DartPoints Baton Rouge 1 is an operating data center in Baton Rouge, Louisiana. Operated or owned by DartPoints. Planned capacity: 3 MW (announced). Verification: announced only. 7 cited sources.

Part of DartPoints — Baton Rouge, LA campus

40% profile completeness
16 claims from 7 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Oct 12, 2026
Follow

Get changes to DartPoints Baton Rouge 1

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “DartPoints Baton Rouge 1.” /facilities/dartpoints-baton-rouge-1-baton-rouge-la. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_dartpoints_baton_rouge_1_baton_rouge_la_2026,
  title = {{DartPoints Baton Rouge 1}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/dartpoints-baton-rouge-1-baton-rouge-la}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
3 MW[3]
AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Sep 30, 2026.Likely
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Energized — operating
Medium confidence
Project verification
Announced only
Only announcements or press coverage found.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Entergy · MISO
Substation: Florida Substation (69 kV) (nearest, unverified)

Power reality

Announced
3 MW[3]AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Sep 30, 2026.
Reported by dartpoints.com
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. AnnouncedSep 30, 2026
    Company announcement
    • Sep 30, 2026 · Planned capacity reported: 2.5 MW[3]
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalOct 12, 2026
    Community map
    • Oct 12, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Company announcement, Community map.

Grid path

  1. facility
    DartPoints Baton Rouge 1 (BTR01)
  2. substation
    Florida Substation (69 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.8 km away. Proximity does not establish that it serves the site.
  3. transmission
    69 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.79 km away). Not confirmed as the supply path.
  4. utility
    Entergy[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    MISO[4]
    Service territoryLikely
    Balancing authority: MISO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for Entergy. Know one? Add a source

Location & imagery

Street address
Coordinates
30.45383, -91.11605
Address
7127 Florida Blvd, Baton Rouge, LA 70806[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
County
East Baton Rouge Parish
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:
Entergy[2]Unverified

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility
Entergy[2]Unverified

Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Dixie Electric Membership Corp.

No tenants or end users identified in our sources yet.

Power (all fields)

Planned capacity
3 MW[3]AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Sep 30, 2026.Likely

“Spanning 86,400 sq ft, DartPoints Baton Rouge 1 Data Center delivers 2.5 MW of utility power, 540 tons of N+1 cooling, and robust physical and network security.” — Capacity stated on the operator's facility page (facility capacity). Recorded as design capacity, not as power currently in use.

Current facility power
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
MISO[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
MISO[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Florida Substation (69 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.8 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
69 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
6.08¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Louisiana statewide average, July 2026.

State avg. commercial price
10.97¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Louisiana statewide average, July 2026.

Generation within 50 km
5.95 GW[7]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

20 EIA-reported plants within 50 km.

Generation queued in county
199 MW[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived

2 active generation interconnection requests in East Baton Rouge Parish: Solar 160 MW, Storage 39 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
69 kV line · EntergyTransmission line0.79 km69 kV[1]
Louisiana 1 · Entergy Louisiana LLCPower plant (Natural Gas)8 km382 MW[7]
Plaquemine Cogeneration Plant · Dow Chemical CoPower plant (Natural Gas)18.6 km891 MW[7]
Westlake Plaquemine · Westlake Chemicals & Vinyls LLCPower plant (Natural Gas)22.7 km225 MW[7]
Carville Energy LLC · Carville Energy LLCPower plant (Natural Gas)25.4 km521 MW[7]
Big Cajun 1 · Louisiana Generating LLCPower plant (Natural Gas)33.5 km367 MW[7]
Oxbow Solar 1 · Lightsource Renewable Energy Asset Management, LLCPower plant (Solar)35.5 km300 MW[7]
Big Cajun 2 · Louisiana Generating LLCPower plant (Coal)38.8 km1.67 GW[7]
River Bend · Entergy Louisiana LLCPower plant (Nuclear)39.6 km976 MW[7]
Florida Substation · EntergySubstation0.8 km69 kV[1]
Sears Substation · EntergySubstation0.9 km69 kV[1]
East Substation · Entergy LouisianaSubstation2.66 km69 kV[1]
Jefferson Substation · Entergy LouisianaSubstation2.76 km69 kV[1]
Oak Villa Substation · EntergySubstation2.82 km230 kV[1]
Greenwell Springs Substation · Entergy LouisianaSubstation2.94 km69 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
J2651 at MOLER - COLFEL 230.0kVMISO J2651SolarIn study · proposed 2026-05160 MW[5]
J2404 at EASTMISO J2404StorageIn study · proposed 2025-1139 MW[5]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —
Planned capacity
3 MW[3]AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Sep 30, 2026.Likely

“Spanning 86,400 sq ft, DartPoints Baton Rouge 1 Data Center delivers 2.5 MW of utility power, 540 tons of N+1 cooling, and robust physical and network security.” — Capacity stated on the operator's facility page (facility capacity). Recorded as design capacity, not as power currently in use.

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

Other buildings on this campus

1

All claims (provenance audit)

16
FieldValueSourceConfidenceAs ofStatus
NameDartPoints Baton Rouge 1node/14124761022 name=DartPoints Baton Rouge 1[1] Likely2026-10-12Shown
StatusOperating[1] derivedUnverified2026-10-12Shown
Websitehttps://dartpoints.com/locations/btr01-baton-rouge-la/[1] Likely2026-10-12Shown
Address7127 Florida Blvd, Baton Rouge, LA 70806[1] Likely2026-10-12Shown
OperatorDartPointsoperator=DartPoints[1] Likely2026-10-12Shown
UtilityEntergyterritory 11241: ENTERGY LOUISIANA LLC (INVESTOR OWNED, ENTERGY CORP)[2] derivedUnverified2022Shown
Planned capacity3 MW[3] Likely2026-09-30Shown
ISO / RTOMISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC..[4] derivedLikely—Shown
Balancing authorityMISO[2] derivedLikely—Shown
Nearest mapped substationFlorida Substation (69 kV)way/341728950[1] derivedLikely2026-09-28Shown
Distance to substation0.8 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby69 kV[1] derivedLikely2026-09-28Shown
Generation queued in county199 MW[5] derivedConfirmed2026-10-12Shown
State avg. industrial price6.08¢/kWh[6] Confirmed2026-07Shown
State avg. commercial price10.97¢/kWh[6] Confirmed2026-07Shown
Generation within 50 km5.95 GW[7] derivedConfirmed202502Shown