{"data":[{"facilityId":"epoch-aws-berwick","slug":"aws-berwick-berwick-pa","name":"AWS Berwick","state":"PA","county":"Luzerne County","orgIds":["amazon","anthropic","ppl","talen-energy"],"iso":"PJM","utilities":["ppl"],"id":"epoch-aws-berwick:power.it_mw:epoch-ai-data-centers:2026-08-01","date":"2026-08-01","kind":"value","field":"power.it_mw","before":77,"after":108,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 77 MW → 108 MW","url":"https://datacenters.prithvidixit.com/facilities/aws-berwick-berwick-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-aws-berwick","slug":"aws-berwick-berwick-pa","name":"AWS Berwick","state":"PA","county":"Luzerne County","orgIds":["amazon","anthropic","ppl","talen-energy"],"iso":"PJM","utilities":["ppl"],"id":"epoch-aws-berwick:power.facility_mw:epoch-ai-data-centers:2026-08-01","date":"2026-08-01","kind":"value","field":"power.facility_mw","before":102,"after":139,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 102 MW → 139 MW","url":"https://datacenters.prithvidixit.com/facilities/aws-berwick-berwick-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-aws-berwick","slug":"aws-berwick-berwick-pa","name":"AWS Berwick","state":"PA","county":"Luzerne County","orgIds":["amazon","anthropic","ppl","talen-energy"],"iso":"PJM","utilities":["ppl"],"id":"epoch-aws-berwick:size.buildings_operational:epoch-ai-data-centers:2026-08-01","date":"2026-08-01","kind":"value","field":"size.buildings_operational","before":2,"after":3,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 2 → 3","url":"https://datacenters.prithvidixit.com/facilities/aws-berwick-berwick-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-aws-berwick","slug":"aws-berwick-berwick-pa","name":"AWS Berwick","state":"PA","county":"Luzerne County","orgIds":["amazon","anthropic","ppl","talen-energy"],"iso":"PJM","utilities":["ppl"],"id":"epoch-aws-berwick:phase_operational:2026-08-01:epoch-ai-data-centers","date":"2026-08-01","kind":"milestone","milestone":"phase_operational","description":"Building 3 expected to come online sometime around August 2026, since in the May satellite image it appeared structurally complete with minimal construction surrounding it. Basing MW estimate using Building 2 as a reference.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 3 expected to come online sometime around August 2026, since in the May satellite image it appeared structurally complete with minimal construction surrounding it. Basing MW estimate using Building 2 as a ref…","url":"https://datacenters.prithvidixit.com/facilities/aws-berwick-berwick-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}}],"meta":{"total":4,"limit":100,"offset":0,"dataAsOf":"2026-10-12"},"attribution":{"license":"Open Database License (ODbL) 1.0 for the compiled database; individual sources keep their own terms (see sources[].license).","credit":["© OpenStreetMap contributors (ODbL 1.0) — https://www.openstreetmap.org/copyright","Epoch AI, 'AI data centers'. Published online at epoch.ai. Retrieved from 'https://epoch.ai/data/ai-data-centers' (CC BY 4.0)","Datacenter Source — https://datacenters.prithvidixit.com"],"terms":"/api#license","note":"Every figure links to its source. MW totals are floors (most facilities don't disclose power). Evidence levels: confirmed / announced / estimated — see /sources#evidence-levels."}}