DC
/

DataBank

OperatingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.UnclassifiedBuildingBrooklyn Park, Hennepin County, Minnesota

DataBank is an operating data center in Brooklyn Park, Minnesota. Power capacity has not been disclosed or collected yet. Verification: unverified. 7 cited sources.

20% profile completeness
15 claims from 7 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Oct 12, 2026
Follow

Get changes to DataBank

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “DataBank.” /facilities/databank-brooklyn-park-mn. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_databank_brooklyn_park_mn_2026,
  title = {{DataBank}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/databank-brooklyn-park-mn}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
114,600 sq ft[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Northern States Power CO - Minnesota · MISO
Substation: CenterPoint Energy (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalOct 12, 2026
    Community map
    • Oct 12, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    DataBank (MSP3)
  2. substation
    CenterPoint Energy[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.85 km away. Proximity does not establish that it serves the site.
  3. transmission
    345 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (1.44 km away). Not confirmed as the supply path.
  4. utility
    Northern States Power CO - Minnesota[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    MISO[3]
    Service territoryLikely
    Balancing authority: MISO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits1

  • Air permit MN0000002705301296[7]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.
    Other · Operating · No Violation Identified · Programs: Federally enforceable state operating permit; Area-source MACT (engines); NSR; State Implementation Plan

    ECHO lists “DATABANK MSP3” at 8111 OXBOW CREEK N, BROOKLYN PARK, 97 m from this facility's mapped location (matched by location; the permit name matches this facility or its companies).

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for Northern States Power CO - Minnesota. Know one? Add a source

Location & imagery

Mapped outline
Coordinates
45.14351, -93.38703
Address
8111 Oxbow Creek Drive North, Brooklyn Park, MN 55445[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
County
Hennepin County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: City of St Paul - (Ne).

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
MISO[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
MISO[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
CenterPoint Energy[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.9 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
345 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
10.34¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Minnesota statewide average, July 2026.

State avg. commercial price
13.49¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Minnesota statewide average, July 2026.

Generation within 50 km
5.62 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

87 EIA-reported plants within 50 km.

Generation queued in county
55 MW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived

1 active generation interconnection requests in Hennepin County: Gas 55 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
115 kV lineTransmission line0.93 km115 kV[1]
345 kV lineTransmission line1.44 km345 kV[1]
Riverside (Mn) · Northern States Power Co - MinnesotaPower plant (Natural Gas)16.3 km454 MW[6]
High Bridge · Northern States Power Co - MinnesotaPower plant (Natural Gas)32 km530 MW[6]
Black Dog · Northern States Power Co - MinnesotaPower plant (Natural Gas)38.5 km491 MW[6]
Blue Lake · Northern States Power Co - MinnesotaPower plant (Natural Gas)40 km447 MW[6]
Monticello Nuclear Facility · Northern States Power Co - MinnesotaPower plant (Nuclear)41.9 km617 MW[6]
Sherburne County · Northern States Power Co - MinnesotaPower plant (Coal)47.6 km1.56 GW[6]
Inver Hills · Northern States Power Co - MinnesotaPower plant (Natural Gas)48.6 km286 MW[6]
Allen S King · Northern States Power Co - MinnesotaPower plant (Coal)49.4 km511 MW[6]
CenterPoint Energy · CenterPoint EnergySubstation0.85 km—[1]
Largest queued generation in this countyFuelQueue statusMWSource
J3213 at Riverside 115kV SubstationMISO J3213GasIn study · proposed 2026-1255 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
114,600 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

15
FieldValueSourceConfidenceAs ofStatus
NameDataBankway/1343100173 name=DataBank[1] Likely2026-10-12Shown
StatusOperating[1] derivedUnverified2026-10-12Shown
Websitehttps://databank.com[1] Likely2026-10-12Shown
Address8111 Oxbow Creek Drive North, Brooklyn Park, MN 55445[1] Likely2026-10-12Shown
UtilityNorthern States Power CO - Minnesotaterritory 13781: NORTHERN STATES POWER CO - MINNESOTA (INVESTOR OWNED, XCEL ENER[2] derivedUnverified2022Shown
ISO / RTOMISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC..[3] derivedLikely—Shown
Balancing authorityMISO[2] derivedLikely—Shown
Nearest mapped substationCenterPoint Energyway/1243552786[1] derivedLikely2026-09-28Shown
Distance to substation0.9 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby345 kV[1] derivedLikely2026-09-28Shown
Generation queued in county55 MW[4] derivedConfirmed2026-10-12Shown
State avg. industrial price10.34¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price13.49¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km5.62 GW[6] derivedConfirmed202502Shown
Building footprint114,600 sq ft[1] derivedLikely2026-10-12Shown