DC
/

Equinix New York Secaucus NY4

OperatingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.ColocationBuildingSecaucus, Hudson County, New Jersey

Equinix New York Secaucus NY4 is an operating colocation in Secaucus, New Jersey. Operated or owned by Equinix. Power capacity has not been disclosed or collected yet. Verification: unverified. 6 cited sources.

Part of Equinix — Secaucus, NJ campus

30% profile completeness
16 claims from 6 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Oct 12, 2026
Follow

Get changes to Equinix New York Secaucus NY4

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Equinix New York Secaucus NY4.” /facilities/equinix-new-york-secaucus-ny4-secaucus-nj. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_equinix_new_york_secaucus_ny4_secaucus_n_2026,
  title = {{Equinix New York Secaucus NY4}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/equinix-new-york-secaucus-ny4-secaucus-nj}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
317,600 sq ft[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
PSE&G · PJM
Substation: Penhorn Substation (230 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalOct 12, 2026
    Community map
    • Oct 12, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Equinix New York Secaucus NY4
  2. substation
    Penhorn Substation (230 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 1.9 km away. Proximity does not establish that it serves the site.
  3. transmission
    Hudson - Bergen (345 kV)[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (1.9 km away). Not confirmed as the supply path.
  4. utility
    PSE&G[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    PJM[3]
    Service territoryLikely
    Balancing authority: PJM
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for PSE&G. Know one? Add a source

Location & imagery

Mapped outline
Coordinates
40.77643, -74.06978
Address
755 Secaucus Road, Secaucus, NJ 07094[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
County
Hudson County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:
PSE&G[2]Likely

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Operator
Utility
PSE&G[2]Likely

Location falls inside this utility's retail service territory.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
PJM[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
PJM[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Penhorn Substation (230 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
1.9 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
345 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
15.63¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

New Jersey statewide average, July 2026.

State avg. commercial price
19.17¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

New Jersey statewide average, July 2026.

Generation within 50 km
19.92 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

273 EIA-reported plants within 50 km.

Generation queued in county
360 MW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived

3 active generation interconnection requests in Hudson County: Storage 360 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Belleville - Marion · Public Service Enterprise GroupTransmission line1.13 km230 kV[1]
138 kV line · AmtrakTransmission line1.18 km138 kV[1]
Penhorn - Homestead · Public Service Enterprise GroupTransmission line1.88 km230 kV[1]
230 kV line · PSE&GTransmission line1.89 km230 kV[1]
Hudson - Bergen · Public Service Enterprise GroupTransmission line1.9 km345 kV[1]
Marion - Penhorn · Public Service Enterprise GroupTransmission line1.9 km230 kV[1]
Bergen Generating Station · Bergen Generating StationPower plant (Natural Gas)7.8 km1.26 GW[6]
Ravenswood · Ravenswood Operations LLCPower plant (Natural Gas)10.6 km1.96 GW[6]
Astoria Generating Station · U S Power Generating Company LLCPower plant (Natural Gas)13.3 km1.32 GW[6]
Linden Cogen Plant · EFS Cogen Holdings I LLCPower plant (Natural Gas)20.2 km904 MW[6]
Pseg Linden Generating Station · Linden Combined CyclePower plant (Natural Gas)20.7 km1.64 GW[6]
Arthur Kill Generating Station · NRG Arthur Kill Operations IncPower plant (Natural Gas)23.3 km896 MW[6]
Red Oak Power LLC · Red Oak Operating Services LLCPower plant (Natural Gas)43.4 km776 MW[6]
Bowline Point · Bowline, LLCPower plant (Natural Gas)48.3 km1.16 GW[6]
Penhorn Substation · Public Service Enterprise GroupSubstation1.9 km230 kV[1]
Amtrak Substation 42 · AmtrakSubstation2.23 km—[1]
Homestead Substation · Public Service Enterprise GroupSubstation2.33 km230 kV[1]
Union City Substation · PSE&GSubstation2.5 km69 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
Hudson Energy Storage FacilityPJM AF1-245StorageIA signed · proposed 2028-12200 MW[4]
Two Rivers StoragePJM AF2-415StorageIA signed · proposed 2028-05150 MW[4]
Railroad Avenue Energy StoragePJM AF2-416StorageSuspended · proposed 2026-0610 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
317,600 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

Other buildings on this campus

4

All claims (provenance audit)

16
FieldValueSourceConfidenceAs ofStatus
NameEquinix New York Secaucus NY4way/193611211 name=Equinix New York Secaucus NY4[1] Likely2026-10-12Shown
StatusOperating[1] derivedUnverified2026-10-12Shown
Facility typeColocation[1] derivedUnverified2026-10-12Shown
Address755 Secaucus Road, Secaucus, NJ 07094[1] Likely2026-10-12Shown
OperatorEquinixoperator=Equinix[1] Likely2026-10-12Shown
UtilityPSE&Gterritory 15477: PUBLIC SERVICE ELEC & GAS CO (INVESTOR OWNED, PUBLIC SERVICE EN[2] derivedLikely2022Shown
ISO / RTOPJMPJM INTERCONNECTION, LLC[3] derivedLikely—Shown
Balancing authorityPJM[2] derivedLikely—Shown
Nearest mapped substationPenhorn Substation (230 kV)way/95782054[1] derivedLikely2026-09-28Shown
Distance to substation1.9 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby345 kV[1] derivedLikely2026-09-28Shown
Generation queued in county360 MW[4] derivedConfirmed2026-10-12Shown
State avg. industrial price15.63¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price19.17¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km19.92 GW[6] derivedConfirmed202502Shown
Building footprint317,600 sq ft[1] derivedLikely2026-10-12Shown