{"data":[{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:power.it_mw:epoch-ai-data-centers:2026-09-30","date":"2026-09-30","kind":"value","field":"power.it_mw","before":152,"after":178,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 152 MW → 178 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:power.facility_mw:epoch-ai-data-centers:2026-09-30","date":"2026-09-30","kind":"value","field":"power.facility_mw","before":198,"after":231,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 198 MW → 231 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:compute.h100e:epoch-ai-data-centers:2026-09-30","date":"2026-09-30","kind":"value","field":"compute.h100e","before":173200,"after":202500,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Compute (H100-equivalents): 173,200 → 202,500","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:re.capex_usd_b:epoch-ai-data-centers:2026-09-30","date":"2026-09-30","kind":"value","field":"re.capex_usd_b","before":5.8,"after":6.7,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Capital cost / investment: $5.8B → $6.7B","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:size.buildings_operational:epoch-ai-data-centers:2026-09-30","date":"2026-09-30","kind":"value","field":"size.buildings_operational","before":2,"after":3,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 2 → 3","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:status:epoch-ai-data-centers:2026-09-30","date":"2026-09-30","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:phase_operational:2026-09-30:epoch-ai-data-centers","date":"2026-09-30","kind":"milestone","milestone":"phase_operational","description":"Building 3 is operational. Based on the stated completion date in this [regulatory filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026008019)","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 3 is operational. Based on the stated completion date in this regulatory filing","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:power.it_mw:epoch-ai-data-centers:2026-08-31","date":"2026-08-31","kind":"value","field":"power.it_mw","before":368,"after":496,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 368 MW → 496 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:power.facility_mw:epoch-ai-data-centers:2026-08-31","date":"2026-08-31","kind":"value","field":"power.facility_mw","before":478,"after":645,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 478 MW → 645 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:size.buildings_operational:epoch-ai-data-centers:2026-08-31","date":"2026-08-31","kind":"value","field":"size.buildings_operational","before":6,"after":11,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 6 → 11","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:phase_operational:2026-08-31:epoch-ai-data-centers","date":"2026-08-31","kind":"milestone","milestone":"phase_operational","description":"Buildings 7-10 (tents) are operational, based on infrared drone video from RAAD (raad.com) captured on this date. The video suggests that 138.8 MW of nameplate turbine capacity is operating at the Socrates South power plant (about 69% of the 200 MW nameplate capacity), and Buildings 7-10 roof vents are bright on infrared while Buildings 11-12 vents are not. That's 4/6 buildings operating, implying about 67% of capacity, which is consistent with 69% of the power plant operating. In the north, Buildings 16-27 (tents) look to be in a completed state. Each northern set of 6 tents still awaits to be connected to one of the corresponding power plants to become operational. Drone video from August 19th shows no turbines operating at Socrates North, though there are 3 small diesel generators operating. Building 13 (Vantage) is still under construction, we estimate another 3 months before operability.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Buildings 7-10 (tents) are operational, based on infrared drone video from RAAD (raad.com) captured on this date. The video suggests that 138.8 MW of nameplate turbine capacity is operating at the Socrates South power…","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-gallatin","slug":"meta-gallatin-gallatin-tn","name":"Meta Gallatin","state":"TN","county":"Sumner County","orgIds":["meta","cumberland-elec-member-corp"],"iso":"None (non-RTO region)","utilities":["cumberland-elec-member-corp"],"id":"epoch-meta-gallatin:phase_operational:2026-08-24:epoch-ai-data-centers","date":"2026-08-24","kind":"milestone","milestone":"phase_operational","description":"Building 1 is operational, based on a lack of construction activity around the shell and cooling equipment, and about 6 months passing after structural completion.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 is operational, based on a lack of construction activity around the shell and cooling equipment, and about 6 months passing after structural completion.","url":"https://datacenters.prithvidixit.com/facilities/meta-gallatin-gallatin-tn","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-aiken","slug":"meta-aiken-trenton-sc","name":"Meta Aiken","state":"SC","county":"Aiken County","orgIds":["meta","dominion-energy-south-carolina-inc"],"iso":"None (non-RTO region)","utilities":["dominion-energy-south-carolina-inc"],"id":"epoch-meta-aiken:size.buildings_operational:epoch-ai-data-centers:2026-08-07","date":"2026-08-07","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/meta-aiken-trenton-sc","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-aiken","slug":"meta-aiken-trenton-sc","name":"Meta Aiken","state":"SC","county":"Aiken County","orgIds":["meta","dominion-energy-south-carolina-inc"],"iso":"None (non-RTO region)","utilities":["dominion-energy-south-carolina-inc"],"id":"epoch-meta-aiken:status:epoch-ai-data-centers:2026-08-07","date":"2026-08-07","kind":"value","field":"status","before":"under_construction","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-aiken-trenton-sc","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-aiken","slug":"meta-aiken-trenton-sc","name":"Meta Aiken","state":"SC","county":"Aiken County","orgIds":["meta","dominion-energy-south-carolina-inc"],"iso":"None (non-RTO region)","utilities":["dominion-energy-south-carolina-inc"],"id":"epoch-meta-aiken:phase_operational:2026-08-07:epoch-ai-data-centers","date":"2026-08-07","kind":"milestone","milestone":"phase_operational","description":"Building 1 is confirmed operational via drone imagery with 8/9 group of coolers with spinning fans. Imagery also confirms all cooling and power infrastructure in place for Building 2.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 is confirmed operational via drone imagery with 8/9 group of coolers with spinning fans. Imagery also confirms all cooling and power infrastructure in place for Building 2.","url":"https://datacenters.prithvidixit.com/facilities/meta-aiken-trenton-sc","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-sarpy","slug":"meta-sarpy-springfield-ne","name":"Meta Sarpy","state":"NE","county":"Sarpy County","orgIds":["meta","opdp"],"iso":"SPP","utilities":["opdp"],"id":"epoch-meta-sarpy:size.buildings_operational:epoch-ai-data-centers:2026-08-02","date":"2026-08-02","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/meta-sarpy-springfield-ne","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-sarpy","slug":"meta-sarpy-springfield-ne","name":"Meta Sarpy","state":"NE","county":"Sarpy County","orgIds":["meta","opdp"],"iso":"SPP","utilities":["opdp"],"id":"epoch-meta-sarpy:status:epoch-ai-data-centers:2026-08-02","date":"2026-08-02","kind":"value","field":"status","before":"under_construction","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-sarpy-springfield-ne","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-sarpy","slug":"meta-sarpy-springfield-ne","name":"Meta Sarpy","state":"NE","county":"Sarpy County","orgIds":["meta","opdp"],"iso":"SPP","utilities":["opdp"],"id":"epoch-meta-sarpy:phase_operational:2026-08-02:epoch-ai-data-centers","date":"2026-08-02","kind":"milestone","milestone":"phase_operational","description":"Building 1 is operational (estimate).","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 is operational (estimate).","url":"https://datacenters.prithvidixit.com/facilities/meta-sarpy-springfield-ne","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-cheyenne","slug":"meta-cheyenne-laramie-county-wy","name":"Meta Cheyenne","state":"WY","county":"Laramie County","orgIds":["meta","black-hills"],"iso":"None (non-RTO region)","utilities":["black-hills"],"id":"epoch-meta-cheyenne:size.buildings_operational:epoch-ai-data-centers:2026-07-25","date":"2026-07-25","kind":"value","field":"size.buildings_operational","before":0,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 2","url":"https://datacenters.prithvidixit.com/facilities/meta-cheyenne-laramie-county-wy","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-cheyenne","slug":"meta-cheyenne-laramie-county-wy","name":"Meta Cheyenne","state":"WY","county":"Laramie County","orgIds":["meta","black-hills"],"iso":"None (non-RTO region)","utilities":["black-hills"],"id":"epoch-meta-cheyenne:status:epoch-ai-data-centers:2026-07-25","date":"2026-07-25","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/meta-cheyenne-laramie-county-wy","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-cheyenne","slug":"meta-cheyenne-laramie-county-wy","name":"Meta Cheyenne","state":"WY","county":"Laramie County","orgIds":["meta","black-hills"],"iso":"None (non-RTO region)","utilities":["black-hills"],"id":"epoch-meta-cheyenne:phase_operational:2026-07-25:epoch-ai-data-centers","date":"2026-07-25","kind":"milestone","milestone":"phase_operational","description":"Both buildings estimated to be operational.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Both buildings estimated to be operational.","url":"https://datacenters.prithvidixit.com/facilities/meta-cheyenne-laramie-county-wy","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-rosemount","slug":"meta-rosemount-rosemount-mn","name":"Meta Rosemount","state":"MN","county":"Dakota County","orgIds":["meta","northern-states-power-co-minnesota"],"iso":"MISO","utilities":["northern-states-power-co-minnesota"],"id":"epoch-meta-rosemount:size.buildings_operational:epoch-ai-data-centers:2026-06-19","date":"2026-06-19","kind":"value","field":"size.buildings_operational","before":0,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 2","url":"https://datacenters.prithvidixit.com/facilities/meta-rosemount-rosemount-mn","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-rosemount","slug":"meta-rosemount-rosemount-mn","name":"Meta Rosemount","state":"MN","county":"Dakota County","orgIds":["meta","northern-states-power-co-minnesota"],"iso":"MISO","utilities":["northern-states-power-co-minnesota"],"id":"epoch-meta-rosemount:status:epoch-ai-data-centers:2026-06-19","date":"2026-06-19","kind":"value","field":"status","before":"under_construction","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-rosemount-rosemount-mn","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-rosemount","slug":"meta-rosemount-rosemount-mn","name":"Meta Rosemount","state":"MN","county":"Dakota County","orgIds":["meta","northern-states-power-co-minnesota"],"iso":"MISO","utilities":["northern-states-power-co-minnesota"],"id":"epoch-meta-rosemount:phase_operational:2026-06-19:epoch-ai-data-centers","date":"2026-06-19","kind":"milestone","milestone":"phase_operational","description":"Buildings 1 and 2 are estimated to be operational.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Buildings 1 and 2 are estimated to be operational.","url":"https://datacenters.prithvidixit.com/facilities/meta-rosemount-rosemount-mn","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-montgomery","slug":"meta-montgomery-montgomery-al","name":"Meta Montgomery","state":"AL","county":"Montgomery County","orgIds":["meta","hensel-phelps","alabama-power-co"],"iso":"None (non-RTO region)","utilities":["alabama-power-co"],"id":"epoch-meta-montgomery:size.buildings_operational:epoch-ai-data-centers:2026-06-18","date":"2026-06-18","kind":"value","field":"size.buildings_operational","before":0,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 2","url":"https://datacenters.prithvidixit.com/facilities/meta-montgomery-montgomery-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-montgomery","slug":"meta-montgomery-montgomery-al","name":"Meta Montgomery","state":"AL","county":"Montgomery County","orgIds":["meta","hensel-phelps","alabama-power-co"],"iso":"None (non-RTO region)","utilities":["alabama-power-co"],"id":"epoch-meta-montgomery:status:epoch-ai-data-centers:2026-06-18","date":"2026-06-18","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/meta-montgomery-montgomery-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-montgomery","slug":"meta-montgomery-montgomery-al","name":"Meta Montgomery","state":"AL","county":"Montgomery County","orgIds":["meta","hensel-phelps","alabama-power-co"],"iso":"None (non-RTO region)","utilities":["alabama-power-co"],"id":"epoch-meta-montgomery:phase_operational:2026-06-18:epoch-ai-data-centers","date":"2026-06-18","kind":"milestone","milestone":"phase_operational","description":"We estimate Buildings 1 and 2 are operational.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: We estimate Buildings 1 and 2 are operational.","url":"https://datacenters.prithvidixit.com/facilities/meta-montgomery-montgomery-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-gallatin","slug":"meta-gallatin-gallatin-tn","name":"Meta Gallatin","state":"TN","county":"Sumner County","orgIds":["meta","cumberland-elec-member-corp"],"iso":"None (non-RTO region)","utilities":["cumberland-elec-member-corp"],"id":"epoch-meta-gallatin:size.buildings_operational:epoch-ai-data-centers:2026-06-15","date":"2026-06-15","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/meta-gallatin-gallatin-tn","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-gallatin","slug":"meta-gallatin-gallatin-tn","name":"Meta Gallatin","state":"TN","county":"Sumner County","orgIds":["meta","cumberland-elec-member-corp"],"iso":"None (non-RTO region)","utilities":["cumberland-elec-member-corp"],"id":"epoch-meta-gallatin:status:epoch-ai-data-centers:2026-06-15","date":"2026-06-15","kind":"value","field":"status","before":"under_construction","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-gallatin-gallatin-tn","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-jeffersonville","slug":"meta-jeffersonville-jeffersonville-in","name":"Meta Jeffersonville","state":"IN","county":"Clark County","orgIds":["meta","duke-energy"],"iso":"MISO","utilities":["duke-energy"],"id":"epoch-meta-jeffersonville:size.buildings_operational:epoch-ai-data-centers:2026-06-04","date":"2026-06-04","kind":"value","field":"size.buildings_operational","before":0,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 2","url":"https://datacenters.prithvidixit.com/facilities/meta-jeffersonville-jeffersonville-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-jeffersonville","slug":"meta-jeffersonville-jeffersonville-in","name":"Meta Jeffersonville","state":"IN","county":"Clark County","orgIds":["meta","duke-energy"],"iso":"MISO","utilities":["duke-energy"],"id":"epoch-meta-jeffersonville:status:epoch-ai-data-centers:2026-06-04","date":"2026-06-04","kind":"value","field":"status","before":"under_construction","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-jeffersonville-jeffersonville-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-jeffersonville","slug":"meta-jeffersonville-jeffersonville-in","name":"Meta Jeffersonville","state":"IN","county":"Clark County","orgIds":["meta","duke-energy"],"iso":"MISO","utilities":["duke-energy"],"id":"epoch-meta-jeffersonville:phase_operational:2026-06-04:epoch-ai-data-centers","date":"2026-06-04","kind":"milestone","milestone":"phase_operational","description":"Building 1 and 2 are operational.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 and 2 are operational.","url":"https://datacenters.prithvidixit.com/facilities/meta-jeffersonville-jeffersonville-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-huntsville","slug":"meta-huntsville-madison-county-al","name":"Meta Huntsville","state":"AL","county":"Madison County","orgIds":["meta","tva","nextera","first-solar"],"iso":"None (non-RTO region)","utilities":["tva"],"id":"epoch-meta-huntsville:power.it_mw:epoch-ai-data-centers:2026-06-02","date":"2026-06-02","kind":"value","field":"power.it_mw","before":78,"after":146,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 78 MW → 146 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-huntsville-madison-county-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-huntsville","slug":"meta-huntsville-madison-county-al","name":"Meta Huntsville","state":"AL","county":"Madison County","orgIds":["meta","tva","nextera","first-solar"],"iso":"None (non-RTO region)","utilities":["tva"],"id":"epoch-meta-huntsville:power.facility_mw:epoch-ai-data-centers:2026-06-02","date":"2026-06-02","kind":"value","field":"power.facility_mw","before":105,"after":198,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 105 MW → 198 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-huntsville-madison-county-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-huntsville","slug":"meta-huntsville-madison-county-al","name":"Meta Huntsville","state":"AL","county":"Madison County","orgIds":["meta","tva","nextera","first-solar"],"iso":"None (non-RTO region)","utilities":["tva"],"id":"epoch-meta-huntsville:size.buildings_operational:epoch-ai-data-centers:2026-06-02","date":"2026-06-02","kind":"value","field":"size.buildings_operational","before":1,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 2","url":"https://datacenters.prithvidixit.com/facilities/meta-huntsville-madison-county-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-huntsville","slug":"meta-huntsville-madison-county-al","name":"Meta Huntsville","state":"AL","county":"Madison County","orgIds":["meta","tva","nextera","first-solar"],"iso":"None (non-RTO region)","utilities":["tva"],"id":"epoch-meta-huntsville:status:epoch-ai-data-centers:2026-06-02","date":"2026-06-02","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-huntsville-madison-county-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-huntsville","slug":"meta-huntsville-madison-county-al","name":"Meta Huntsville","state":"AL","county":"Madison County","orgIds":["meta","tva","nextera","first-solar"],"iso":"None (non-RTO region)","utilities":["tva"],"id":"epoch-meta-huntsville:phase_operational:2026-06-02:epoch-ai-data-centers","date":"2026-06-02","kind":"milestone","milestone":"phase_operational","description":"We estimate Building 2 becomes operational due to being 120 days after final phases of construction, 9 months since roof and cooling were done, and similar Meta data centers construction timelines.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: We estimate Building 2 becomes operational due to being 120 days after final phases of construction, 9 months since roof and cooling were done, and similar Meta data centers construction timelines.","url":"https://datacenters.prithvidixit.com/facilities/meta-huntsville-madison-county-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-kuna","slug":"meta-kuna-ada-county-id","name":"Meta Kuna","state":"ID","county":"Ada County","orgIds":["meta","idaho-power"],"iso":"None (non-RTO region)","utilities":["idaho-power"],"id":"epoch-meta-kuna:size.buildings_operational:epoch-ai-data-centers:2026-06-01","date":"2026-06-01","kind":"value","field":"size.buildings_operational","before":0,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 2","url":"https://datacenters.prithvidixit.com/facilities/meta-kuna-ada-county-id","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-kuna","slug":"meta-kuna-ada-county-id","name":"Meta Kuna","state":"ID","county":"Ada County","orgIds":["meta","idaho-power"],"iso":"None (non-RTO region)","utilities":["idaho-power"],"id":"epoch-meta-kuna:status:epoch-ai-data-centers:2026-06-01","date":"2026-06-01","kind":"value","field":"status","before":"under_construction","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-kuna-ada-county-id","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-kuna","slug":"meta-kuna-ada-county-id","name":"Meta Kuna","state":"ID","county":"Ada County","orgIds":["meta","idaho-power"],"iso":"None (non-RTO region)","utilities":["idaho-power"],"id":"epoch-meta-kuna:phase_operational:2026-06-01:epoch-ai-data-centers","date":"2026-06-01","kind":"milestone","milestone":"phase_operational","description":"Building 1 and 2 are operational. The 2nd phase of an offsetting solar array goes online on May 31, 2026.  Idaho Public Utilities Comission's approval for this start date notes that \"[Meta]’s load is expected to increase so much that it will suffer a capacity deficit in June 2026 if served only by Pleasant Valley Solar 1.1,” A redacted table in the staff comments document suggests the data center's load will continue to increase through August, when it presumably reaches the maximum capacity of both buildings.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 and 2 are operational. The 2nd phase of an offsetting solar array goes online on May 31, 2026. Idaho Public Utilities Comission's approval for this start date notes that \"[Meta]’s load is expected to increa…","url":"https://datacenters.prithvidixit.com/facilities/meta-kuna-ada-county-id","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:land_acquired:2026-05-28:county-licking-oh","date":"2026-05-28","kind":"milestone","milestone":"land_acquired","description":"Deed/transfer recorded for parcel 095-112218-00.000 (no sale price disclosed).","sourceId":"county-licking-oh","evidenceLevel":"confirmed","text":"Land acquired: Deed/transfer recorded for parcel 095-112218-00.000 (no sale price disclosed).","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"county-licking-oh","title":"Auditor Parcels","publisher":"Licking County, OH — Auditor","url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:power.it_mw:epoch-ai-data-centers:2026-05-18","date":"2026-05-18","kind":"value","field":"power.it_mw","before":368,"after":496,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 368 MW → 496 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:power.facility_mw:epoch-ai-data-centers:2026-05-18","date":"2026-05-18","kind":"value","field":"power.facility_mw","before":478,"after":645,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 478 MW → 645 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:size.buildings_operational:epoch-ai-data-centers:2026-05-18","date":"2026-05-18","kind":"value","field":"size.buildings_operational","before":6,"after":11,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 6 → 11","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-eagle-mountain","slug":"meta-eagle-mountain-eagle-mountain-ut","name":"Meta Eagle Mountain","state":"UT","county":"Utah County","orgIds":["meta","mortenson","williams","pacificorp"],"iso":"None (non-RTO region)","utilities":["pacificorp"],"id":"epoch-meta-eagle-mountain:status:epoch-ai-data-centers:2026-05-02","date":"2026-05-02","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-eagle-mountain-eagle-mountain-ut","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-qts-hillsboro-2","slug":"meta-qts-hillsboro-2-hillsboro-or","name":"Meta-QTS Hillsboro 2","state":"OR","county":"Washington County","orgIds":["meta","pge-oregon","avangrid"],"iso":"None (non-RTO region)","utilities":["pge-oregon"],"id":"epoch-meta-qts-hillsboro-2:status:epoch-ai-data-centers:2026-04-17","date":"2026-04-17","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-qts-hillsboro-2-hillsboro-or","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-huntsville","slug":"meta-huntsville-madison-county-al","name":"Meta Huntsville","state":"AL","county":"Madison County","orgIds":["meta","tva","nextera","first-solar"],"iso":"None (non-RTO region)","utilities":["tva"],"id":"epoch-meta-huntsville:size.buildings_operational:epoch-ai-data-centers:2026-03-04","date":"2026-03-04","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/meta-huntsville-madison-county-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-huntsville","slug":"meta-huntsville-madison-county-al","name":"Meta Huntsville","state":"AL","county":"Madison County","orgIds":["meta","tva","nextera","first-solar"],"iso":"None (non-RTO region)","utilities":["tva"],"id":"epoch-meta-huntsville:status:epoch-ai-data-centers:2026-03-04","date":"2026-03-04","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/meta-huntsville-madison-county-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-huntsville","slug":"meta-huntsville-madison-county-al","name":"Meta Huntsville","state":"AL","county":"Madison County","orgIds":["meta","tva","nextera","first-solar"],"iso":"None (non-RTO region)","utilities":["tva"],"id":"epoch-meta-huntsville:phase_operational:2026-03-04:epoch-ai-data-centers","date":"2026-03-04","kind":"milestone","milestone":"phase_operational","description":"We estimate that Building 1 is operational 30 days after the appearance of color artifacts on the fans.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: We estimate that Building 1 is operational 30 days after the appearance of color artifacts on the fans.","url":"https://datacenters.prithvidixit.com/facilities/meta-huntsville-madison-county-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-los-lunas","slug":"meta-los-lunas-los-lunas-nm","name":"Meta Los Lunas","state":"NM","county":"Valencia County","orgIds":["meta"],"utilities":[],"id":"epoch-meta-los-lunas:size.buildings_operational:epoch-ai-data-centers:2026-03-01","date":"2026-03-01","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/meta-los-lunas-los-lunas-nm","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-los-lunas","slug":"meta-los-lunas-los-lunas-nm","name":"Meta Los Lunas","state":"NM","county":"Valencia County","orgIds":["meta"],"utilities":[],"id":"epoch-meta-los-lunas:status:epoch-ai-data-centers:2026-03-01","date":"2026-03-01","kind":"value","field":"status","before":"under_construction","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-los-lunas-los-lunas-nm","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-los-lunas","slug":"meta-los-lunas-los-lunas-nm","name":"Meta Los Lunas","state":"NM","county":"Valencia County","orgIds":["meta"],"utilities":[],"id":"epoch-meta-los-lunas:phase_operational:2026-03-01:epoch-ai-data-centers","date":"2026-03-01","kind":"milestone","milestone":"phase_operational","description":"Building 1 is operational, based on no construction activity around the shell and cooling equipment, and about 5 months passing after structural completion.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 is operational, based on no construction activity around the shell and cooling equipment, and about 5 months passing after structural completion.","url":"https://datacenters.prithvidixit.com/facilities/meta-los-lunas-los-lunas-nm","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:power.it_mw:epoch-ai-data-centers:2026-01-18","date":"2026-01-18","kind":"value","field":"power.it_mw","before":76,"after":368,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 76 MW → 368 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:power.facility_mw:epoch-ai-data-centers:2026-01-18","date":"2026-01-18","kind":"value","field":"power.facility_mw","before":99,"after":478,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 99 MW → 478 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:size.buildings_operational:epoch-ai-data-centers:2026-01-18","date":"2026-01-18","kind":"value","field":"size.buildings_operational","before":1,"after":6,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 6","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:phase_operational:2026-01-18:epoch-ai-data-centers","date":"2026-01-18","kind":"milestone","milestone":"phase_operational","description":"Buildings 2-6 are operational, based on all equipment being in place, the paved ground, and minimal construction equipment by the buildings. Buildings 7-11 all have some kind of power or cooling equipment lining their right side which are not fully installed. Building 14 has chillers installed. Buildings 16-20 roofs are complete. The Socrates South power plant to the right of Buildings 7-11 has 7 gas turbines in place, judging by the exhaust stacks.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Buildings 2-6 are operational, based on all equipment being in place, the paved ground, and minimal construction equipment by the buildings. Buildings 7-11 all have some kind of power or cooling equipment lining their…","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:size.buildings_operational:epoch-ai-data-centers:2025-12-09","date":"2025-12-09","kind":"value","field":"size.buildings_operational","before":0,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 2","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:status:epoch-ai-data-centers:2025-12-09","date":"2025-12-09","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:phase_operational:2025-12-09:epoch-ai-data-centers","date":"2025-12-09","kind":"milestone","milestone":"phase_operational","description":"Building 1 and 2 are operational. Activity related to the air quality permit (namely, emergency diesel generators) was reported to have started as of 2025-12-09. This is our best estimate, but note that the planned completion date in this [regulatory filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2022017728) is 2026-03-01.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 and 2 are operational. Activity related to the air quality permit (namely, emergency diesel generators) was reported to have started as of 2025-12-09. This is our best estimate, but note that the planned co…","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-eagle-mountain","slug":"meta-eagle-mountain-eagle-mountain-ut","name":"Meta Eagle Mountain","state":"UT","county":"Utah County","orgIds":["meta","mortenson","williams","pacificorp"],"iso":"None (non-RTO region)","utilities":["pacificorp"],"id":"epoch-meta-eagle-mountain:size.buildings_operational:epoch-ai-data-centers:2025-12-07","date":"2025-12-07","kind":"value","field":"size.buildings_operational","before":0,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 2","url":"https://datacenters.prithvidixit.com/facilities/meta-eagle-mountain-eagle-mountain-ut","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-eagle-mountain","slug":"meta-eagle-mountain-eagle-mountain-ut","name":"Meta Eagle Mountain","state":"UT","county":"Utah County","orgIds":["meta","mortenson","williams","pacificorp"],"iso":"None (non-RTO region)","utilities":["pacificorp"],"id":"epoch-meta-eagle-mountain:status:epoch-ai-data-centers:2025-12-07","date":"2025-12-07","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/meta-eagle-mountain-eagle-mountain-ut","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-eagle-mountain","slug":"meta-eagle-mountain-eagle-mountain-ut","name":"Meta Eagle Mountain","state":"UT","county":"Utah County","orgIds":["meta","mortenson","williams","pacificorp"],"iso":"None (non-RTO region)","utilities":["pacificorp"],"id":"epoch-meta-eagle-mountain:phase_operational:2025-12-07:epoch-ai-data-centers","date":"2025-12-07","kind":"milestone","milestone":"phase_operational","description":"Buildings 1 and 2 both estimated to be operational 90 days after testing was underway in September.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Buildings 1 and 2 both estimated to be operational 90 days after testing was underway in September.","url":"https://datacenters.prithvidixit.com/facilities/meta-eagle-mountain-eagle-mountain-ut","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:size.buildings_operational:epoch-ai-data-centers:2025-10-14","date":"2025-10-14","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:status:epoch-ai-data-centers:2025-10-14","date":"2025-10-14","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:phase_operational:2025-10-14:epoch-ai-data-centers","date":"2025-10-14","kind":"milestone","milestone":"phase_operational","description":"Building 1 is operational, based on there being minimal construction work and cars in the main carpark. Building 2 still has some construction work around the building. Building 18 roof is complete. The on-site power at Socrates South and Socrates North has some outlines of gas turbines, to be installed later.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 is operational, based on there being minimal construction work and cars in the main carpark. Building 2 still has some construction work around the building. Building 18 roof is complete. The on-site power …","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-hyperion","slug":"meta-hyperion-richland-parish-la","name":"Meta Hyperion","state":"LA","county":"Richland Parish","orgIds":["meta","mortenson","dpr-construction","turner-construction-company","mortenson-construction","entergy"],"iso":"MISO","utilities":["entergy"],"id":"epoch-meta-hyperion:construction_start:2024-12-20:epoch-ai-data-centers","date":"2024-12-20","kind":"milestone","milestone":"construction_start","description":"Land clearing begins.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Land clearing begins.","url":"https://datacenters.prithvidixit.com/facilities/meta-hyperion-richland-parish-la","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-qts-hillsboro-2","slug":"meta-qts-hillsboro-2-hillsboro-or","name":"Meta-QTS Hillsboro 2","state":"OR","county":"Washington County","orgIds":["meta","pge-oregon","avangrid"],"iso":"None (non-RTO region)","utilities":["pge-oregon"],"id":"epoch-meta-qts-hillsboro-2:power.it_mw:epoch-ai-data-centers:2024-11-08","date":"2024-11-08","kind":"value","field":"power.it_mw","before":45,"after":180,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 45 MW → 180 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-qts-hillsboro-2-hillsboro-or","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-qts-hillsboro-2","slug":"meta-qts-hillsboro-2-hillsboro-or","name":"Meta-QTS Hillsboro 2","state":"OR","county":"Washington County","orgIds":["meta","pge-oregon","avangrid"],"iso":"None (non-RTO region)","utilities":["pge-oregon"],"id":"epoch-meta-qts-hillsboro-2:power.facility_mw:epoch-ai-data-centers:2024-11-08","date":"2024-11-08","kind":"value","field":"power.facility_mw","before":61,"after":243,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 61 MW → 243 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-qts-hillsboro-2-hillsboro-or","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-qts-hillsboro-2","slug":"meta-qts-hillsboro-2-hillsboro-or","name":"Meta-QTS Hillsboro 2","state":"OR","county":"Washington County","orgIds":["meta","pge-oregon","avangrid"],"iso":"None (non-RTO region)","utilities":["pge-oregon"],"id":"epoch-meta-qts-hillsboro-2:size.buildings_operational:epoch-ai-data-centers:2024-11-08","date":"2024-11-08","kind":"value","field":"size.buildings_operational","before":1,"after":4,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 4","url":"https://datacenters.prithvidixit.com/facilities/meta-qts-hillsboro-2-hillsboro-or","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-qts-hillsboro-2","slug":"meta-qts-hillsboro-2-hillsboro-or","name":"Meta-QTS Hillsboro 2","state":"OR","county":"Washington County","orgIds":["meta","pge-oregon","avangrid"],"iso":"None (non-RTO region)","utilities":["pge-oregon"],"id":"epoch-meta-qts-hillsboro-2:phase_operational:2024-11-08:epoch-ai-data-centers","date":"2024-11-08","kind":"milestone","milestone":"phase_operational","description":"We believe Buildings 2, 3, and 4 are operational due to the absence of construction vehicles and completed parking lots/concrete around the facilities. There is also a vehicle presence in the parking lot similar to the level seen during normal operation at other data center campuses. Finally, it is more than 12 months after cooling has been installed or in the final stages of install for the remaining three buildings.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: We believe Buildings 2, 3, and 4 are operational due to the absence of construction vehicles and completed parking lots/concrete around the facilities. There is also a vehicle presence in the parking lot similar to th…","url":"https://datacenters.prithvidixit.com/facilities/meta-qts-hillsboro-2-hillsboro-or","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-bowling-green","slug":"meta-bowling-green-bowling-green-oh","name":"Meta Bowling Green","state":"OH","county":"Wood County","orgIds":["meta","williams","the-toledo-edison-co"],"iso":"PJM","utilities":["the-toledo-edison-co"],"id":"epoch-meta-bowling-green:construction_start:2024-11-01:epoch-ai-data-centers","date":"2024-11-01","kind":"milestone","milestone":"construction_start","description":"Land clearing begins.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Land clearing begins.","url":"https://datacenters.prithvidixit.com/facilities/meta-bowling-green-bowling-green-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-sarpy","slug":"meta-sarpy-springfield-ne","name":"Meta Sarpy","state":"NE","county":"Sarpy County","orgIds":["meta","opdp"],"iso":"SPP","utilities":["opdp"],"id":"epoch-meta-sarpy:construction_start:2024-08-01:epoch-ai-data-centers","date":"2024-08-01","kind":"milestone","milestone":"construction_start","description":"Building 1 grading underway.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Building 1 grading underway.","url":"https://datacenters.prithvidixit.com/facilities/meta-sarpy-springfield-ne","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-los-lunas","slug":"meta-los-lunas-los-lunas-nm","name":"Meta Los Lunas","state":"NM","county":"Valencia County","orgIds":["meta"],"utilities":[],"id":"epoch-meta-los-lunas:construction_start:2024-07-24:epoch-ai-data-centers","date":"2024-07-24","kind":"milestone","milestone":"construction_start","description":"Land clearing starts for new building.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Land clearing starts for new building.","url":"https://datacenters.prithvidixit.com/facilities/meta-los-lunas-los-lunas-nm","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-aiken","slug":"meta-aiken-trenton-sc","name":"Meta Aiken","state":"SC","county":"Aiken County","orgIds":["meta","dominion-energy-south-carolina-inc"],"iso":"None (non-RTO region)","utilities":["dominion-energy-south-carolina-inc"],"id":"epoch-meta-aiken:construction_start:2024-05-30:epoch-ai-data-centers","date":"2024-05-30","kind":"milestone","milestone":"construction_start","description":"Land clearing begins","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Land clearing begins","url":"https://datacenters.prithvidixit.com/facilities/meta-aiken-trenton-sc","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-rosemount","slug":"meta-rosemount-rosemount-mn","name":"Meta Rosemount","state":"MN","county":"Dakota County","orgIds":["meta","northern-states-power-co-minnesota"],"iso":"MISO","utilities":["northern-states-power-co-minnesota"],"id":"epoch-meta-rosemount:construction_start:2024-05-01:epoch-ai-data-centers","date":"2024-05-01","kind":"milestone","milestone":"construction_start","description":"Land clearing begins.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Land clearing begins.","url":"https://datacenters.prithvidixit.com/facilities/meta-rosemount-rosemount-mn","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-cheyenne","slug":"meta-cheyenne-laramie-county-wy","name":"Meta Cheyenne","state":"WY","county":"Laramie County","orgIds":["meta","black-hills"],"iso":"None (non-RTO region)","utilities":["black-hills"],"id":"epoch-meta-cheyenne:construction_start:2024-04-01:epoch-ai-data-centers","date":"2024-04-01","kind":"milestone","milestone":"construction_start","description":"Land clearing begins.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Land clearing begins.","url":"https://datacenters.prithvidixit.com/facilities/meta-cheyenne-laramie-county-wy","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-montgomery","slug":"meta-montgomery-montgomery-al","name":"Meta Montgomery","state":"AL","county":"Montgomery County","orgIds":["meta","hensel-phelps","alabama-power-co"],"iso":"None (non-RTO region)","utilities":["alabama-power-co"],"id":"epoch-meta-montgomery:construction_start:2024-03-01:epoch-ai-data-centers","date":"2024-03-01","kind":"milestone","milestone":"construction_start","description":"Land clearing begins.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Land clearing begins.","url":"https://datacenters.prithvidixit.com/facilities/meta-montgomery-montgomery-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-jeffersonville","slug":"meta-jeffersonville-jeffersonville-in","name":"Meta Jeffersonville","state":"IN","county":"Clark County","orgIds":["meta","duke-energy"],"iso":"MISO","utilities":["duke-energy"],"id":"epoch-meta-jeffersonville:construction_start:2024-02-01:epoch-ai-data-centers","date":"2024-02-01","kind":"milestone","milestone":"construction_start","description":"Land clearing begins.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Land clearing begins.","url":"https://datacenters.prithvidixit.com/facilities/meta-jeffersonville-jeffersonville-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}}],"meta":{"total":78,"limit":100,"offset":0,"dataAsOf":"2026-10-12"},"attribution":{"license":"Open Database License (ODbL) 1.0 for the compiled database; individual sources keep their own terms (see sources[].license).","credit":["© OpenStreetMap contributors (ODbL 1.0) — https://www.openstreetmap.org/copyright","Epoch AI, 'AI data centers'. Published online at epoch.ai. Retrieved from 'https://epoch.ai/data/ai-data-centers' (CC BY 4.0)","Datacenter Source — https://datacenters.prithvidixit.com"],"terms":"/api#license","note":"Every figure links to its source. MW totals are floors (most facilities don't disclose power). Evidence levels: confirmed / announced / estimated — see /sources#evidence-levels."}}