{"data":[{"facilityId":"osm-way-1490401523","slug":"argo-data-center-dickens-county-tx","name":"Argo Data Center","state":"TX","county":"Dickens County","orgIds":["south-plains-electric-coop-inc"],"iso":"ERCOT","utilities":["south-plains-electric-coop-inc"],"id":"osm-way-1490401523:status:osm:2026-10-12","date":"2026-10-12","kind":"value","field":"status","before":"operating","after":"under_construction","sourceId":"osm","evidenceLevel":"estimated","text":"Status: Operating → Under construction","url":"https://datacenters.prithvidixit.com/facilities/argo-data-center-dickens-county-tx","source":{"id":"osm","title":"OpenStreetMap — features tagged telecom=data_center or building=data_center","publisher":"OpenStreetMap contributors","url":"https://www.openstreetmap.org/copyright","license":"ODbL 1.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:power.it_mw:epoch-ai-data-centers:2026-09-30","date":"2026-09-30","kind":"value","field":"power.it_mw","before":152,"after":178,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 152 MW → 178 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:power.facility_mw:epoch-ai-data-centers:2026-09-30","date":"2026-09-30","kind":"value","field":"power.facility_mw","before":198,"after":231,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 198 MW → 231 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:compute.h100e:epoch-ai-data-centers:2026-09-30","date":"2026-09-30","kind":"value","field":"compute.h100e","before":173200,"after":202500,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Compute (H100-equivalents): 173,200 → 202,500","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:re.capex_usd_b:epoch-ai-data-centers:2026-09-30","date":"2026-09-30","kind":"value","field":"re.capex_usd_b","before":5.8,"after":6.7,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Capital cost / investment: $5.8B → $6.7B","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:size.buildings_operational:epoch-ai-data-centers:2026-09-30","date":"2026-09-30","kind":"value","field":"size.buildings_operational","before":2,"after":3,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 2 → 3","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:status:epoch-ai-data-centers:2026-09-30","date":"2026-09-30","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:phase_operational:2026-09-30:epoch-ai-data-centers","date":"2026-09-30","kind":"milestone","milestone":"phase_operational","description":"Building 3 is operational. Based on the stated completion date in this [regulatory filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026008019)","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 3 is operational. Based on the stated completion date in this regulatory filing","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-helios","slug":"coreweave-helios-afton-tx","name":"Coreweave Helios","state":"TX","county":"Dickens County","orgIds":["coreweave","openai","south-plains-electric-coop-inc","galaxy-digital-inc"],"iso":"ERCOT","utilities":["south-plains-electric-coop-inc"],"id":"epoch-coreweave-helios:size.buildings_operational:epoch-ai-data-centers:2026-08-30","date":"2026-08-30","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/coreweave-helios-afton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-helios","slug":"coreweave-helios-afton-tx","name":"Coreweave Helios","state":"TX","county":"Dickens County","orgIds":["coreweave","openai","south-plains-electric-coop-inc","galaxy-digital-inc"],"iso":"ERCOT","utilities":["south-plains-electric-coop-inc"],"id":"epoch-coreweave-helios:status:epoch-ai-data-centers:2026-08-30","date":"2026-08-30","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/coreweave-helios-afton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-helios","slug":"coreweave-helios-afton-tx","name":"Coreweave Helios","state":"TX","county":"Dickens County","orgIds":["coreweave","openai","south-plains-electric-coop-inc","galaxy-digital-inc"],"iso":"ERCOT","utilities":["south-plains-electric-coop-inc"],"id":"epoch-coreweave-helios:phase_operational:2026-08-30:epoch-ai-data-centers","date":"2026-08-30","kind":"milestone","milestone":"phase_operational","description":"Building 1 operational at full capacity. This is based on \"Phase I\", which is [expected](https://investor.galaxy.com/news/news-details/2025/Galaxy-Announces-Third-Quarter-2025-Financial-Results/default.aspx) to be operational by the end of the first half of 2026. We added two months of overhead to account for remaining construction and/or installation of CoreWeave's chips, since the June 17 image still showed active minor construction around the building.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 operational at full capacity. This is based on \"Phase I\", which is expected to be operational by the end of the first half of 2026. We added two months of overhead to account for remaining construction and/…","url":"https://datacenters.prithvidixit.com/facilities/coreweave-helios-afton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:power.it_mw:epoch-ai-data-centers:2026-07-03","date":"2026-07-03","kind":"value","field":"power.it_mw","before":131,"after":262,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 131 MW → 262 MW","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:power.facility_mw:epoch-ai-data-centers:2026-07-03","date":"2026-07-03","kind":"value","field":"power.facility_mw","before":183,"after":367,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 183 MW → 367 MW","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:size.buildings_operational:epoch-ai-data-centers:2026-07-03","date":"2026-07-03","kind":"value","field":"size.buildings_operational","before":4,"after":7,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 4 → 7","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:phase_operational:2026-07-03:epoch-ai-data-centers","date":"2026-07-03","kind":"milestone","milestone":"phase_operational","description":"Buildings 1-7 are operational and running, with no construction work visible. This is based on both satellite imagery, and the [Q2 2026 Earnings call](https://d1io3yog0oux5.cloudfront.net/_68280da94b2098ec46fcbe3f4628ea40/corescientific/db/1066/11282/pdf/Q2+FY26+earnings+deck+7.28+AM.pdf) stating the campus was operational by midyear 2026.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Buildings 1-7 are operational and running, with no construction work visible. This is based on both satellite imagery, and the Q2 2026 Earnings call stating the campus was operational by midyear 2026.","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-midlothian","slug":"google-midlothian-midlothian-tx","name":"Google Midlothian","state":"TX","county":"Ellis County","orgIds":["google","sharka-llc","united-electric-coop-service-inc-tx"],"iso":"ERCOT","utilities":["united-electric-coop-service-inc-tx"],"id":"epoch-google-midlothian:power.it_mw:epoch-ai-data-centers:2026-07-01","date":"2026-07-01","kind":"value","field":"power.it_mw","before":69,"after":103,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 69 MW → 103 MW","url":"https://datacenters.prithvidixit.com/facilities/google-midlothian-midlothian-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-midlothian","slug":"google-midlothian-midlothian-tx","name":"Google Midlothian","state":"TX","county":"Ellis County","orgIds":["google","sharka-llc","united-electric-coop-service-inc-tx"],"iso":"ERCOT","utilities":["united-electric-coop-service-inc-tx"],"id":"epoch-google-midlothian:power.facility_mw:epoch-ai-data-centers:2026-07-01","date":"2026-07-01","kind":"value","field":"power.facility_mw","before":82,"after":123,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 82 MW → 123 MW","url":"https://datacenters.prithvidixit.com/facilities/google-midlothian-midlothian-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-midlothian","slug":"google-midlothian-midlothian-tx","name":"Google Midlothian","state":"TX","county":"Ellis County","orgIds":["google","sharka-llc","united-electric-coop-service-inc-tx"],"iso":"ERCOT","utilities":["united-electric-coop-service-inc-tx"],"id":"epoch-google-midlothian:status:epoch-ai-data-centers:2026-07-01","date":"2026-07-01","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/google-midlothian-midlothian-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:power.it_mw:epoch-ai-data-centers:2026-05-23","date":"2026-05-23","kind":"value","field":"power.it_mw","before":211,"after":421,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 211 MW → 421 MW","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:power.facility_mw:epoch-ai-data-centers:2026-05-23","date":"2026-05-23","kind":"value","field":"power.facility_mw","before":295,"after":590,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 295 MW → 590 MW","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:size.buildings_operational:epoch-ai-data-centers:2026-05-23","date":"2026-05-23","kind":"value","field":"size.buildings_operational","before":2,"after":4,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 2 → 4","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:phase_operational:2026-05-23:epoch-ai-data-centers","date":"2026-05-23","kind":"milestone","milestone":"phase_operational","description":"Buildings 3 and 4 are estimated to be operational. On April 22nd, Oracle [posted](https://x.com/i/status/2047012589302153558) that \"In Abilene, 200MW is already operational\". This suggests that there was still only Building 1 and 2 operational. Since Buildings 3 and 4 looked complete from the outside on March 24th, we give it another month after Oracle's post for them to be operational. This would also give the buildings a similar 1 year 4 months timeline that Buildings 1 took from land clearing to being operational.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Buildings 3 and 4 are estimated to be operational. On April 22nd, Oracle posted that \"In Abilene, 200MW is already operational\". This suggests that there was still only Building 1 and 2 operational. Since Buildings 3 …","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-midlothian","slug":"google-midlothian-midlothian-tx","name":"Google Midlothian","state":"TX","county":"Ellis County","orgIds":["google","sharka-llc","united-electric-coop-service-inc-tx"],"iso":"ERCOT","utilities":["united-electric-coop-service-inc-tx"],"id":"epoch-google-midlothian:size.buildings_operational:epoch-ai-data-centers:2026-04-19","date":"2026-04-19","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/google-midlothian-midlothian-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-midlothian","slug":"google-midlothian-midlothian-tx","name":"Google Midlothian","state":"TX","county":"Ellis County","orgIds":["google","sharka-llc","united-electric-coop-service-inc-tx"],"iso":"ERCOT","utilities":["united-electric-coop-service-inc-tx"],"id":"epoch-google-midlothian:status:epoch-ai-data-centers:2026-04-19","date":"2026-04-19","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/google-midlothian-midlothian-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-midlothian","slug":"google-midlothian-midlothian-tx","name":"Google Midlothian","state":"TX","county":"Ellis County","orgIds":["google","sharka-llc","united-electric-coop-service-inc-tx"],"iso":"ERCOT","utilities":["united-electric-coop-service-inc-tx"],"id":"epoch-google-midlothian:phase_operational:2026-04-19:epoch-ai-data-centers","date":"2026-04-19","kind":"milestone","milestone":"phase_operational","description":"Building 1 is probably mostly operational despite some cooling towers yet to be installed. In the original building permit Google only expected to build 6 new cooling towers, but they've extended the row further. This might be to support new chips with denser power configurations. Across the road, you can see the beginnings of land development for what is likely an expansion of the site, but we don't have any details on it yet.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 is probably mostly operational despite some cooling towers yet to be installed. In the original building permit Google only expected to build 6 new cooling towers, but they've extended the row further. This…","url":"https://datacenters.prithvidixit.com/facilities/google-midlothian-midlothian-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-sat14","slug":"microsoft-sat14-san-antonio-tx","name":"Microsoft SAT14","state":"TX","county":"Bexar County","orgIds":["microsoft","cps-energy"],"iso":"ERCOT","utilities":["cps-energy"],"id":"epoch-microsoft-sat14:power.it_mw:epoch-ai-data-centers:2026-03-31","date":"2026-03-31","kind":"value","field":"power.it_mw","before":19,"after":47,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 19 MW → 47 MW","url":"https://datacenters.prithvidixit.com/facilities/microsoft-sat14-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-sat14","slug":"microsoft-sat14-san-antonio-tx","name":"Microsoft SAT14","state":"TX","county":"Bexar County","orgIds":["microsoft","cps-energy"],"iso":"ERCOT","utilities":["cps-energy"],"id":"epoch-microsoft-sat14:power.facility_mw:epoch-ai-data-centers:2026-03-31","date":"2026-03-31","kind":"value","field":"power.facility_mw","before":26,"after":66,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 26 MW → 66 MW","url":"https://datacenters.prithvidixit.com/facilities/microsoft-sat14-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-sat14","slug":"microsoft-sat14-san-antonio-tx","name":"Microsoft SAT14","state":"TX","county":"Bexar County","orgIds":["microsoft","cps-energy"],"iso":"ERCOT","utilities":["cps-energy"],"id":"epoch-microsoft-sat14:size.buildings_operational:epoch-ai-data-centers:2026-03-31","date":"2026-03-31","kind":"value","field":"size.buildings_operational","before":1,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 2","url":"https://datacenters.prithvidixit.com/facilities/microsoft-sat14-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-sat14","slug":"microsoft-sat14-san-antonio-tx","name":"Microsoft SAT14","state":"TX","county":"Bexar County","orgIds":["microsoft","cps-energy"],"iso":"ERCOT","utilities":["cps-energy"],"id":"epoch-microsoft-sat14:status:epoch-ai-data-centers:2026-03-31","date":"2026-03-31","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/microsoft-sat14-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-sat14","slug":"microsoft-sat14-san-antonio-tx","name":"Microsoft SAT14","state":"TX","county":"Bexar County","orgIds":["microsoft","cps-energy"],"iso":"ERCOT","utilities":["cps-energy"],"id":"epoch-microsoft-sat14:phase_operational:2026-03-31:epoch-ai-data-centers","date":"2026-03-31","kind":"milestone","milestone":"phase_operational","description":"Building 2 fully operational, Building 1 expanded. Construction is already visibly complete. Additionally, construction phases [Phase 2](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019471), [Phase 3](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019588), and [Phase 4](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019686) on TDLR that collectively represent the completion of the site have a completion date of 2026-03-31.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 2 fully operational, Building 1 expanded. Construction is already visibly complete. Additionally, construction phases Phase 2, Phase 3, and Phase 4 on TDLR that collectively represent the completion of the si…","url":"https://datacenters.prithvidixit.com/facilities/microsoft-sat14-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:power.it_mw:epoch-ai-data-centers:2026-02-23","date":"2026-02-23","kind":"value","field":"power.it_mw","before":67,"after":131,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 67 MW → 131 MW","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:power.facility_mw:epoch-ai-data-centers:2026-02-23","date":"2026-02-23","kind":"value","field":"power.facility_mw","before":94,"after":183,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 94 MW → 183 MW","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:size.buildings_operational:epoch-ai-data-centers:2026-02-23","date":"2026-02-23","kind":"value","field":"size.buildings_operational","before":3,"after":4,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 3 → 4","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:phase_operational:2026-02-23:epoch-ai-data-centers","date":"2026-02-23","kind":"milestone","milestone":"phase_operational","description":"Buildings 1-3 (Denton North) are largely built out/operational, and Denton South has its first data hall plus support equipment substantially installed. Remaining Denton South buildings (4-7) still under construction. This is according to satellite imagery.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Buildings 1-3 (Denton North) are largely built out/operational, and Denton South has its first data hall plus support equipment substantially installed. Remaining Denton South buildings (4-7) still under construction.…","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-vantage-tx1","slug":"vantage-tx1-san-antonio-tx","name":"Vantage TX1","state":"TX","county":"Bexar County","orgIds":["pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-vantage-tx1:size.buildings_operational:epoch-ai-data-centers:2026-02-15","date":"2026-02-15","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/vantage-tx1-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-vantage-tx1","slug":"vantage-tx1-san-antonio-tx","name":"Vantage TX1","state":"TX","county":"Bexar County","orgIds":["pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-vantage-tx1:status:epoch-ai-data-centers:2026-02-15","date":"2026-02-15","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/vantage-tx1-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-vantage-tx1","slug":"vantage-tx1-san-antonio-tx","name":"Vantage TX1","state":"TX","county":"Bexar County","orgIds":["pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-vantage-tx1:phase_operational:2026-02-15:epoch-ai-data-centers","date":"2026-02-15","kind":"milestone","milestone":"phase_operational","description":"Building 1 operational; Roads around Building 1 complete, all cooling and side generator equipment construction has since finished as well. Although this is still earlier than the completion date reported on TDLR, based on the appearance, we believe it is operational. Reported IT power of 32 MW. [Source](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2024007561)","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 operational; Roads around Building 1 complete, all cooling and side generator equipment construction has since finished as well. Although this is still earlier than the completion date reported on TDLR, bas…","url":"https://datacenters.prithvidixit.com/facilities/vantage-tx1-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-sat40","slug":"microsoft-sat40-san-antonio-tx","name":"Microsoft SAT40","state":"TX","county":"Bexar County","orgIds":["microsoft","medina-electric-coop-inc"],"iso":"ERCOT","utilities":["medina-electric-coop-inc"],"id":"epoch-microsoft-sat40:status:epoch-ai-data-centers:2026-02-04","date":"2026-02-04","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/microsoft-sat40-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:power.it_mw:epoch-ai-data-centers:2025-12-31","date":"2025-12-31","kind":"value","field":"power.it_mw","before":8,"after":67,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 8 MW → 67 MW","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:power.facility_mw:epoch-ai-data-centers:2025-12-31","date":"2025-12-31","kind":"value","field":"power.facility_mw","before":11,"after":94,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 11 MW → 94 MW","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:size.buildings_operational:epoch-ai-data-centers:2025-12-31","date":"2025-12-31","kind":"value","field":"size.buildings_operational","before":1,"after":3,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 3","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:phase_operational:2025-12-31:epoch-ai-data-centers","date":"2025-12-31","kind":"milestone","milestone":"phase_operational","description":"Half the campus energized. 67 billable MW [are now dedicated](https://d1io3yog0oux5.cloudfront.net/_68280da94b2098ec46fcbe3f4628ea40/corescientific/db/1085/11265/presentation/Q4+FY25+earnings+deck+vfinal.2+PDF.pdf) to CoreWeave's GPUs across three buildings.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Half the campus energized. 67 billable MW are now dedicated to CoreWeave's GPUs across three buildings.","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:power.it_mw:epoch-ai-data-centers:2025-12-24","date":"2025-12-24","kind":"value","field":"power.it_mw","before":105,"after":211,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 105 MW → 211 MW","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:power.facility_mw:epoch-ai-data-centers:2025-12-24","date":"2025-12-24","kind":"value","field":"power.facility_mw","before":147,"after":295,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 147 MW → 295 MW","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:size.buildings_operational:epoch-ai-data-centers:2025-12-24","date":"2025-12-24","kind":"value","field":"size.buildings_operational","before":1,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 2","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:phase_operational:2025-12-24:epoch-ai-data-centers","date":"2025-12-24","kind":"milestone","milestone":"phase_operational","description":"Building 2 is fully operational. This exact date corresponds to the expected completion date of \"Four (4) data hall spaces and an administrative office build-out\" according to a [TDLR filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025007742), but this date is also consistent with satellite imagery. By January 15, Building 2 looked as finished as Building 1, whereas on September 26 it did not look finished.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 2 is fully operational. This exact date corresponds to the expected completion date of \"Four (4) data hall spaces and an administrative office build-out\" according to a TDLR filing, but this date is also cons…","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:size.buildings_operational:epoch-ai-data-centers:2025-12-09","date":"2025-12-09","kind":"value","field":"size.buildings_operational","before":0,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 2","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:status:epoch-ai-data-centers:2025-12-09","date":"2025-12-09","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:phase_operational:2025-12-09:epoch-ai-data-centers","date":"2025-12-09","kind":"milestone","milestone":"phase_operational","description":"Building 1 and 2 are operational. Activity related to the air quality permit (namely, emergency diesel generators) was reported to have started as of 2025-12-09. This is our best estimate, but note that the planned completion date in this [regulatory filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2022017728) is 2026-03-01.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 and 2 are operational. Activity related to the air quality permit (namely, emergency diesel generators) was reported to have started as of 2025-12-09. This is our best estimate, but note that the planned co…","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-sat40","slug":"microsoft-sat40-san-antonio-tx","name":"Microsoft SAT40","state":"TX","county":"Bexar County","orgIds":["microsoft","medina-electric-coop-inc"],"iso":"ERCOT","utilities":["medina-electric-coop-inc"],"id":"epoch-microsoft-sat40:power.it_mw:epoch-ai-data-centers:2025-12-01","date":"2025-12-01","kind":"value","field":"power.it_mw","before":47,"after":75,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 47 MW → 75 MW","url":"https://datacenters.prithvidixit.com/facilities/microsoft-sat40-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-sat40","slug":"microsoft-sat40-san-antonio-tx","name":"Microsoft SAT40","state":"TX","county":"Bexar County","orgIds":["microsoft","medina-electric-coop-inc"],"iso":"ERCOT","utilities":["medina-electric-coop-inc"],"id":"epoch-microsoft-sat40:power.facility_mw:epoch-ai-data-centers:2025-12-01","date":"2025-12-01","kind":"value","field":"power.facility_mw","before":66,"after":106,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 66 MW → 106 MW","url":"https://datacenters.prithvidixit.com/facilities/microsoft-sat40-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-sat40","slug":"microsoft-sat40-san-antonio-tx","name":"Microsoft SAT40","state":"TX","county":"Bexar County","orgIds":["microsoft","medina-electric-coop-inc"],"iso":"ERCOT","utilities":["medina-electric-coop-inc"],"id":"epoch-microsoft-sat40:size.buildings_operational:epoch-ai-data-centers:2025-12-01","date":"2025-12-01","kind":"value","field":"size.buildings_operational","before":1,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 2","url":"https://datacenters.prithvidixit.com/facilities/microsoft-sat40-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-sat40","slug":"microsoft-sat40-san-antonio-tx","name":"Microsoft SAT40","state":"TX","county":"Bexar County","orgIds":["microsoft","medina-electric-coop-inc"],"iso":"ERCOT","utilities":["medina-electric-coop-inc"],"id":"epoch-microsoft-sat40:phase_operational:2025-12-01:epoch-ai-data-centers","date":"2025-12-01","kind":"milestone","milestone":"phase_operational","description":"Building 2 operational. No more construction on building, and surrounding roads are also complete.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 2 operational. No more construction on building, and surrounding roads are also complete.","url":"https://datacenters.prithvidixit.com/facilities/microsoft-sat40-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-crusoe-abilene-expansion","slug":"crusoe-abilene-expansion-abilene-tx","name":"Crusoe Abilene Expansion","state":"TX","county":"Taylor County","orgIds":["microsoft","nvidia","taylor-electric-coop-inc-tx"],"iso":"ERCOT","utilities":["taylor-electric-coop-inc-tx"],"id":"epoch-crusoe-abilene-expansion:construction_start:2025-11-02:epoch-ai-data-centers","date":"2025-11-02","kind":"milestone","milestone":"construction_start","description":"Land clearing begins for Buildings 1-2.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Land clearing begins for Buildings 1-2.","url":"https://datacenters.prithvidixit.com/facilities/crusoe-abilene-expansion-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-openai-stargate-milam","slug":"openai-stargate-milam-milam-county-tx","name":"OpenAI Stargate Milam","state":"TX","county":"Milam County","orgIds":["softbank","openai","bluebonnet-electric-coop-inc"],"iso":"ERCOT","utilities":["bluebonnet-electric-coop-inc"],"id":"epoch-openai-stargate-milam:construction_start:2025-09-27:epoch-ai-data-centers","date":"2025-09-27","kind":"milestone","milestone":"construction_start","description":"Land clearing begins for the site","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Land clearing begins for the site","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-milam-milam-county-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:size.buildings_operational:epoch-ai-data-centers:2025-09-26","date":"2025-09-26","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:status:epoch-ai-data-centers:2025-09-26","date":"2025-09-26","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:phase_operational:2025-09-26:epoch-ai-data-centers","date":"2025-09-26","kind":"milestone","milestone":"phase_operational","description":"Building 1 is fully operational around this date. The first phase was \"live\" on September 30 according a Crusoe [announcement](https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live). While the first phase consists of Building 1 and 2, the language doesn't outright confirm that both buildings are fully operational. The announcement also stated that \"Oracle began delivering the first NVIDIA GB200 racks in June\", and we think 3 months is enough time to ram to 50,000 GB200s in Building 1. The satellite image also suggests that Building 1 is complete (shell and equipment done, many cars neatly parked) while Building 2 is ongoing (trucks and construction equipment still present). The 200 MW [substation](https://www.mortenson.com/projects/abilene-data-center-development) built in 2022 and expanded in 2024 is enough to power both buildings. To the right of Building 2, five gas turbines are in place with five more turbines still under construction. Chillers are partly installed for Building 3. Roof is complete for Building 4. The larger 1 GW substation is not complete yet.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 is fully operational around this date. The first phase was \"live\" on September 30 according a Crusoe announcement. While the first phase consists of Building 1 and 2, the language doesn't outright confirm t…","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-anthropic-barber-lake","slug":"anthropic-barber-lake-mitchell-county-tx","name":"Anthropic Barber Lake","state":"TX","county":"Mitchell County","orgIds":["cipher-mining","anthropic","taylor-electric-coop-inc-tx"],"iso":"ERCOT","utilities":["taylor-electric-coop-inc-tx"],"id":"epoch-anthropic-barber-lake:construction_start:2025-09-18:epoch-ai-data-centers","date":"2025-09-18","kind":"milestone","milestone":"construction_start","description":"Site grading and civil works begin.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Site grading and civil works begin.","url":"https://datacenters.prithvidixit.com/facilities/anthropic-barber-lake-mitchell-county-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-red-oak","slug":"google-red-oak-red-oak-tx","name":"Google Red Oak","state":"TX","county":"Ellis County","orgIds":["google","alamo-mission-llc","united-electric-coop-service-inc-tx"],"iso":"ERCOT","utilities":["united-electric-coop-service-inc-tx"],"id":"epoch-google-red-oak:size.buildings_operational:epoch-ai-data-centers:2025-08-25","date":"2025-08-25","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/google-red-oak-red-oak-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-red-oak","slug":"google-red-oak-red-oak-tx","name":"Google Red Oak","state":"TX","county":"Ellis County","orgIds":["google","alamo-mission-llc","united-electric-coop-service-inc-tx"],"iso":"ERCOT","utilities":["united-electric-coop-service-inc-tx"],"id":"epoch-google-red-oak:status:epoch-ai-data-centers:2025-08-25","date":"2025-08-25","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/google-red-oak-red-oak-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-red-oak","slug":"google-red-oak-red-oak-tx","name":"Google Red Oak","state":"TX","county":"Ellis County","orgIds":["google","alamo-mission-llc","united-electric-coop-service-inc-tx"],"iso":"ERCOT","utilities":["united-electric-coop-service-inc-tx"],"id":"epoch-google-red-oak:phase_operational:2025-08-25:epoch-ai-data-centers","date":"2025-08-25","kind":"milestone","milestone":"phase_operational","description":"Building 1 is operational, based on a Google Earth [image](https://earth.google.com/web/@32.53855187,-96.7936939,182.71625265a,4648.56607908d,30.00094375y,3.66969189h,0t,0r/) showing a completed building shell and equipment, and the large construction car park being emptied. Building 2 shell looks mostly completed.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 is operational, based on a Google Earth image showing a completed building shell and equipment, and the large construction car park being emptied. Building 2 shell looks mostly completed.","url":"https://datacenters.prithvidixit.com/facilities/google-red-oak-red-oak-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-openai-stargate-shackelford","slug":"openai-stargate-shackelford-abilene-tx","name":"OpenAI Stargate Shackelford","state":"TX","county":"Shackelford County","orgIds":["oracle","openai","taylor-electric-coop-inc-tx","vantage"],"iso":"ERCOT","utilities":["taylor-electric-coop-inc-tx"],"id":"epoch-openai-stargate-shackelford:construction_start:2025-08-01:epoch-ai-data-centers","date":"2025-08-01","kind":"milestone","milestone":"construction_start","description":"Land clearing begins.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Land clearing begins.","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-shackelford-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:size.buildings_operational:epoch-ai-data-centers:2025-05-31","date":"2025-05-31","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:status:epoch-ai-data-centers:2025-05-31","date":"2025-05-31","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:phase_operational:2025-05-31:epoch-ai-data-centers","date":"2025-05-31","kind":"milestone","milestone":"phase_operational","description":"First 8 MW billable tranche dedicated to AI [starts running at the site](https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001628280-25-023161/q12025corescientificinc-ea.htm), with another 40 scheduled by the end of the quarter.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: First 8 MW billable tranche dedicated to AI starts running at the site, with another 40 scheduled by the end of the quarter.","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-helios","slug":"coreweave-helios-afton-tx","name":"Coreweave Helios","state":"TX","county":"Dickens County","orgIds":["coreweave","openai","south-plains-electric-coop-inc","galaxy-digital-inc"],"iso":"ERCOT","utilities":["south-plains-electric-coop-inc"],"id":"epoch-coreweave-helios:construction_start:2025-05-31:epoch-ai-data-centers","date":"2025-05-31","kind":"milestone","milestone":"construction_start","description":"The former [crypto mining](https://web.archive.org/web/20250423225644/https://investor.galaxy.com/news/news-details/2025/Galaxy-Announces-Commitment-with-CoreWeave-to-Host-Additional-Artificial-Intelligence-and-High-Performance-Computing-Infrastructure-at-Helios-Data-Center-Campus/default.aspx) Helios site begins converting the first building and expanding, with land cleared for additional buildings.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: The former crypto mining Helios site begins converting the first building and expanding, with land cleared for additional buildings.","url":"https://datacenters.prithvidixit.com/facilities/coreweave-helios-afton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-goodnight","slug":"goodnight-claude-tx","name":"Goodnight","state":"TX","county":"Armstrong County","orgIds":["google","google-deepmind","crusoe","hoffman","serena","southwestern-public-service-co"],"iso":"SPP","utilities":["southwestern-public-service-co"],"id":"epoch-goodnight:construction_start:2025-05-19:epoch-ai-data-centers","date":"2025-05-19","kind":"milestone","milestone":"construction_start","description":"Land clearing begins","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Land clearing begins","url":"https://datacenters.prithvidixit.com/facilities/goodnight-claude-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:construction_start:2024-11-01:epoch-ai-data-centers","date":"2024-11-01","kind":"milestone","milestone":"construction_start","description":"Construction start - The [Texas Department of Licensing and Regulation](https://www.tdlr.texas.gov/TABS/Search/Print/TABS2025005706) reports Core Scientific is converting existing Bitcoin mining buildings into AI data centers, planning to build AROUND the existing Denton Energy Center.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Construction start - The Texas Department of Licensing and Regulation reports Core Scientific is converting existing Bitcoin mining buildings into AI data centers, planning to build AROUND the existing Denton Energy C…","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-sat14","slug":"microsoft-sat14-san-antonio-tx","name":"Microsoft SAT14","state":"TX","county":"Bexar County","orgIds":["microsoft","cps-energy"],"iso":"ERCOT","utilities":["cps-energy"],"id":"epoch-microsoft-sat14:size.buildings_operational:epoch-ai-data-centers:2024-07-01","date":"2024-07-01","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/microsoft-sat14-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-sat14","slug":"microsoft-sat14-san-antonio-tx","name":"Microsoft SAT14","state":"TX","county":"Bexar County","orgIds":["microsoft","cps-energy"],"iso":"ERCOT","utilities":["cps-energy"],"id":"epoch-microsoft-sat14:status:epoch-ai-data-centers:2024-07-01","date":"2024-07-01","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/microsoft-sat14-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-sat14","slug":"microsoft-sat14-san-antonio-tx","name":"Microsoft SAT14","state":"TX","county":"Bexar County","orgIds":["microsoft","cps-energy"],"iso":"ERCOT","utilities":["cps-energy"],"id":"epoch-microsoft-sat14:phase_operational:2024-07-01:epoch-ai-data-centers","date":"2024-07-01","kind":"milestone","milestone":"phase_operational","description":"Building 1 operational. The first 2 data halls of Building 1 (with chillers already installed) are likely to be already operational. Although construction was completed prior, the on-site substation was previously incomplete, so we believe it was only operational at this point.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 operational. The first 2 data halls of Building 1 (with chillers already installed) are likely to be already operational. Although construction was completed prior, the on-site substation was previously inc…","url":"https://datacenters.prithvidixit.com/facilities/microsoft-sat14-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:construction_start:2024-05-31:epoch-ai-data-centers","date":"2024-05-31","kind":"milestone","milestone":"construction_start","description":"Land clearing begins for northern two buildings (Building 1-2)","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Land clearing begins for northern two buildings (Building 1-2)","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-sat40","slug":"microsoft-sat40-san-antonio-tx","name":"Microsoft SAT40","state":"TX","county":"Bexar County","orgIds":["microsoft","medina-electric-coop-inc"],"iso":"ERCOT","utilities":["medina-electric-coop-inc"],"id":"epoch-microsoft-sat40:size.buildings_operational:epoch-ai-data-centers:2024-05-24","date":"2024-05-24","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/microsoft-sat40-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-sat40","slug":"microsoft-sat40-san-antonio-tx","name":"Microsoft SAT40","state":"TX","county":"Bexar County","orgIds":["microsoft","medina-electric-coop-inc"],"iso":"ERCOT","utilities":["medina-electric-coop-inc"],"id":"epoch-microsoft-sat40:status:epoch-ai-data-centers:2024-05-24","date":"2024-05-24","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/microsoft-sat40-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-sat40","slug":"microsoft-sat40-san-antonio-tx","name":"Microsoft SAT40","state":"TX","county":"Bexar County","orgIds":["microsoft","medina-electric-coop-inc"],"iso":"ERCOT","utilities":["medina-electric-coop-inc"],"id":"epoch-microsoft-sat40:phase_operational:2024-05-24:epoch-ai-data-centers","date":"2024-05-24","kind":"milestone","milestone":"phase_operational","description":"Building 1 operational. Estimated 3 months out from February, when there was still construction equipment.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 operational. Estimated 3 months out from February, when there was still construction equipment.","url":"https://datacenters.prithvidixit.com/facilities/microsoft-sat40-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-vantage-tx1","slug":"vantage-tx1-san-antonio-tx","name":"Vantage TX1","state":"TX","county":"Bexar County","orgIds":["pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-vantage-tx1:construction_start:2023-12-15:epoch-ai-data-centers","date":"2023-12-15","kind":"milestone","milestone":"construction_start","description":"Land clearing begins for both Building 1 & Building 2","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Land clearing begins for both Building 1 & Building 2","url":"https://datacenters.prithvidixit.com/facilities/vantage-tx1-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-midlothian","slug":"google-midlothian-midlothian-tx","name":"Google Midlothian","state":"TX","county":"Ellis County","orgIds":["google","sharka-llc","united-electric-coop-service-inc-tx"],"iso":"ERCOT","utilities":["united-electric-coop-service-inc-tx"],"id":"epoch-google-midlothian:construction_start:2023-11-28:epoch-ai-data-centers","date":"2023-11-28","kind":"milestone","milestone":"construction_start","description":"Visible land clearing around the area for Building 1","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Visible land clearing around the area for Building 1","url":"https://datacenters.prithvidixit.com/facilities/google-midlothian-midlothian-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}}],"meta":{"total":78,"limit":100,"offset":0,"dataAsOf":"2026-10-12"},"attribution":{"license":"Open Database License (ODbL) 1.0 for the compiled database; individual sources keep their own terms (see sources[].license).","credit":["© OpenStreetMap contributors (ODbL 1.0) — https://www.openstreetmap.org/copyright","Epoch AI, 'AI data centers'. Published online at epoch.ai. Retrieved from 'https://epoch.ai/data/ai-data-centers' (CC BY 4.0)","Datacenter Source — https://datacenters.prithvidixit.com"],"terms":"/api#license","note":"Every figure links to its source. MW totals are floors (most facilities don't disclose power). Evidence levels: confirmed / announced / estimated — see /sources#evidence-levels."}}