Intergate Seattle West Building A
Intergate Seattle West Building A is an operating colocation in Tukwila, Washington. Operated or owned by Sabey Data Centers. Power capacity has not been disclosed or collected yet. Verification: unverified. 5 cited sources.
Part of Sabey Data Centers — King County, WA campus
Follow
Get changes to Intergate Seattle West Building A
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Intergate Seattle West Building A.” /facilities/intergate-seattle-west-building-a-tukwila-wa. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_intergate_seattle_west_building_a_tukwil_2026,
title = {{Intergate Seattle West Building A}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/intergate-seattle-west-building-a-tukwila-wa}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityIntergate Seattle West Building A
- →substationCreston-Nelson Substation (230 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 2.54 km away. Proximity does not establish that it serves the site.
- →transmission230 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (1.18 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for City of Seattle - (Wa). Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 47.49216, -122.29344
- Address
- 12301 Tukwila International Boulevard, Tukwila, WA 98168[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
- County
- King County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
- Utility
Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: City of Milton - (Wa).
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- None (non-RTO region)[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
- SCL[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Creston-Nelson Substation (230 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 2.5 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 230 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 7.51¢/kWh[4]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Washington statewide average, July 2026.
- State avg. commercial price
- 11.78¢/kWh[4]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Washington statewide average, July 2026.
- Generation within 50 km
- 552 MW[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
16 EIA-reported plants within 50 km.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 230 kV line | Transmission line | 1.18 km | 230 kV | [1] |
| University of Washington Power Plant · University of Washington | Power plant (Petroleum) | 18 km | 15 MW | [5] |
| Snoqualmie 2 · Puget Sound Energy Inc | Power plant (Hydroelectric) | 34.4 km | 34 MW | [5] |
| Snoqualmie · Puget Sound Energy Inc | Power plant (Hydroelectric) | 34.7 km | 12 MW | [5] |
| Cedar Falls (Wa) · City of Seattle - (WA) | Power plant (Hydroelectric) | 39.3 km | 30 MW | [5] |
| South Fork Tolt · City of Seattle - (WA) | Power plant (Hydroelectric) | 44.6 km | 17 MW | [5] |
| Frederickson Power LP · Frederickson Power LP | Power plant (Natural Gas) | 45.5 km | 246 MW | [5] |
| Twin Falls Hydro · Central Rivers Power US, LLC | Power plant (Hydroelectric) | 45.8 km | 23 MW | [5] |
| Frederickson · Puget Sound Energy Inc | Power plant (Natural Gas) | 46.2 km | 134 MW | [5] |
| Creston-Nelson Substation | Substation | 2.54 km | 230 kV | [1] |
| Duwamish Substation | Substation | 2.69 km | 230 kV | [1] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
- 38,500 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
Other buildings on this campus
5- Intergate Seattle East Building 1Operating · 97,800 sq ft footprint
- Intergate Seattle East Building 5Operating · 200,000 sq ft footprint
- Intergate Seattle East Building 3Operating · 203,300 sq ft footprint
- Intergate Seattle West Building COperating · 19,800 sq ft footprint
- Intergate Seattle West Building BOperating · 19,100 sq ft footprint
All claims (provenance audit)
15| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Intergate Seattle West Building Away/337126742 name=Intergate Seattle West Building A | [1] | Likely | 2026-10-12 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-10-12 | Shown |
| Facility type | Colocation | [1] derived | Unverified | 2026-10-12 | Shown |
| Address | 12301 Tukwila International Boulevard, Tukwila, WA 98168 | [1] | Likely | 2026-10-12 | Shown |
| Operator | Sabey Data Centersoperator=Sabey Data Centers | [1] | Likely | 2026-10-12 | Shown |
| Utility | City of Seattle - (Wa)territory 16868: CITY OF SEATTLE - (WA) (MUNICIPAL, SEATTLE PUBLIC UTILITIES) | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | None (non-RTO region) | [3] derived | Likely | — | Shown |
| Balancing authority | SCL | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Creston-Nelson Substation (230 kV)way/37047357 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 2.5 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [1] derived | Likely | 2026-09-28 | Shown |
| State avg. industrial price | 7.51¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 11.78¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 552 MW | [5] derived | Confirmed | 202502 | Shown |
| Building footprint | 38,500 sq ft | [1] derived | Likely | 2026-10-12 | Shown |