Johns Hopkins Data Center
Johns Hopkins Data Center is an operating data center in Maryland. Power capacity has not been disclosed or collected yet. Verification: unverified. 6 cited sources.
Follow
Get changes to Johns Hopkins Data Center
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Johns Hopkins Data Center.” /facilities/johns-hopkins-data-center-baltimore-md. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_johns_hopkins_data_center_baltimore_md_2026,
title = {{Johns Hopkins Data Center}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/johns-hopkins-data-center-baltimore-md}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityJohns Hopkins Data Center
- →substationUnnamed substation[1]Proximity onlyUnverifiedNearest mapped substation, 0.4 km away. Proximity does not establish that it serves the site.
- →transmissionBaltimore - North Point (138 kV)[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.37 km away). Not confirmed as the supply path.
- →utilityBaltimore Gas & Electric CO[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
- Philadelphia (Petroleum, 60 MW) is 1.2 km away[6]EIA plant within 1.5 km; proximity does not establish that it supplies the facilityUnknown typeCo-located60 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Unverified
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits1
- Philadelphia (Petroleum, 60 MW) is 1.2 km away60 MW[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Unknown type · Co-located
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for Baltimore Gas & Electric CO. Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 39.29356, -76.55167
- County
- Baltimore
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- PJM[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Location falls inside this ISO/RTO footprint.
- Balancing authority
- PJM[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Unnamed substation[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 0.4 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 138 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 16.21¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Maryland statewide average, July 2026.
- State avg. commercial price
- 17.51¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Maryland statewide average, July 2026.
- Generation within 50 km
- 2.92 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
87 EIA-reported plants within 50 km.
- Generation queued in county
- 1.11 GW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived
7 active generation interconnection requests in Baltimore: Storage 1,095 MW, Solar 10 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Baltimore - North Point · Amtrak | Transmission line | 0.37 km | 138 kV | [1] |
| 115 kV line | Transmission line | 1.07 km | 115 kV | [1] |
| (Hazlewood) to Erdman · Baltimore Gas and Electric | Transmission line | 1.81 km | 115 kV | [1] |
| Philadelphia · Constellation Power Source Generation, LLC | Power plant (Petroleum) | 1.2 km | 60 MW | [6] |
| Wheelabrator Baltimore Refuse · Wheelabrator Environmental Systems | Power plant (Biomass) | 7.4 km | 61 MW | [6] |
| Brandon Shores · Brandon Shores LLC | Power plant (Coal) | 12.5 km | 1.27 GW | [6] |
| Herbert A Wagner · H.A. Wagner LLC | Power plant (Petroleum) | 13 km | 841 MW | [6] |
| Perryman · Constellation Power Source Generation, LLC | Power plant (Natural Gas) | 32.9 km | 404 MW | [6] |
| Fairview Farms · Madison Energy Investments LLC | Power plant (Solar) | 34.5 km | 30 MW | [6] |
| Central Utility Plant At White Oak · GSA Metropolitan Service Center | Power plant (Natural Gas) | 46.7 km | 54 MW | [6] |
| Umcp Chp Plant · Trigen-Cinergy Solutions College Park | Power plant (Natural Gas) | 47.6 km | 21 MW | [6] |
| Unnamed substation | Substation | 0.4 km | — | [1] |
| Highlandtown Substation · Baltimore Gas and Electric | Substation | 1.06 km | 115 kV | [1] |
| Philadelphia Road Substation · Baltimore Gas and Electric | Substation | 1.17 km | 115 kV | [1] |
| Erdman Substation · Baltimore Gas and Electric | Substation | 1.89 km | 115 kV | [1] |
| Unnamed substation | Substation | 1.94 km | — | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Northeast - CP Crane 115 kVPJM AJ1-037 | Storage | In study · proposed 2028-10 | 500 MW | [4] |
| Northeast-CP Crane 115kVPJM AH2-162 | Storage | In study · proposed 2026-03 | 200 MW | [4] |
| East Point - Golden Ring 115kVPJM AH1-261 | Storage | In study · proposed 2025-06 | 135 MW | [4] |
| Northeast - Windy Edge 115 kVPJM AI1-189 | Storage | In study · proposed 2027-12 | 110 MW | [4] |
| Northeast-CP Crane 115kVPJM AI1-130 | Storage | In study · proposed 2026-09 | 75 MW | [4] |
| TBD 115 kVPJM AI1-131 | Storage | In study · proposed 2026-09 | 75 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
- 3,900 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
13| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Johns Hopkins Data Centerway/931369845 name=Johns Hopkins Data Center | [1] | Likely | 2026-10-12 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-10-12 | Shown |
| Utility | Baltimore Gas & Electric COterritory 1167: BALTIMORE GAS & ELECTRIC CO (INVESTOR OWNED, EXELON CORP) | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [3] derived | Likely | — | Shown |
| Balancing authority | PJM | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substationway/1485090645 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.4 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 138 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 1.11 GW | [4] derived | Confirmed | 2026-10-12 | Shown |
| State avg. industrial price | 16.21¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 17.51¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 2.92 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 3,900 sq ft | [1] derived | Likely | 2026-10-12 | Shown |