DartPoints Baton Rouge 1
DartPoints Baton Rouge 1 is an operating data center in Baton Rouge, Louisiana. Operated or owned by DartPoints. Planned capacity: 3 MW (announced). Verification: announced only. 7 cited sources.
Part of DartPoints — Baton Rouge, LA campus
Follow
Get changes to DartPoints Baton Rouge 1
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “DartPoints Baton Rouge 1.” /facilities/dartpoints-baton-rouge-1-baton-rouge-la. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_dartpoints_baton_rouge_1_baton_rouge_la_2026,
title = {{DartPoints Baton Rouge 1}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/dartpoints-baton-rouge-1-baton-rouge-la}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Company announcement, Community map.
Grid path
- →facilityDartPoints Baton Rouge 1 (BTR01)
- →substationFlorida Substation (69 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.8 km away. Proximity does not establish that it serves the site.
- →transmission69 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.79 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for Entergy. Know one? Add a source
Location & imagery
Street address- Coordinates
- 30.45383, -91.11605
- Address
- 7127 Florida Blvd, Baton Rouge, LA 70806[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
- County
- East Baton Rouge Parish
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
No tenants or end users identified in our sources yet.
Power (all fields)
- Planned capacity
- 3 MW[3]AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Sep 30, 2026.Likely
“Spanning 86,400 sq ft, DartPoints Baton Rouge 1 Data Center delivers 2.5 MW of utility power, 540 tons of N+1 cooling, and robust physical and network security.” — Capacity stated on the operator's facility page (facility capacity). Recorded as design capacity, not as power currently in use.
- Current facility power
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- MISO[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Location falls inside this ISO/RTO footprint.
- Balancing authority
- MISO[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Florida Substation (69 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 0.8 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 69 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 6.08¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Louisiana statewide average, July 2026.
- State avg. commercial price
- 10.97¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Louisiana statewide average, July 2026.
- Generation within 50 km
- 5.95 GW[7]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
20 EIA-reported plants within 50 km.
- Generation queued in county
- 199 MW[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived
2 active generation interconnection requests in East Baton Rouge Parish: Solar 160 MW, Storage 39 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 69 kV line · Entergy | Transmission line | 0.79 km | 69 kV | [1] |
| Louisiana 1 · Entergy Louisiana LLC | Power plant (Natural Gas) | 8 km | 382 MW | [7] |
| Plaquemine Cogeneration Plant · Dow Chemical Co | Power plant (Natural Gas) | 18.6 km | 891 MW | [7] |
| Westlake Plaquemine · Westlake Chemicals & Vinyls LLC | Power plant (Natural Gas) | 22.7 km | 225 MW | [7] |
| Carville Energy LLC · Carville Energy LLC | Power plant (Natural Gas) | 25.4 km | 521 MW | [7] |
| Big Cajun 1 · Louisiana Generating LLC | Power plant (Natural Gas) | 33.5 km | 367 MW | [7] |
| Oxbow Solar 1 · Lightsource Renewable Energy Asset Management, LLC | Power plant (Solar) | 35.5 km | 300 MW | [7] |
| Big Cajun 2 · Louisiana Generating LLC | Power plant (Coal) | 38.8 km | 1.67 GW | [7] |
| River Bend · Entergy Louisiana LLC | Power plant (Nuclear) | 39.6 km | 976 MW | [7] |
| Florida Substation · Entergy | Substation | 0.8 km | 69 kV | [1] |
| Sears Substation · Entergy | Substation | 0.9 km | 69 kV | [1] |
| East Substation · Entergy Louisiana | Substation | 2.66 km | 69 kV | [1] |
| Jefferson Substation · Entergy Louisiana | Substation | 2.76 km | 69 kV | [1] |
| Oak Villa Substation · Entergy | Substation | 2.82 km | 230 kV | [1] |
| Greenwell Springs Substation · Entergy Louisiana | Substation | 2.94 km | 69 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| J2651 at MOLER - COLFEL 230.0kVMISO J2651 | Solar | In study · proposed 2026-05 | 160 MW | [5] |
| J2404 at EASTMISO J2404 | Storage | In study · proposed 2025-11 | 39 MW | [5] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
- Planned capacity
- 3 MW[3]AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Sep 30, 2026.Likely
“Spanning 86,400 sq ft, DartPoints Baton Rouge 1 Data Center delivers 2.5 MW of utility power, 540 tons of N+1 cooling, and robust physical and network security.” — Capacity stated on the operator's facility page (facility capacity). Recorded as design capacity, not as power currently in use.
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
Other buildings on this campus
1- DartPoints Baton Rouge 2Operating
All claims (provenance audit)
16| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | DartPoints Baton Rouge 1node/14124761022 name=DartPoints Baton Rouge 1 | [1] | Likely | 2026-10-12 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-10-12 | Shown |
| Website | https://dartpoints.com/locations/btr01-baton-rouge-la/ | [1] | Likely | 2026-10-12 | Shown |
| Address | 7127 Florida Blvd, Baton Rouge, LA 70806 | [1] | Likely | 2026-10-12 | Shown |
| Operator | DartPointsoperator=DartPoints | [1] | Likely | 2026-10-12 | Shown |
| Utility | Entergyterritory 11241: ENTERGY LOUISIANA LLC (INVESTOR OWNED, ENTERGY CORP) | [2] derived | Unverified | 2022 | Shown |
| Planned capacity | 3 MW | [3] | Likely | 2026-09-30 | Shown |
| ISO / RTO | MISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC.. | [4] derived | Likely | — | Shown |
| Balancing authority | MISO | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Florida Substation (69 kV)way/341728950 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.8 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 69 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 199 MW | [5] derived | Confirmed | 2026-10-12 | Shown |
| State avg. industrial price | 6.08¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 10.97¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 5.95 GW | [7] derived | Confirmed | 202502 | Shown |