{"data":[{"facilityId":"epoch-meta-kuna","slug":"meta-kuna-ada-county-id","name":"Meta Kuna","state":"ID","county":"Ada County","orgIds":["meta","idaho-power"],"iso":"None (non-RTO region)","utilities":["idaho-power"],"id":"epoch-meta-kuna:size.buildings_operational:epoch-ai-data-centers:2026-06-01","date":"2026-06-01","kind":"value","field":"size.buildings_operational","before":0,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 2","url":"https://datacenters.prithvidixit.com/facilities/meta-kuna-ada-county-id","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-kuna","slug":"meta-kuna-ada-county-id","name":"Meta Kuna","state":"ID","county":"Ada County","orgIds":["meta","idaho-power"],"iso":"None (non-RTO region)","utilities":["idaho-power"],"id":"epoch-meta-kuna:status:epoch-ai-data-centers:2026-06-01","date":"2026-06-01","kind":"value","field":"status","before":"under_construction","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-kuna-ada-county-id","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-kuna","slug":"meta-kuna-ada-county-id","name":"Meta Kuna","state":"ID","county":"Ada County","orgIds":["meta","idaho-power"],"iso":"None (non-RTO region)","utilities":["idaho-power"],"id":"epoch-meta-kuna:phase_operational:2026-06-01:epoch-ai-data-centers","date":"2026-06-01","kind":"milestone","milestone":"phase_operational","description":"Building 1 and 2 are operational. The 2nd phase of an offsetting solar array goes online on May 31, 2026.  Idaho Public Utilities Comission's approval for this start date notes that \"[Meta]’s load is expected to increase so much that it will suffer a capacity deficit in June 2026 if served only by Pleasant Valley Solar 1.1,” A redacted table in the staff comments document suggests the data center's load will continue to increase through August, when it presumably reaches the maximum capacity of both buildings.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 and 2 are operational. The 2nd phase of an offsetting solar array goes online on May 31, 2026. Idaho Public Utilities Comission's approval for this start date notes that \"[Meta]’s load is expected to increa…","url":"https://datacenters.prithvidixit.com/facilities/meta-kuna-ada-county-id","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}}],"meta":{"total":3,"limit":100,"offset":0,"dataAsOf":"2026-10-12"},"attribution":{"license":"Open Database License (ODbL) 1.0 for the compiled database; individual sources keep their own terms (see sources[].license).","credit":["© OpenStreetMap contributors (ODbL 1.0) — https://www.openstreetmap.org/copyright","Epoch AI, 'AI data centers'. Published online at epoch.ai. Retrieved from 'https://epoch.ai/data/ai-data-centers' (CC BY 4.0)","Datacenter Source — https://datacenters.prithvidixit.com"],"terms":"/api#license","note":"Every figure links to its source. MW totals are floors (most facilities don't disclose power). Evidence levels: confirmed / announced / estimated — see /sources#evidence-levels."}}