 17609: SOUTHERN CALIFORNIA EDISON CO (INVESTOR OWNED, SOUTHERN CALIFOR[2] derivedLikely2022Shown
ISO / RTOCAISOCALIFORNIA INDEPENDENT SYSTEM OPERATOR[3] derivedLikely—Shown
Balancing authorityCISO[2] derivedLikely—Shown
Nearest mapped substationBryan Substation (66 kV)way/66983703[1] derivedLikely2026-09-28Shown
Distance to substation2 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby220 kV[1] derivedLikely2026-09-28Shown
Generation queued in county400 MW[4] derivedConfirmed2026-10-12Shown
State avg. industrial price25.11¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price30.56¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km8.53 GW[6] derivedConfirmed202502Shown
Building footprint85,900 sq ft[1] derivedLikely2026-10-12Shown