DC
/

Tucson Electric Power

What changed

Utility / energy · also matched as Tucson Electric Power CO, TEP

Tucson Electric Power is linked to 2 tracked US data centers in 1 state as owner, operator, developer, tenant, utility or other party. None of its linked facilities disclose power yet. Every relationship cites its source.

View on map →
Follow

Get changes to Tucson Electric Power

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Tucson Electric Power: US data center footprint.” /companies/tep. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_tep_2026,
  title = {{Tucson Electric Power: US data center footprint}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/companies/tep}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Linked facilities
2
States
1
Reported power online (floor)
—
Reported planned capacity (floor)
—
This company's facilities:Download CSVJSONAPI docs

Floors, not totals: power sums only facilities with a reported or estimated figure (0 of 2), across all roles (a company can be tenant at one site and owner at another). “—” means not disclosed or not yet collected.

Loading map…

US footprint by state

Relationship graph

Derived from the ownership → operation → tenancy → workload chain at each shared facility, plus company-to-company relationships extracted from cited documents. Speculative links are excluded.

Supplies power to

  • DirecTV1 site · Unverified
    DirecTV data center — 9608 East Old Vail Road
FacilityRoleLocationStatusPower
Beale Infrastructure TucsonUtility Tucson, AZUnknown—
DirecTV data center — 9608 East Old Vail RoadUtility UnverifiedTucson, AZOperating—