{"data":[{"facilityId":"epoch-meta-rosemount","slug":"meta-rosemount-rosemount-mn","name":"Meta Rosemount","state":"MN","county":"Dakota County","orgIds":["meta","northern-states-power-co-minnesota"],"iso":"MISO","utilities":["northern-states-power-co-minnesota"],"id":"epoch-meta-rosemount:size.buildings_operational:epoch-ai-data-centers:2026-06-19","date":"2026-06-19","kind":"value","field":"size.buildings_operational","before":0,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 2","url":"https://datacenters.prithvidixit.com/facilities/meta-rosemount-rosemount-mn","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-rosemount","slug":"meta-rosemount-rosemount-mn","name":"Meta Rosemount","state":"MN","county":"Dakota County","orgIds":["meta","northern-states-power-co-minnesota"],"iso":"MISO","utilities":["northern-states-power-co-minnesota"],"id":"epoch-meta-rosemount:status:epoch-ai-data-centers:2026-06-19","date":"2026-06-19","kind":"value","field":"status","before":"under_construction","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-rosemount-rosemount-mn","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-rosemount","slug":"meta-rosemount-rosemount-mn","name":"Meta Rosemount","state":"MN","county":"Dakota County","orgIds":["meta","northern-states-power-co-minnesota"],"iso":"MISO","utilities":["northern-states-power-co-minnesota"],"id":"epoch-meta-rosemount:phase_operational:2026-06-19:epoch-ai-data-centers","date":"2026-06-19","kind":"milestone","milestone":"phase_operational","description":"Buildings 1 and 2 are estimated to be operational.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Buildings 1 and 2 are estimated to be operational.","url":"https://datacenters.prithvidixit.com/facilities/meta-rosemount-rosemount-mn","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-montgomery","slug":"meta-montgomery-montgomery-al","name":"Meta Montgomery","state":"AL","county":"Montgomery County","orgIds":["meta","hensel-phelps","alabama-power-co"],"iso":"None (non-RTO region)","utilities":["alabama-power-co"],"id":"epoch-meta-montgomery:size.buildings_operational:epoch-ai-data-centers:2026-06-18","date":"2026-06-18","kind":"value","field":"size.buildings_operational","before":0,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 2","url":"https://datacenters.prithvidixit.com/facilities/meta-montgomery-montgomery-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-montgomery","slug":"meta-montgomery-montgomery-al","name":"Meta Montgomery","state":"AL","county":"Montgomery County","orgIds":["meta","hensel-phelps","alabama-power-co"],"iso":"None (non-RTO region)","utilities":["alabama-power-co"],"id":"epoch-meta-montgomery:status:epoch-ai-data-centers:2026-06-18","date":"2026-06-18","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/meta-montgomery-montgomery-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-montgomery","slug":"meta-montgomery-montgomery-al","name":"Meta Montgomery","state":"AL","county":"Montgomery County","orgIds":["meta","hensel-phelps","alabama-power-co"],"iso":"None (non-RTO region)","utilities":["alabama-power-co"],"id":"epoch-meta-montgomery:phase_operational:2026-06-18:epoch-ai-data-centers","date":"2026-06-18","kind":"milestone","milestone":"phase_operational","description":"We estimate Buildings 1 and 2 are operational.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: We estimate Buildings 1 and 2 are operational.","url":"https://datacenters.prithvidixit.com/facilities/meta-montgomery-montgomery-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-gallatin","slug":"meta-gallatin-gallatin-tn","name":"Meta Gallatin","state":"TN","county":"Sumner County","orgIds":["meta","cumberland-elec-member-corp"],"iso":"None (non-RTO region)","utilities":["cumberland-elec-member-corp"],"id":"epoch-meta-gallatin:size.buildings_operational:epoch-ai-data-centers:2026-06-15","date":"2026-06-15","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/meta-gallatin-gallatin-tn","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-gallatin","slug":"meta-gallatin-gallatin-tn","name":"Meta Gallatin","state":"TN","county":"Sumner County","orgIds":["meta","cumberland-elec-member-corp"],"iso":"None (non-RTO region)","utilities":["cumberland-elec-member-corp"],"id":"epoch-meta-gallatin:status:epoch-ai-data-centers:2026-06-15","date":"2026-06-15","kind":"value","field":"status","before":"under_construction","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-gallatin-gallatin-tn","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-jeffersonville","slug":"meta-jeffersonville-jeffersonville-in","name":"Meta Jeffersonville","state":"IN","county":"Clark County","orgIds":["meta","duke-energy"],"iso":"MISO","utilities":["duke-energy"],"id":"epoch-meta-jeffersonville:size.buildings_operational:epoch-ai-data-centers:2026-06-04","date":"2026-06-04","kind":"value","field":"size.buildings_operational","before":0,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 2","url":"https://datacenters.prithvidixit.com/facilities/meta-jeffersonville-jeffersonville-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-jeffersonville","slug":"meta-jeffersonville-jeffersonville-in","name":"Meta Jeffersonville","state":"IN","county":"Clark County","orgIds":["meta","duke-energy"],"iso":"MISO","utilities":["duke-energy"],"id":"epoch-meta-jeffersonville:status:epoch-ai-data-centers:2026-06-04","date":"2026-06-04","kind":"value","field":"status","before":"under_construction","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-jeffersonville-jeffersonville-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-jeffersonville","slug":"meta-jeffersonville-jeffersonville-in","name":"Meta Jeffersonville","state":"IN","county":"Clark County","orgIds":["meta","duke-energy"],"iso":"MISO","utilities":["duke-energy"],"id":"epoch-meta-jeffersonville:phase_operational:2026-06-04:epoch-ai-data-centers","date":"2026-06-04","kind":"milestone","milestone":"phase_operational","description":"Building 1 and 2 are operational.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 and 2 are operational.","url":"https://datacenters.prithvidixit.com/facilities/meta-jeffersonville-jeffersonville-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-huntsville","slug":"meta-huntsville-madison-county-al","name":"Meta Huntsville","state":"AL","county":"Madison County","orgIds":["meta","tva","nextera","first-solar"],"iso":"None (non-RTO region)","utilities":["tva"],"id":"epoch-meta-huntsville:power.it_mw:epoch-ai-data-centers:2026-06-02","date":"2026-06-02","kind":"value","field":"power.it_mw","before":78,"after":146,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 78 MW → 146 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-huntsville-madison-county-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-huntsville","slug":"meta-huntsville-madison-county-al","name":"Meta Huntsville","state":"AL","county":"Madison County","orgIds":["meta","tva","nextera","first-solar"],"iso":"None (non-RTO region)","utilities":["tva"],"id":"epoch-meta-huntsville:power.facility_mw:epoch-ai-data-centers:2026-06-02","date":"2026-06-02","kind":"value","field":"power.facility_mw","before":105,"after":198,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 105 MW → 198 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-huntsville-madison-county-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-huntsville","slug":"meta-huntsville-madison-county-al","name":"Meta Huntsville","state":"AL","county":"Madison County","orgIds":["meta","tva","nextera","first-solar"],"iso":"None (non-RTO region)","utilities":["tva"],"id":"epoch-meta-huntsville:size.buildings_operational:epoch-ai-data-centers:2026-06-02","date":"2026-06-02","kind":"value","field":"size.buildings_operational","before":1,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 2","url":"https://datacenters.prithvidixit.com/facilities/meta-huntsville-madison-county-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-huntsville","slug":"meta-huntsville-madison-county-al","name":"Meta Huntsville","state":"AL","county":"Madison County","orgIds":["meta","tva","nextera","first-solar"],"iso":"None (non-RTO region)","utilities":["tva"],"id":"epoch-meta-huntsville:status:epoch-ai-data-centers:2026-06-02","date":"2026-06-02","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-huntsville-madison-county-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-huntsville","slug":"meta-huntsville-madison-county-al","name":"Meta Huntsville","state":"AL","county":"Madison County","orgIds":["meta","tva","nextera","first-solar"],"iso":"None (non-RTO region)","utilities":["tva"],"id":"epoch-meta-huntsville:phase_operational:2026-06-02:epoch-ai-data-centers","date":"2026-06-02","kind":"milestone","milestone":"phase_operational","description":"We estimate Building 2 becomes operational due to being 120 days after final phases of construction, 9 months since roof and cooling were done, and similar Meta data centers construction timelines.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: We estimate Building 2 becomes operational due to being 120 days after final phases of construction, 9 months since roof and cooling were done, and similar Meta data centers construction timelines.","url":"https://datacenters.prithvidixit.com/facilities/meta-huntsville-madison-county-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-kuna","slug":"meta-kuna-ada-county-id","name":"Meta Kuna","state":"ID","county":"Ada County","orgIds":["meta","idaho-power"],"iso":"None (non-RTO region)","utilities":["idaho-power"],"id":"epoch-meta-kuna:size.buildings_operational:epoch-ai-data-centers:2026-06-01","date":"2026-06-01","kind":"value","field":"size.buildings_operational","before":0,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 2","url":"https://datacenters.prithvidixit.com/facilities/meta-kuna-ada-county-id","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-kuna","slug":"meta-kuna-ada-county-id","name":"Meta Kuna","state":"ID","county":"Ada County","orgIds":["meta","idaho-power"],"iso":"None (non-RTO region)","utilities":["idaho-power"],"id":"epoch-meta-kuna:status:epoch-ai-data-centers:2026-06-01","date":"2026-06-01","kind":"value","field":"status","before":"under_construction","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-kuna-ada-county-id","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-kuna","slug":"meta-kuna-ada-county-id","name":"Meta Kuna","state":"ID","county":"Ada County","orgIds":["meta","idaho-power"],"iso":"None (non-RTO region)","utilities":["idaho-power"],"id":"epoch-meta-kuna:phase_operational:2026-06-01:epoch-ai-data-centers","date":"2026-06-01","kind":"milestone","milestone":"phase_operational","description":"Building 1 and 2 are operational. The 2nd phase of an offsetting solar array goes online on May 31, 2026.  Idaho Public Utilities Comission's approval for this start date notes that \"[Meta]’s load is expected to increase so much that it will suffer a capacity deficit in June 2026 if served only by Pleasant Valley Solar 1.1,” A redacted table in the staff comments document suggests the data center's load will continue to increase through August, when it presumably reaches the maximum capacity of both buildings.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 and 2 are operational. The 2nd phase of an offsetting solar array goes online on May 31, 2026. Idaho Public Utilities Comission's approval for this start date notes that \"[Meta]’s load is expected to increa…","url":"https://datacenters.prithvidixit.com/facilities/meta-kuna-ada-county-id","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}}],"meta":{"total":19,"limit":100,"offset":0,"dataAsOf":"2026-10-12"},"attribution":{"license":"Open Database License (ODbL) 1.0 for the compiled database; individual sources keep their own terms (see sources[].license).","credit":["© OpenStreetMap contributors (ODbL 1.0) — https://www.openstreetmap.org/copyright","Epoch AI, 'AI data centers'. Published online at epoch.ai. Retrieved from 'https://epoch.ai/data/ai-data-centers' (CC BY 4.0)","Datacenter Source — https://datacenters.prithvidixit.com"],"terms":"/api#license","note":"Every figure links to its source. MW totals are floors (most facilities don't disclose power). Evidence levels: confirmed / announced / estimated — see /sources#evidence-levels."}}