Amazon Web Services
Amazon Web Services is an operating hyperscale in Boardman, Oregon. Operated or owned by Amazon Web Services. Power capacity has not been disclosed or collected yet. Verification: unverified. 5 cited sources.
Part of Amazon Web Services — Boardman, OR campus
Follow
Get changes to Amazon Web Services
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Amazon Web Services.” /facilities/amazon-web-services-boardman-or-14. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_amazon_web_services_boardman_or_14_2026,
title = {{Amazon Web Services}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/amazon-web-services-boardman-or-14}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityAmazon Web Services (PDX68)
- →substationUnnamed substation[1]Proximity onlyUnverifiedNearest mapped substation, 0.32 km away. Proximity does not establish that it serves the site.
- →transmissionMcNary-Longhorn (500 kV)[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.3 km away). Not confirmed as the supply path.
- →utilityUmatilla Electric Coop Assn[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for Umatilla Electric Coop Assn. Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 45.84675, -119.60906
- Address
- 75282 Lewis and Clark Drive, Boardman, OR 97818[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
- County
- Morrow County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developer
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Owner
- Operator
- Utility
Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Bonneville Power Administration.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- None (non-RTO region)[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
- BPAT[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Unnamed substation[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 0.3 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 500 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 8.92¢/kWh[4]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Oregon statewide average, July 2026.
- State avg. commercial price
- 10.60¢/kWh[4]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Oregon statewide average, July 2026.
- Generation within 50 km
- 5.06 GW[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
32 EIA-reported plants within 50 km.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 230 kV line | Transmission line | 0.09 km | 230 kV | [1] |
| McNary-Longhorn · Bonneville Power Administration | Transmission line | 0.3 km | 500 kV | [1] |
| McNary-Morrow Flat No 1 · Bonneville Power Administration | Transmission line | 0.34 km | 230 kV | [1] |
| McNary-Morrow Flat No 2 · Bonneville Power Administration | Transmission line | 0.38 km | 230 kV | [1] |
| Coyote Springs-Longhorn · Bonneville Power Administration | Transmission line | 0.61 km | 500 kV | [1] |
| Morrow Flat-Boardman No 1 · Bonneville Power Administration | Transmission line | 0.76 km | 230 kV | [1] |
| Coyote Springs II · Avista Corp | Power plant (Natural Gas) | 5 km | 290 MW | [5] |
| Hermiston Generating Plant · Hermiston Generating Co LP | Power plant (Natural Gas) | 19.1 km | 464 MW | [5] |
| Carty Generating Station · Portland General Electric Co | Power plant (Natural Gas) | 22.8 km | 416 MW | [5] |
| Hermiston Power Partnership · Hermiston Power Partnership | Power plant (Natural Gas) | 23.7 km | 629 MW | [5] |
| Mcnary · USACE Northwestern Division | Power plant (Hydroelectric) | 26.2 km | 967 MW | [5] |
| Wheatridge Hybrid · Wheatridge Wind Holdings, LLC | Power plant (Wind) | 32 km | 280 MW | [5] |
| South Hurlburt Wind LLC · Caithness Shepherds Flat LLC | Power plant (Wind) | 39.7 km | 290 MW | [5] |
| Horseshoe Bend Wind LLC · Caithness Shepherds Flat LLC | Power plant (Wind) | 42.5 km | 290 MW | [5] |
| Unnamed substation | Substation | 0.32 km | — | [1] |
| Unnamed substation | Substation | 0.44 km | 115 kV | [1] |
| Longhorn · Bonneville Power Administration | Substation | 0.55 km | 500 kV | [1] |
| Morrow Flat Substation · Bonneville Power Administration | Substation | 0.89 km | 230 kV | [1] |
| Unnamed substation | Substation | 1.29 km | 230 kV | [1] |
| Unnamed substation | Substation | 1.49 km | 230 kV | [1] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
- 221,500 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
Other buildings on this campus
11- Amazon Web ServicesOperating · 267,400 sq ft footprint
- Amazon Web ServicesOperating · 103,200 sq ft footprint
- Amazon Web ServicesOperating · 263,600 sq ft footprint
- Amazon Web ServicesOperating · 214,000 sq ft footprint
- Amazon Web ServicesOperating · 210,300 sq ft footprint
- Amazon Web ServicesOperating · 220,000 sq ft footprint
- Amazon Web ServicesOperating · 213,700 sq ft footprint
- Amazon Web ServicesOperating · 211,900 sq ft footprint
- Amazon Web ServicesOperating · 211,900 sq ft footprint
- Amazon Web ServicesOperating · 211,900 sq ft footprint
- Amazon Web ServicesOperating · 17,500 sq ft footprint
All claims (provenance audit)
16| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Amazon Web Servicesway/1027471510 name=Amazon Web Services | [1] | Likely | 2026-10-12 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-10-12 | Shown |
| Facility type | Hyperscale | [1] derived | Unverified | 2026-10-12 | Shown |
| Address | 75282 Lewis and Clark Drive, Boardman, OR 97818 | [1] | Likely | 2026-10-12 | Shown |
| Owner | Amazon Web Servicesowner=Vadata Inc | [1] | Likely | 2026-10-12 | Shown |
| Operator | Amazon Web Servicesoperator=Amazon Web Services | [1] | Likely | 2026-10-12 | Shown |
| Utility | Umatilla Electric Coop Assnterritory 19325: UMATILLA ELECTRIC COOP ASSN (COOPERATIVE, UMATILLA ELECTRIC COO | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | None (non-RTO region) | [3] derived | Likely | — | Shown |
| Balancing authority | BPAT | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substationway/926048787 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.3 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 500 kV | [1] derived | Likely | 2026-09-28 | Shown |
| State avg. industrial price | 8.92¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 10.60¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 5.06 GW | [5] derived | Confirmed | 202502 | Shown |
| Building footprint | 221,500 sq ft | [1] derived | Likely | 2026-10-12 | Shown |