Google Kansas City East
Google Kansas City East is an operating ai campus in Missouri. Operated or owned by Google. Current power: 126 MW (estimated). Verification: verified operating. 8 cited sources.
Follow
Get changes to Google Kansas City East
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Google Kansas City East.” /facilities/google-kansas-city-east-clay-county-mo. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_google_kansas_city_east_clay_county_mo_2026,
title = {{Google Kansas City East}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/google-kansas-city-east-clay-county-mo}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- EnergizationAug 1, 2026
Satellite imagery
- Aug 1, 2026 · Building 1 operational. Estimated based on present construction progress and typical timelines.[1]
- OperationalAug 1, 2026
Satellite imagery
- Aug 1, 2026 · Building 1 operational. Estimated based on present construction progress and typical timelines.[1]
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Model estimate, Satellite imagery.
Grid path
- →facilityGoogle Kansas City East
- →substationOn-site substation[1]Satellite imageryLikely3 substation outlines traced inside the campus on satellite imagery
- →transmissionHawthorn - Nashua (345 kV)[3]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.83 km away). Not confirmed as the supply path.
- utilityNot identifiedUnknownUnverified
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling1
- Evaporative (cooling towers)[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Apr 16, 2026.Apr 16, 2026cooling
“Building 2 backup generator construction has begun, and cooling tower installation is about halfway complete.”
Named in Epoch AI's satellite-imagery notes for this date.
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for the serving utility. Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 39.18115, -94.46527
- County
- Clay County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developer
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
Power (all fields)
- Current facility power
- 126 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 1, 2026.Likelyestimated
Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.
- Current IT capacity
- 105 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 1, 2026.Likelyestimated
Estimated IT load currently online, based on buildings observed operational.
- Estimated annual consumption
- 773 GWh/yr[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Speculativeestimated
126 MW × 8,760 h × 70% utilization.
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- Highest-voltage line nearby
- 345 kV[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 9.87¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Missouri statewide average, July 2026.
- State avg. commercial price
- 12.64¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Missouri statewide average, July 2026.
- Generation within 50 km
- 3.17 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
17 EIA-reported plants within 50 km.
- Generation queued in county
- 870 MW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived
6 active generation interconnection requests in Clay County: Storage 870 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Hawthorn - Nashua · Evergy | Transmission line | 0.83 km | 345 kV | [3] |
| Hawthorn · Evergy Metro | Power plant (Coal) | 5.7 km | 955 MW | [6] |
| Northeast (Mo) · Evergy Metro | Power plant (Petroleum) | 10.5 km | 396 MW | [6] |
| Quindaro · City of Kansas City - (KS) | Power plant (Natural Gas) | 15.3 km | 251 MW | [6] |
| Kaw · City of Kansas City - (KS) | Power plant (Natural Gas) | 19.2 km | 140 MW | [6] |
| Nearman Creek · City of Kansas City - (KS) | Power plant (Coal) | 20.1 km | 315 MW | [6] |
| Greenwood (Mo) · Evergy Missouri West | Power plant (Natural Gas) | 38.4 km | 253 MW | [6] |
| Dogwood Energy Facility · Dogwood Power Management, LLC | Power plant (Natural Gas) | 45.4 km | 657 MW | [6] |
| Ralph Green · Evergy Missouri West | Power plant (Natural Gas) | 46.7 km | 69 MW | [6] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| GEN-2024-370 at Smithville 161 kV SubstationSPP GEN-2024-370 | Storage | In study · proposed 2028-03 | 250 MW | [4] |
| GEN-2022-142 at Shoal Creek 161 kV SubstationSPP GEN-2022-142 | Storage | In study · proposed 2030-12 | 210 MW | [4] |
| GEN-2023-033 at Liberty South 161 kV SubstationSPP GEN-2023-033 | Storage | IA signed · proposed 2029-12 | 200 MW | [4] |
| GEN-2024-090 at Smithville 161 kV SubstationSPP GEN-2024-090 | Storage | In study · proposed 2028-03 | 100 MW | [4] |
| GEN-2022-102 at Liberty West 161 kVSPP GEN-2022-102 | Storage | IA signed · proposed 2027-01 | 100 MW | [4] |
| AFS NJG-2026-001 at Shoal Creek 161kV substationSPP AFS NJG-2026-001 | Storage | In study | 10 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction startJan 1, 2024[1]
- First operationalAug 1, 2026[1]
- Expected completion—
- Buildings (planned)
- 4[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 1, 2026.Likelyderived
Count of building outlines traced on satellite imagery.
- Buildings operational
- 1[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 1, 2026.Likelyestimated
Real estate
None sourced yet
None sourced yet
None sourced yet
- Capital cost / investment
- $4B[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 1, 2026.Likelyestimated
Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
Compute
- Compute (H100-equivalents)
- 202,600[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 1, 2026.Likelyestimated
What changed (last 3 years)
Follow this facility (RSS)- Buildings (planned)
- Buildings operational
- StatusUnder constructionJan 1, 2024[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→OperatingAug 1, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Timeline
- Jan 1, 2024[1]
Land clearing has begun for the site
- Mar 1, 2024[1]
Foundation work begins on Building 1
- Oct 1, 2024[1]
Foundation work begins on Building 2. Building 1 roof is fully black.
- Jul 1, 2025[1]
Foundation work begins for Building 3. Building 1 generators seem complete.
- Nov 1, 2025[1]
Foundation work begins for Building 4. Building 2 roof is almost complete, and construction appears to have started on cooling. Building 1 cooling construction continues, and the substation right next to it seems finished as well.
- Apr 16, 2026[1]
Building 1 is almost complete, with only cooling needing 4 more fans. Building 2 backup generator construction has begun, and cooling tower installation is about halfway complete. Building 3's roof is almost complete, and construction has started on generators and cooling. A clear foundation has been cleared for Building 4, though no construction has begun.
Building 1 operational. Estimated based on present construction progress and typical timelines.
All claims (provenance audit)
30| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Google Kansas City East | [1] | Likely | 2026-08-01 | Shown |
| Status | Under construction | [1] derived | Likely | 2024-01-01 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2024-03-01 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2024-10-01 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2025-07-01 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2025-11-01 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2026-04-16 | Superseded / alternative |
| Status | Operating | [1] derived | Likely | 2026-08-01 | Shown |
| Facility type | AI campus | [1] derived | Likely | 2026-08-01 | Shown |
| Owner | GoogleOwner: Google | [1] | Confirmed | 2026-08-01 | Shown |
| Current facility power | 126 MW | [1] estimated | Likely | 2026-08-01 | Shown |
| Current IT capacity | 105 MW | [1] estimated | Likely | 2026-08-01 | Shown |
| Estimated annual consumption | 773 GWh/yr | [2] estimated | Speculative | 2026-10-12 | Shown |
| Highest-voltage line nearby | 345 kV | [3] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 870 MW | [4] derived | Confirmed | 2026-10-12 | Shown |
| State avg. industrial price | 9.87¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 12.64¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 3.17 GW | [6] derived | Confirmed | 202502 | Shown |
| Buildings (planned) | 4 | [1] derived | Likely | 2026-08-01 | Shown |
| Buildings operational | 1 | [1] estimated | Likely | 2026-08-01 | Shown |
| Buildings operational | 0 | [1] estimated | Likely | 2024-01-01 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2024-03-01 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2024-10-01 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2025-07-01 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2025-11-01 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2026-04-16 | Superseded / alternative |
| Capital cost / investment | $4B | [1] estimated | Likely | 2026-08-01 | Shown |
| Compute (H100-equivalents) | 202,600 | [1] estimated | Likely | 2026-08-01 | Shown |
| Construction start | Jan 1, 2024 | [1] derived | Likely | 2026-08-01 | Shown |
| First operational | Aug 1, 2026 | [1] derived | Likely | 2026-08-01 | Shown |