{"data":[{"facilityId":"epoch-google-omaha","slug":"google-omaha-omaha-ne","name":"Google Omaha","state":"NE","county":"Douglas County","orgIds":["google","google-deepmind","opdp"],"iso":"SPP","utilities":["opdp"],"id":"epoch-google-omaha:power.it_mw:epoch-ai-data-centers:2026-06-30","date":"2026-06-30","kind":"value","field":"power.it_mw","before":158,"after":237,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 158 MW → 237 MW","url":"https://datacenters.prithvidixit.com/facilities/google-omaha-omaha-ne","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-omaha","slug":"google-omaha-omaha-ne","name":"Google Omaha","state":"NE","county":"Douglas County","orgIds":["google","google-deepmind","opdp"],"iso":"SPP","utilities":["opdp"],"id":"epoch-google-omaha:power.facility_mw:epoch-ai-data-centers:2026-06-30","date":"2026-06-30","kind":"value","field":"power.facility_mw","before":189,"after":284,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 189 MW → 284 MW","url":"https://datacenters.prithvidixit.com/facilities/google-omaha-omaha-ne","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-omaha","slug":"google-omaha-omaha-ne","name":"Google Omaha","state":"NE","county":"Douglas County","orgIds":["google","google-deepmind","opdp"],"iso":"SPP","utilities":["opdp"],"id":"epoch-google-omaha:size.buildings_operational:epoch-ai-data-centers:2026-06-30","date":"2026-06-30","kind":"value","field":"size.buildings_operational","before":2,"after":3,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 2 → 3","url":"https://datacenters.prithvidixit.com/facilities/google-omaha-omaha-ne","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-omaha","slug":"google-omaha-omaha-ne","name":"Google Omaha","state":"NE","county":"Douglas County","orgIds":["google","google-deepmind","opdp"],"iso":"SPP","utilities":["opdp"],"id":"epoch-google-omaha:phase_operational:2026-06-30:epoch-ai-data-centers","date":"2026-06-30","kind":"milestone","milestone":"phase_operational","description":"Building 3 is operational (estimate). Based on there being minimal construction work as of May 15.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 3 is operational (estimate). Based on there being minimal construction work as of May 15.","url":"https://datacenters.prithvidixit.com/facilities/google-omaha-omaha-ne","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-rosemount","slug":"meta-rosemount-rosemount-mn","name":"Meta Rosemount","state":"MN","county":"Dakota County","orgIds":["meta","northern-states-power-co-minnesota"],"iso":"MISO","utilities":["northern-states-power-co-minnesota"],"id":"epoch-meta-rosemount:size.buildings_operational:epoch-ai-data-centers:2026-06-19","date":"2026-06-19","kind":"value","field":"size.buildings_operational","before":0,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 2","url":"https://datacenters.prithvidixit.com/facilities/meta-rosemount-rosemount-mn","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-rosemount","slug":"meta-rosemount-rosemount-mn","name":"Meta Rosemount","state":"MN","county":"Dakota County","orgIds":["meta","northern-states-power-co-minnesota"],"iso":"MISO","utilities":["northern-states-power-co-minnesota"],"id":"epoch-meta-rosemount:status:epoch-ai-data-centers:2026-06-19","date":"2026-06-19","kind":"value","field":"status","before":"under_construction","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-rosemount-rosemount-mn","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-rosemount","slug":"meta-rosemount-rosemount-mn","name":"Meta Rosemount","state":"MN","county":"Dakota County","orgIds":["meta","northern-states-power-co-minnesota"],"iso":"MISO","utilities":["northern-states-power-co-minnesota"],"id":"epoch-meta-rosemount:phase_operational:2026-06-19:epoch-ai-data-centers","date":"2026-06-19","kind":"milestone","milestone":"phase_operational","description":"Buildings 1 and 2 are estimated to be operational.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Buildings 1 and 2 are estimated to be operational.","url":"https://datacenters.prithvidixit.com/facilities/meta-rosemount-rosemount-mn","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-montgomery","slug":"meta-montgomery-montgomery-al","name":"Meta Montgomery","state":"AL","county":"Montgomery County","orgIds":["meta","hensel-phelps","alabama-power-co"],"iso":"None (non-RTO region)","utilities":["alabama-power-co"],"id":"epoch-meta-montgomery:size.buildings_operational:epoch-ai-data-centers:2026-06-18","date":"2026-06-18","kind":"value","field":"size.buildings_operational","before":0,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 2","url":"https://datacenters.prithvidixit.com/facilities/meta-montgomery-montgomery-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-montgomery","slug":"meta-montgomery-montgomery-al","name":"Meta Montgomery","state":"AL","county":"Montgomery County","orgIds":["meta","hensel-phelps","alabama-power-co"],"iso":"None (non-RTO region)","utilities":["alabama-power-co"],"id":"epoch-meta-montgomery:status:epoch-ai-data-centers:2026-06-18","date":"2026-06-18","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/meta-montgomery-montgomery-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-montgomery","slug":"meta-montgomery-montgomery-al","name":"Meta Montgomery","state":"AL","county":"Montgomery County","orgIds":["meta","hensel-phelps","alabama-power-co"],"iso":"None (non-RTO region)","utilities":["alabama-power-co"],"id":"epoch-meta-montgomery:phase_operational:2026-06-18:epoch-ai-data-centers","date":"2026-06-18","kind":"milestone","milestone":"phase_operational","description":"We estimate Buildings 1 and 2 are operational.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: We estimate Buildings 1 and 2 are operational.","url":"https://datacenters.prithvidixit.com/facilities/meta-montgomery-montgomery-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-arcola","slug":"google-arcola-sterling-va","name":"Google Arcola","state":"VA","county":"Loudoun County","orgIds":["google","wheeler-survey-company-llc","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-google-arcola:size.buildings_operational:epoch-ai-data-centers:2026-06-16","date":"2026-06-16","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/google-arcola-sterling-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-arcola","slug":"google-arcola-sterling-va","name":"Google Arcola","state":"VA","county":"Loudoun County","orgIds":["google","wheeler-survey-company-llc","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-google-arcola:status:epoch-ai-data-centers:2026-06-16","date":"2026-06-16","kind":"value","field":"status","before":"under_construction","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating","url":"https://datacenters.prithvidixit.com/facilities/google-arcola-sterling-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-arcola","slug":"google-arcola-sterling-va","name":"Google Arcola","state":"VA","county":"Loudoun County","orgIds":["google","wheeler-survey-company-llc","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-google-arcola:phase_operational:2026-06-16:epoch-ai-data-centers","date":"2026-06-16","kind":"milestone","milestone":"phase_operational","description":"Building 1 is operational, based off of colored motion artifacts from cooling towers and direct visual verification.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 is operational, based off of colored motion artifacts from cooling towers and direct visual verification.","url":"https://datacenters.prithvidixit.com/facilities/google-arcola-sterling-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-project-osmium","slug":"microsoft-project-osmium-cumming-ia","name":"Microsoft Project Osmium","state":"IA","county":"Warren County","orgIds":["microsoft","openai","midamerican"],"iso":"MISO","utilities":["midamerican"],"id":"epoch-microsoft-project-osmium:status:epoch-ai-data-centers:2026-06-16","date":"2026-06-16","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/microsoft-project-osmium-cumming-ia","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"osm-way-1283734104","slug":"vantage-data-centers-goodyear-az","name":"Vantage Data Centers","state":"AZ","county":"Maricopa County","orgIds":["vantage","vantage-data-centers-az11-llc","aps"],"iso":"None (non-RTO region)","utilities":["aps"],"id":"osm-way-1283734104:land_acquired:2026-06-16:county-maricopa-az","date":"2026-06-16","kind":"milestone","milestone":"land_acquired","description":"Deed recorded for parcel 500-10-858C (owner of record: Vantage Data Centers Az11 LLC).","sourceId":"county-maricopa-az","evidenceLevel":"confirmed","text":"Land acquired: Deed recorded for parcel 500-10-858C (owner of record: Vantage Data Centers Az11 LLC).","url":"https://datacenters.prithvidixit.com/facilities/vantage-data-centers-goodyear-az","source":{"id":"county-maricopa-az","title":"Assessor Parcels","publisher":"Maricopa County Assessor's Office, AZ","url":"https://gis.mcassessor.maricopa.gov/arcgis/rest/services/Parcels/MapServer/0","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-colossus-1","slug":"colossus-1-memphis-tn","name":"Colossus 1","state":"TN","county":"Shelby County","orgIds":["spacexai","anthropic","mlgw"],"iso":"None (non-RTO region)","utilities":["mlgw"],"id":"epoch-colossus-1:status:epoch-ai-data-centers:2026-06-15","date":"2026-06-15","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/colossus-1-memphis-tn","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-colossus-2","slug":"colossus-2-memphis-ms","name":"Colossus 2","state":"MS","county":"DeSoto County","orgIds":["spacexai","anthropic","cursor"],"utilities":[],"id":"epoch-colossus-2:power.it_mw:epoch-ai-data-centers:2026-06-15","date":"2026-06-15","kind":"value","field":"power.it_mw","before":490,"after":946,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 490 MW → 946 MW","url":"https://datacenters.prithvidixit.com/facilities/colossus-2-memphis-ms","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-colossus-2","slug":"colossus-2-memphis-ms","name":"Colossus 2","state":"MS","county":"DeSoto County","orgIds":["spacexai","anthropic","cursor"],"utilities":[],"id":"epoch-colossus-2:power.facility_mw:epoch-ai-data-centers:2026-06-15","date":"2026-06-15","kind":"value","field":"power.facility_mw","before":661,"after":1276,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 661 MW → 1.28 GW","url":"https://datacenters.prithvidixit.com/facilities/colossus-2-memphis-ms","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-colossus-2","slug":"colossus-2-memphis-ms","name":"Colossus 2","state":"MS","county":"DeSoto County","orgIds":["spacexai","anthropic","cursor"],"utilities":[],"id":"epoch-colossus-2:size.buildings_operational:epoch-ai-data-centers:2026-06-15","date":"2026-06-15","kind":"value","field":"size.buildings_operational","before":1,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 2","url":"https://datacenters.prithvidixit.com/facilities/colossus-2-memphis-ms","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-colossus-2","slug":"colossus-2-memphis-ms","name":"Colossus 2","state":"MS","county":"DeSoto County","orgIds":["spacexai","anthropic","cursor"],"utilities":[],"id":"epoch-colossus-2:phase_operational:2026-06-15:epoch-ai-data-centers","date":"2026-06-15","kind":"milestone","milestone":"phase_operational","description":"The site is estimated to have at least ~830 MW of GPU server power, with at least \"at least 220,000 additional GB300 processors and over 400 additional megawatts of compute power\", corresponding to the \"next phase of expansion\" found in the following [company S-1 filing, page 76](https://www.sec.gov/Archives/edgar/data/1181412/000162828026036936/spaceexplorationtechnologi.htm). This estimate is backed up by our cooling and turbine based power production calculations. The cooling calculations suggest there is enough infrastructure to support ~850MW of IT Power. Similarly the energy production calculations support ~900MW of available IT Power. This gives us confidence that the proposed expansion was achieved in time. The roof for building 3 is halfway complete.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: The site is estimated to have at least ~830 MW of GPU server power, with at least \"at least 220,000 additional GB300 processors and over 400 additional megawatts of compute power\", corresponding to the \"next phase of …","url":"https://datacenters.prithvidixit.com/facilities/colossus-2-memphis-ms","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-gallatin","slug":"meta-gallatin-gallatin-tn","name":"Meta Gallatin","state":"TN","county":"Sumner County","orgIds":["meta","cumberland-elec-member-corp"],"iso":"None (non-RTO region)","utilities":["cumberland-elec-member-corp"],"id":"epoch-meta-gallatin:size.buildings_operational:epoch-ai-data-centers:2026-06-15","date":"2026-06-15","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/meta-gallatin-gallatin-tn","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-gallatin","slug":"meta-gallatin-gallatin-tn","name":"Meta Gallatin","state":"TN","county":"Sumner County","orgIds":["meta","cumberland-elec-member-corp"],"iso":"None (non-RTO region)","utilities":["cumberland-elec-member-corp"],"id":"epoch-meta-gallatin:status:epoch-ai-data-centers:2026-06-15","date":"2026-06-15","kind":"value","field":"status","before":"under_construction","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-gallatin-gallatin-tn","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-fairwater-atlanta","slug":"microsoft-fairwater-atlanta-fayetteville-ga","name":"Microsoft Fairwater Atlanta","state":"GA","county":"Fayette County","orgIds":["microsoft","openai","georgia-power"],"iso":"None (non-RTO region)","utilities":["georgia-power"],"id":"epoch-microsoft-fairwater-atlanta:power.it_mw:epoch-ai-data-centers:2026-06-14","date":"2026-06-14","kind":"value","field":"power.it_mw","before":321,"after":636,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 321 MW → 636 MW","url":"https://datacenters.prithvidixit.com/facilities/microsoft-fairwater-atlanta-fayetteville-ga","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-fairwater-atlanta","slug":"microsoft-fairwater-atlanta-fayetteville-ga","name":"Microsoft Fairwater Atlanta","state":"GA","county":"Fayette County","orgIds":["microsoft","openai","georgia-power"],"iso":"None (non-RTO region)","utilities":["georgia-power"],"id":"epoch-microsoft-fairwater-atlanta:power.facility_mw:epoch-ai-data-centers:2026-06-14","date":"2026-06-14","kind":"value","field":"power.facility_mw","before":433,"after":859,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 433 MW → 859 MW","url":"https://datacenters.prithvidixit.com/facilities/microsoft-fairwater-atlanta-fayetteville-ga","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-fairwater-atlanta","slug":"microsoft-fairwater-atlanta-fayetteville-ga","name":"Microsoft Fairwater Atlanta","state":"GA","county":"Fayette County","orgIds":["microsoft","openai","georgia-power"],"iso":"None (non-RTO region)","utilities":["georgia-power"],"id":"epoch-microsoft-fairwater-atlanta:size.buildings_operational:epoch-ai-data-centers:2026-06-14","date":"2026-06-14","kind":"value","field":"size.buildings_operational","before":2,"after":4,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 2 → 4","url":"https://datacenters.prithvidixit.com/facilities/microsoft-fairwater-atlanta-fayetteville-ga","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-fairwater-atlanta","slug":"microsoft-fairwater-atlanta-fayetteville-ga","name":"Microsoft Fairwater Atlanta","state":"GA","county":"Fayette County","orgIds":["microsoft","openai","georgia-power"],"iso":"None (non-RTO region)","utilities":["georgia-power"],"id":"epoch-microsoft-fairwater-atlanta:status:epoch-ai-data-centers:2026-06-14","date":"2026-06-14","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/microsoft-fairwater-atlanta-fayetteville-ga","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-fairwater-atlanta","slug":"microsoft-fairwater-atlanta-fayetteville-ga","name":"Microsoft Fairwater Atlanta","state":"GA","county":"Fayette County","orgIds":["microsoft","openai","georgia-power"],"iso":"None (non-RTO region)","utilities":["georgia-power"],"id":"epoch-microsoft-fairwater-atlanta:phase_operational:2026-06-14:epoch-ai-data-centers","date":"2026-06-14","kind":"milestone","milestone":"phase_operational","description":"Building 3 and 4 are operational.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 3 and 4 are operational.","url":"https://datacenters.prithvidixit.com/facilities/microsoft-fairwater-atlanta-fayetteville-ga","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-jeffersonville","slug":"meta-jeffersonville-jeffersonville-in","name":"Meta Jeffersonville","state":"IN","county":"Clark County","orgIds":["meta","duke-energy"],"iso":"MISO","utilities":["duke-energy"],"id":"epoch-meta-jeffersonville:size.buildings_operational:epoch-ai-data-centers:2026-06-04","date":"2026-06-04","kind":"value","field":"size.buildings_operational","before":0,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 2","url":"https://datacenters.prithvidixit.com/facilities/meta-jeffersonville-jeffersonville-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-jeffersonville","slug":"meta-jeffersonville-jeffersonville-in","name":"Meta Jeffersonville","state":"IN","county":"Clark County","orgIds":["meta","duke-energy"],"iso":"MISO","utilities":["duke-energy"],"id":"epoch-meta-jeffersonville:status:epoch-ai-data-centers:2026-06-04","date":"2026-06-04","kind":"value","field":"status","before":"under_construction","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-jeffersonville-jeffersonville-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-jeffersonville","slug":"meta-jeffersonville-jeffersonville-in","name":"Meta Jeffersonville","state":"IN","county":"Clark County","orgIds":["meta","duke-energy"],"iso":"MISO","utilities":["duke-energy"],"id":"epoch-meta-jeffersonville:phase_operational:2026-06-04:epoch-ai-data-centers","date":"2026-06-04","kind":"milestone","milestone":"phase_operational","description":"Building 1 and 2 are operational.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 and 2 are operational.","url":"https://datacenters.prithvidixit.com/facilities/meta-jeffersonville-jeffersonville-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-huntsville","slug":"meta-huntsville-madison-county-al","name":"Meta Huntsville","state":"AL","county":"Madison County","orgIds":["meta","tva","nextera","first-solar"],"iso":"None (non-RTO region)","utilities":["tva"],"id":"epoch-meta-huntsville:power.it_mw:epoch-ai-data-centers:2026-06-02","date":"2026-06-02","kind":"value","field":"power.it_mw","before":78,"after":146,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 78 MW → 146 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-huntsville-madison-county-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-huntsville","slug":"meta-huntsville-madison-county-al","name":"Meta Huntsville","state":"AL","county":"Madison County","orgIds":["meta","tva","nextera","first-solar"],"iso":"None (non-RTO region)","utilities":["tva"],"id":"epoch-meta-huntsville:power.facility_mw:epoch-ai-data-centers:2026-06-02","date":"2026-06-02","kind":"value","field":"power.facility_mw","before":105,"after":198,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 105 MW → 198 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-huntsville-madison-county-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-huntsville","slug":"meta-huntsville-madison-county-al","name":"Meta Huntsville","state":"AL","county":"Madison County","orgIds":["meta","tva","nextera","first-solar"],"iso":"None (non-RTO region)","utilities":["tva"],"id":"epoch-meta-huntsville:size.buildings_operational:epoch-ai-data-centers:2026-06-02","date":"2026-06-02","kind":"value","field":"size.buildings_operational","before":1,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 2","url":"https://datacenters.prithvidixit.com/facilities/meta-huntsville-madison-county-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-huntsville","slug":"meta-huntsville-madison-county-al","name":"Meta Huntsville","state":"AL","county":"Madison County","orgIds":["meta","tva","nextera","first-solar"],"iso":"None (non-RTO region)","utilities":["tva"],"id":"epoch-meta-huntsville:status:epoch-ai-data-centers:2026-06-02","date":"2026-06-02","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-huntsville-madison-county-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-huntsville","slug":"meta-huntsville-madison-county-al","name":"Meta Huntsville","state":"AL","county":"Madison County","orgIds":["meta","tva","nextera","first-solar"],"iso":"None (non-RTO region)","utilities":["tva"],"id":"epoch-meta-huntsville:phase_operational:2026-06-02:epoch-ai-data-centers","date":"2026-06-02","kind":"milestone","milestone":"phase_operational","description":"We estimate Building 2 becomes operational due to being 120 days after final phases of construction, 9 months since roof and cooling were done, and similar Meta data centers construction timelines.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: We estimate Building 2 becomes operational due to being 120 days after final phases of construction, 9 months since roof and cooling were done, and similar Meta data centers construction timelines.","url":"https://datacenters.prithvidixit.com/facilities/meta-huntsville-madison-county-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"osm-way-290307022","slug":"cogent-data-center-phoenix-az","name":"Cogent Data Center","state":"AZ","county":"Maricopa County","orgIds":["cogent","cube-data-center-company-llc","srp"],"iso":"None (non-RTO region)","utilities":["srp"],"id":"osm-way-290307022:land_acquired:2026-06-01:county-maricopa-az","date":"2026-06-01","kind":"milestone","milestone":"land_acquired","description":"Deed/transfer recorded for parcel 113-54-017A: $8,300,000.","sourceId":"county-maricopa-az","evidenceLevel":"confirmed","text":"Land acquired: Deed/transfer recorded for parcel 113-54-017A: $8,300,000.","url":"https://datacenters.prithvidixit.com/facilities/cogent-data-center-phoenix-az","source":{"id":"county-maricopa-az","title":"Assessor Parcels","publisher":"Maricopa County Assessor's Office, AZ","url":"https://gis.mcassessor.maricopa.gov/arcgis/rest/services/Parcels/MapServer/0","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-kuna","slug":"meta-kuna-ada-county-id","name":"Meta Kuna","state":"ID","county":"Ada County","orgIds":["meta","idaho-power"],"iso":"None (non-RTO region)","utilities":["idaho-power"],"id":"epoch-meta-kuna:size.buildings_operational:epoch-ai-data-centers:2026-06-01","date":"2026-06-01","kind":"value","field":"size.buildings_operational","before":0,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 2","url":"https://datacenters.prithvidixit.com/facilities/meta-kuna-ada-county-id","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-kuna","slug":"meta-kuna-ada-county-id","name":"Meta Kuna","state":"ID","county":"Ada County","orgIds":["meta","idaho-power"],"iso":"None (non-RTO region)","utilities":["idaho-power"],"id":"epoch-meta-kuna:status:epoch-ai-data-centers:2026-06-01","date":"2026-06-01","kind":"value","field":"status","before":"under_construction","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-kuna-ada-county-id","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-kuna","slug":"meta-kuna-ada-county-id","name":"Meta Kuna","state":"ID","county":"Ada County","orgIds":["meta","idaho-power"],"iso":"None (non-RTO region)","utilities":["idaho-power"],"id":"epoch-meta-kuna:phase_operational:2026-06-01:epoch-ai-data-centers","date":"2026-06-01","kind":"milestone","milestone":"phase_operational","description":"Building 1 and 2 are operational. The 2nd phase of an offsetting solar array goes online on May 31, 2026.  Idaho Public Utilities Comission's approval for this start date notes that \"[Meta]’s load is expected to increase so much that it will suffer a capacity deficit in June 2026 if served only by Pleasant Valley Solar 1.1,” A redacted table in the staff comments document suggests the data center's load will continue to increase through August, when it presumably reaches the maximum capacity of both buildings.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 and 2 are operational. The 2nd phase of an offsetting solar array goes online on May 31, 2026. Idaho Public Utilities Comission's approval for this start date notes that \"[Meta]’s load is expected to increa…","url":"https://datacenters.prithvidixit.com/facilities/meta-kuna-ada-county-id","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}}],"meta":{"total":39,"limit":100,"offset":0,"dataAsOf":"2026-10-12"},"attribution":{"license":"Open Database License (ODbL) 1.0 for the compiled database; individual sources keep their own terms (see sources[].license).","credit":["© OpenStreetMap contributors (ODbL 1.0) — https://www.openstreetmap.org/copyright","Epoch AI, 'AI data centers'. Published online at epoch.ai. Retrieved from 'https://epoch.ai/data/ai-data-centers' (CC BY 4.0)","Datacenter Source — https://datacenters.prithvidixit.com"],"terms":"/api#license","note":"Every figure links to its source. MW totals are floors (most facilities don't disclose power). Evidence levels: confirmed / announced / estimated — see /sources#evidence-levels."}}