DC
/

DartPoints Columbus

OperatingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.UnclassifiedBuildingColumbus, Bartholomew County, Indiana

DartPoints Columbus is an operating data center in Columbus, Indiana. Operated or owned by DartPoints. Planned capacity: 3 MW (announced). Verification: announced only. 8 cited sources.

40% profile completeness
17 claims from 8 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Oct 12, 2026
Follow

Get changes to DartPoints Columbus

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “DartPoints Columbus.” /facilities/dartpoints-columbus-columbus-in. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_dartpoints_columbus_columbus_in_2026,
  title = {{DartPoints Columbus}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/dartpoints-columbus-columbus-in}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
3 MW[3]
AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Sep 30, 2026.Likely
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Energized — operating
Medium confidence
Project verification
Announced only
Only announcements or press coverage found.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Duke Energy · MISO
Substation: Unnamed substation (69 kV) (nearest, unverified)

Power reality

Announced
3 MW[3]AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Sep 30, 2026.
Reported by dartpoints.com
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. AnnouncedSep 30, 2026
    Company announcement
    • Sep 30, 2026 · Planned capacity reported: 2.5 MW[3]
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalOct 12, 2026
    Community map
    • Oct 12, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Company announcement, Community map.

Grid path

  1. facility
    DartPoints Columbus (CLU01)
  2. substation
    Unnamed substation (69 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.58 km away. Proximity does not establish that it serves the site.
  3. transmission
    230 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.98 km away). Not confirmed as the supply path.
  4. utility
    Duke Energy[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    MISO[4]
    Service territoryLikely
    Balancing authority: MISO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

QueueRelationshipStageMW req.MW appr.QueuedExpected in servicePOI / TOSource · as of
MISO J1390
J1390 at Gallagher Station - Columbus 230 kV Line Tap · Solar
Generation at a nearby substation
Unverified
Queue POI “Gallagher Station - Columbus 230 kV Line Tap” names Columbus Substation (345kV), a substation mapped 2.51 km from the site (OSM). Sharing a POI does not mean this generation serves the facility.
Under construction
Done · DPP-2019 · GIA · Under Construction
150 ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.150Apr 29, 2019Aug 1, 2022Gallagher Station - Columbus 230 kV Line Tap
TO: DUKE ENERGY INDIANA, LLC
[5] Oct 12, 2026

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits1

  • Air permit IN0000001800500098[8]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Nov 29, 2012.Nov 29, 2012
    Minor Emissions · Operating · No Violation Identified · Programs: New Source Performance Standards (engines/turbines)

    ECHO lists “DATA CAVE, INC.” at 2425 TECHNOLOGY BLVD, COLUMBUS, 85 m from this facility's mapped location (matched by location; the permit name doesn't identify the operator).

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for Duke Energy. Know one? Add a source

Location & imagery

Mapped outline
Coordinates
39.18264, -85.89676
Address
2425 Technology Boulevard, Columbus, IN 47201[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
County
Bartholomew County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:
Duke Energy[2]Unverified

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility
Duke Energy[2]Unverified

Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Bartholomew County Rural E M C.

No tenants or end users identified in our sources yet.

Power (all fields)

Planned capacity
3 MW[3]AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Sep 30, 2026.Likely

“With 86,400 sq ft of slab floor space, this facility delivers 2.5 MW of utility power and 300 tons of N+1 cooling.” — Capacity stated on the operator's facility page (facility capacity). Recorded as design capacity, not as power currently in use.

Current facility power
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
MISO[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
MISO[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Unnamed substation (69 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.6 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
230 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
9.16¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Indiana statewide average, July 2026.

State avg. commercial price
13.30¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Indiana statewide average, July 2026.

Generation within 50 km
16 MW[7]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

5 EIA-reported plants within 50 km.

Generation queued in county
150 MW[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived

1 active generation interconnection requests in Bartholomew County: Solar 150 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
60 kV lineTransmission line0.19 km60 kV[1]
69 kV lineTransmission line0.56 km69 kV[1]
230 kV lineTransmission line0.98 km230 kV[1]
Camp Atterbury Microgrid Hybrid · Duke Energy Indiana, LLCPower plant (Batteries)22.8 km7 MW[7]
Jackson CO. Solar Res · Hoosier Energy R E C, IncPower plant (Solar)35.5 km1 MW[7]
Decatur CO. Solar Res (In) · Hoosier Energy R E C, IncPower plant (Solar)37.8 km1 MW[7]
Johnson CO. Solar Res · Hoosier Energy R E C, IncPower plant (Solar)40.1 km1 MW[7]
Poet Biorefining - Shelbyville · POET Biorefing- ShelbyvillePower plant (Natural Gas)42.4 km6 MW[7]
Unnamed substationSubstation0.58 km69 kV[1]
Columbus Substation (345kV) · Duke EnergySubstation2.51 km345 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
J1390 at Gallagher Station - Columbus 230 kV Line TapMISO J1390SolarUnder construction · proposed 2022-08150 MW[5]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —
Planned capacity
3 MW[3]AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Sep 30, 2026.Likely

“With 86,400 sq ft of slab floor space, this facility delivers 2.5 MW of utility power and 300 tons of N+1 cooling.” — Capacity stated on the operator's facility page (facility capacity). Recorded as design capacity, not as power currently in use.

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Site area
4.3 acres[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived

Area of the mapped OSM site outline.

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

17
FieldValueSourceConfidenceAs ofStatus
NameDartPoints Columbusway/773684159 name=DartPoints Columbus[1] Likely2026-10-12Shown
StatusOperating[1] derivedUnverified2026-10-12Shown
Websitehttps://dartpoints.com/locations/clu01-columbus-in/[1] Likely2026-10-12Shown
Address2425 Technology Boulevard, Columbus, IN 47201[1] Likely2026-10-12Shown
OperatorDartPointsoperator=DartPoints[1] Likely2026-10-12Shown
UtilityDuke Energyterritory 15470: DUKE ENERGY INDIANA, LLC (INVESTOR OWNED, DUKE ENERGY CORP)[2] derivedUnverified2022Shown
Planned capacity3 MW[3] Likely2026-09-30Shown
ISO / RTOMISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC..[4] derivedLikely—Shown
Balancing authorityMISO[2] derivedLikely—Shown
Nearest mapped substationUnnamed substation (69 kV)way/773684162[1] derivedLikely2026-09-28Shown
Distance to substation0.6 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby230 kV[1] derivedLikely2026-09-28Shown
Generation queued in county150 MW[5] derivedConfirmed2026-10-12Shown
State avg. industrial price9.16¢/kWh[6] Confirmed2026-07Shown
State avg. commercial price13.30¢/kWh[6] Confirmed2026-07Shown
Generation within 50 km16 MW[7] derivedConfirmed202502Shown
Site area4.3 acres[1] derivedLikely2026-10-12Shown