Claro data center
Claro data center is an operating data center in Puerto Rico. Operated or owned by Claro. Power capacity has not been disclosed or collected yet. Verification: unverified. 4 cited sources.
Follow
Get changes to Claro data center
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Claro data center.” /facilities/claro-data-center-san-juan-pr. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_claro_data_center_san_juan_pr_2026,
title = {{Claro data center}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/claro-data-center-san-juan-pr}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityClaro data center
- →substationSubestación Tapia[1]Proximity onlyUnverifiedNearest mapped substation, 0.1 km away. Proximity does not establish that it serves the site.
- →transmission115 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (1.67 km away). Not confirmed as the supply path.
- →utilityPuerto Rico Electric Pwr Authority[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for Puerto Rico Electric Pwr Authority. Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 18.44683, -66.05169
- County
- San Juan
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- None (non-RTO region)[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Outside all ISO/RTO footprints; balancing authority shown separately.
- Nearest mapped substation
- Subestación Tapia[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 0.1 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 115 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- Generation within 50 km
- 1.59 GW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
34 EIA-reported plants within 50 km.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 115 kV line · Puerto Rico Electric Power Authority | Transmission line | 1.67 km | 115 kV | [1] |
| Central San Juan Plant · Puerto Rico Electric Pwr Authority | Power plant (Petroleum) | 6 km | 784 MW | [4] |
| Palo Seco Plant · Puerto Rico Electric Pwr Authority | Power plant (Petroleum) | 10.3 km | 479 MW | [4] |
| Lilly Del Caribe Pr01 · Lilly del Caribe | Power plant (Petroleum) | 12.4 km | 30 MW | [4] |
| San Fermin Solar Farm Hybrid · San Fermin Solar Farm LLC | Power plant (Solar) | 16 km | 28 MW | [4] |
| Vega Baja · Puerto Rico Electric Pwr Authority | Power plant (Petroleum) | 35.8 km | 42 MW | [4] |
| Daguao · Puerto Rico Electric Pwr Authority | Power plant (Petroleum) | 47 km | 42 MW | [4] |
| Punta Lima Wind Farm · Punta Lima Wind Farm, LLC | Power plant (Wind) | 47.2 km | 26 MW | [4] |
| Yabucoa · Puerto Rico Electric Pwr Authority | Power plant (Petroleum) | 48.7 km | 42 MW | [4] |
| Subestación Tapia · Puerto Rico Electric Power Authority | Substation | 0.1 km | — | [1] |
| Subestación Seboruco | Substation | 0.58 km | — | [1] |
| Subestación Luis Llorens Torres · Puerto Rico Electric Power Authority | Substation | 0.76 km | — | [1] |
| Subestación Taft 1105 (Distrito San Juan) · PREPA | Substation | 1.06 km | — | [1] |
| Unnamed substation | Substation | 1.52 km | — | [1] |
| Subestación Martín Peña · Puerto Rico Electric Power Authority | Substation | 1.64 km | — | [1] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
- 23,300 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
9| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Status | Operating | [1] derived | Unverified | 2026-10-12 | Shown |
| Operator | Clarooperator=Claro | [1] | Likely | 2026-10-12 | Shown |
| Utility | Puerto Rico Electric Pwr Authorityterritory 15497: PUERTO RICO ELECTRIC PWR AUTHORITY (STATE, PUERTO RICO ELECTRIC | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | None (non-RTO region) | [3] derived | Likely | — | Shown |
| Nearest mapped substation | Subestación Tapiaway/1062653486 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.1 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 115 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation within 50 km | 1.59 GW | [4] derived | Confirmed | 202502 | Shown |
| Building footprint | 23,300 sq ft | [1] derived | Likely | 2026-10-12 | Shown |