{"data":[{"facilityId":"epoch-anthropic-lake-mariner","slug":"anthropic-lake-mariner-barker-ny","name":"Anthropic Lake Mariner","state":"NY","county":"Niagara County","orgIds":["ai-xpv","anthropic","google","blackstone","niagara-mohawk-power-corp"],"iso":"NYISO","utilities":["niagara-mohawk-power-corp"],"id":"epoch-anthropic-lake-mariner:size.buildings_operational:epoch-ai-data-centers:2026-05-31","date":"2026-05-31","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/anthropic-lake-mariner-barker-ny","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-anthropic-lake-mariner","slug":"anthropic-lake-mariner-barker-ny","name":"Anthropic Lake Mariner","state":"NY","county":"Niagara County","orgIds":["ai-xpv","anthropic","google","blackstone","niagara-mohawk-power-corp"],"iso":"NYISO","utilities":["niagara-mohawk-power-corp"],"id":"epoch-anthropic-lake-mariner:status:epoch-ai-data-centers:2026-05-31","date":"2026-05-31","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/anthropic-lake-mariner-barker-ny","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-anthropic-lake-mariner","slug":"anthropic-lake-mariner-barker-ny","name":"Anthropic Lake Mariner","state":"NY","county":"Niagara County","orgIds":["ai-xpv","anthropic","google","blackstone","niagara-mohawk-power-corp"],"iso":"NYISO","utilities":["niagara-mohawk-power-corp"],"id":"epoch-anthropic-lake-mariner:phase_operational:2026-05-31:epoch-ai-data-centers","date":"2026-05-31","kind":"milestone","milestone":"phase_operational","description":"Building 1 is operational. On February 26, Terawulf [stated](https://investors.terawulf.com/news-events/press-releases/detail/132/terawulf-reports-fourth-quarter-and-full-year-2025-results) that CB3 was expected to be energized by mid-May 2026. A drone video commissioned from [RAAD](https://raad.com/) shows several cooling units operating on May 8. It's therefore likely that the building was fully operational around this date.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 is operational. On February 26, Terawulf stated that CB3 was expected to be energized by mid-May 2026. A drone video commissioned from RAAD shows several cooling units operating on May 8. It's therefore lik…","url":"https://datacenters.prithvidixit.com/facilities/anthropic-lake-mariner-barker-ny","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:land_acquired:2026-05-28:county-licking-oh","date":"2026-05-28","kind":"milestone","milestone":"land_acquired","description":"Deed/transfer recorded for parcel 095-112218-00.000 (no sale price disclosed).","sourceId":"county-licking-oh","evidenceLevel":"confirmed","text":"Land acquired: Deed/transfer recorded for parcel 095-112218-00.000 (no sale price disclosed).","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"county-licking-oh","title":"Auditor Parcels","publisher":"Licking County, OH — Auditor","url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:power.it_mw:epoch-ai-data-centers:2026-05-23","date":"2026-05-23","kind":"value","field":"power.it_mw","before":211,"after":421,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 211 MW → 421 MW","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:power.facility_mw:epoch-ai-data-centers:2026-05-23","date":"2026-05-23","kind":"value","field":"power.facility_mw","before":295,"after":590,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 295 MW → 590 MW","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:size.buildings_operational:epoch-ai-data-centers:2026-05-23","date":"2026-05-23","kind":"value","field":"size.buildings_operational","before":2,"after":4,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 2 → 4","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:phase_operational:2026-05-23:epoch-ai-data-centers","date":"2026-05-23","kind":"milestone","milestone":"phase_operational","description":"Buildings 3 and 4 are estimated to be operational. On April 22nd, Oracle [posted](https://x.com/i/status/2047012589302153558) that \"In Abilene, 200MW is already operational\". This suggests that there was still only Building 1 and 2 operational. Since Buildings 3 and 4 looked complete from the outside on March 24th, we give it another month after Oracle's post for them to be operational. This would also give the buildings a similar 1 year 4 months timeline that Buildings 1 took from land clearing to being operational.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Buildings 3 and 4 are estimated to be operational. On April 22nd, Oracle posted that \"In Abilene, 200MW is already operational\". This suggests that there was still only Building 1 and 2 operational. Since Buildings 3 …","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-chester-va","slug":"coreweave-chester-va-chesterfield-county-va","name":"CoreWeave Chester VA","state":"VA","county":"Chesterfield County","orgIds":["coreweave","openai","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-coreweave-chester-va:power.it_mw:epoch-ai-data-centers:2026-05-20","date":"2026-05-20","kind":"value","field":"power.it_mw","before":27,"after":82,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 27 MW → 82 MW","url":"https://datacenters.prithvidixit.com/facilities/coreweave-chester-va-chesterfield-county-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-chester-va","slug":"coreweave-chester-va-chesterfield-county-va","name":"CoreWeave Chester VA","state":"VA","county":"Chesterfield County","orgIds":["coreweave","openai","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-coreweave-chester-va:power.facility_mw:epoch-ai-data-centers:2026-05-20","date":"2026-05-20","kind":"value","field":"power.facility_mw","before":38,"after":114,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 38 MW → 114 MW","url":"https://datacenters.prithvidixit.com/facilities/coreweave-chester-va-chesterfield-county-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-chester-va","slug":"coreweave-chester-va-chesterfield-county-va","name":"CoreWeave Chester VA","state":"VA","county":"Chesterfield County","orgIds":["coreweave","openai","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-coreweave-chester-va:size.buildings_operational:epoch-ai-data-centers:2026-05-20","date":"2026-05-20","kind":"value","field":"size.buildings_operational","before":1,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 2","url":"https://datacenters.prithvidixit.com/facilities/coreweave-chester-va-chesterfield-county-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-chester-va","slug":"coreweave-chester-va-chesterfield-county-va","name":"CoreWeave Chester VA","state":"VA","county":"Chesterfield County","orgIds":["coreweave","openai","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-coreweave-chester-va:phase_operational:2026-05-20:epoch-ai-data-centers","date":"2026-05-20","kind":"milestone","milestone":"phase_operational","description":"Based on satellite imagery, Building 3 has cleared its land and is beginning construction. Building 2 is operational judging from the colored motion artifacts on the cooling tower fans.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Based on satellite imagery, Building 3 has cleared its land and is beginning construction. Building 2 is operational judging from the colored motion artifacts on the cooling tower fans.","url":"https://datacenters.prithvidixit.com/facilities/coreweave-chester-va-chesterfield-county-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-bristow","slug":"google-bristow-bristow-va","name":"Google Bristow","state":"VA","county":"Prince William County","orgIds":["google","google-deepmind","nova-mango-farms-llc-c-o-corporation-service-company","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-google-bristow:power.it_mw:epoch-ai-data-centers:2026-05-20","date":"2026-05-20","kind":"value","field":"power.it_mw","before":174,"after":238,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 174 MW → 238 MW","url":"https://datacenters.prithvidixit.com/facilities/google-bristow-bristow-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-bristow","slug":"google-bristow-bristow-va","name":"Google Bristow","state":"VA","county":"Prince William County","orgIds":["google","google-deepmind","nova-mango-farms-llc-c-o-corporation-service-company","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-google-bristow:power.facility_mw:epoch-ai-data-centers:2026-05-20","date":"2026-05-20","kind":"value","field":"power.facility_mw","before":208,"after":286,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 208 MW → 286 MW","url":"https://datacenters.prithvidixit.com/facilities/google-bristow-bristow-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-bristow","slug":"google-bristow-bristow-va","name":"Google Bristow","state":"VA","county":"Prince William County","orgIds":["google","google-deepmind","nova-mango-farms-llc-c-o-corporation-service-company","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-google-bristow:size.buildings_operational:epoch-ai-data-centers:2026-05-20","date":"2026-05-20","kind":"value","field":"size.buildings_operational","before":2,"after":3,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 2 → 3","url":"https://datacenters.prithvidixit.com/facilities/google-bristow-bristow-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-bristow","slug":"google-bristow-bristow-va","name":"Google Bristow","state":"VA","county":"Prince William County","orgIds":["google","google-deepmind","nova-mango-farms-llc-c-o-corporation-service-company","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-google-bristow:status:epoch-ai-data-centers:2026-05-20","date":"2026-05-20","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/google-bristow-bristow-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-bristow","slug":"google-bristow-bristow-va","name":"Google Bristow","state":"VA","county":"Prince William County","orgIds":["google","google-deepmind","nova-mango-farms-llc-c-o-corporation-service-company","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-google-bristow:phase_operational:2026-05-20:epoch-ai-data-centers","date":"2026-05-20","kind":"milestone","milestone":"phase_operational","description":"Building 3 is operational, based off of colored motion artifacts from cooling towers.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 3 is operational, based off of colored motion artifacts from cooling towers.","url":"https://datacenters.prithvidixit.com/facilities/google-bristow-bristow-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-new-albany","slug":"google-new-albany-new-albany-oh","name":"Google New Albany","state":"OH","county":"Licking County","orgIds":["google","google-deepmind","montauk-innovations-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-google-new-albany:status:epoch-ai-data-centers:2026-05-18","date":"2026-05-18","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/google-new-albany-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:power.it_mw:epoch-ai-data-centers:2026-05-18","date":"2026-05-18","kind":"value","field":"power.it_mw","before":368,"after":496,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 368 MW → 496 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:power.facility_mw:epoch-ai-data-centers:2026-05-18","date":"2026-05-18","kind":"value","field":"power.facility_mw","before":478,"after":645,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 478 MW → 645 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:size.buildings_operational:epoch-ai-data-centers:2026-05-18","date":"2026-05-18","kind":"value","field":"size.buildings_operational","before":6,"after":11,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 6 → 11","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-amazon-ridgeland","slug":"amazon-ridgeland-madison-county-ms","name":"Amazon Ridgeland","state":"MS","county":"Madison County","orgIds":["amazon","anthropic","entergy"],"iso":"MISO","utilities":["entergy"],"id":"epoch-amazon-ridgeland:size.buildings_operational:epoch-ai-data-centers:2026-05-15","date":"2026-05-15","kind":"value","field":"size.buildings_operational","before":0,"after":4,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 4","url":"https://datacenters.prithvidixit.com/facilities/amazon-ridgeland-madison-county-ms","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-amazon-ridgeland","slug":"amazon-ridgeland-madison-county-ms","name":"Amazon Ridgeland","state":"MS","county":"Madison County","orgIds":["amazon","anthropic","entergy"],"iso":"MISO","utilities":["entergy"],"id":"epoch-amazon-ridgeland:status:epoch-ai-data-centers:2026-05-15","date":"2026-05-15","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/amazon-ridgeland-madison-county-ms","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-amazon-ridgeland","slug":"amazon-ridgeland-madison-county-ms","name":"Amazon Ridgeland","state":"MS","county":"Madison County","orgIds":["amazon","anthropic","entergy"],"iso":"MISO","utilities":["entergy"],"id":"epoch-amazon-ridgeland:phase_operational:2026-05-15:epoch-ai-data-centers","date":"2026-05-15","kind":"milestone","milestone":"phase_operational","description":"Buildings 1-4 are operational, based on the buildings shells and backup generators and most of the landscaping looking complete. Building 5 roof is complete but still lacks cooling equipment.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Buildings 1-4 are operational, based on the buildings shells and backup generators and most of the landscaping looking complete. Building 5 roof is complete but still lacks cooling equipment.","url":"https://datacenters.prithvidixit.com/facilities/amazon-ridgeland-madison-county-ms","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-2","slug":"qts-richmond-2-sandston-va","name":"QTS Richmond 2","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-2:power.it_mw:epoch-ai-data-centers:2026-05-14","date":"2026-05-14","kind":"value","field":"power.it_mw","before":144,"after":180,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 144 MW → 180 MW","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-2-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-2","slug":"qts-richmond-2-sandston-va","name":"QTS Richmond 2","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-2:power.facility_mw:epoch-ai-data-centers:2026-05-14","date":"2026-05-14","kind":"value","field":"power.facility_mw","before":202,"after":252,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 202 MW → 252 MW","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-2-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-2","slug":"qts-richmond-2-sandston-va","name":"QTS Richmond 2","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-2:size.buildings_operational:epoch-ai-data-centers:2026-05-14","date":"2026-05-14","kind":"value","field":"size.buildings_operational","before":4,"after":5,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 4 → 5","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-2-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-2","slug":"qts-richmond-2-sandston-va","name":"QTS Richmond 2","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-2:status:epoch-ai-data-centers:2026-05-14","date":"2026-05-14","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-2-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-2","slug":"qts-richmond-2-sandston-va","name":"QTS Richmond 2","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-2:phase_operational:2026-05-14:epoch-ai-data-centers","date":"2026-05-14","kind":"milestone","milestone":"phase_operational","description":"Building 5 is estimated to be operational, based on the previous entry.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 5 is estimated to be operational, based on the previous entry.","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-2-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-3","slug":"qts-richmond-3-sandston-va","name":"QTS Richmond 3","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-3:power.it_mw:epoch-ai-data-centers:2026-05-14","date":"2026-05-14","kind":"value","field":"power.it_mw","before":48,"after":144,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 48 MW → 144 MW","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-3-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-3","slug":"qts-richmond-3-sandston-va","name":"QTS Richmond 3","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-3:power.facility_mw:epoch-ai-data-centers:2026-05-14","date":"2026-05-14","kind":"value","field":"power.facility_mw","before":67,"after":202,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 67 MW → 202 MW","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-3-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-3","slug":"qts-richmond-3-sandston-va","name":"QTS Richmond 3","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-3:size.buildings_operational:epoch-ai-data-centers:2026-05-14","date":"2026-05-14","kind":"value","field":"size.buildings_operational","before":1,"after":3,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 3","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-3-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-3","slug":"qts-richmond-3-sandston-va","name":"QTS Richmond 3","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-3:phase_operational:2026-05-14:epoch-ai-data-centers","date":"2026-05-14","kind":"milestone","milestone":"phase_operational","description":"Building 2 and 3 are operational, based on the previous entry.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 2 and 3 are operational, based on the previous entry.","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-3-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-lincoln","slug":"google-lincoln-lincoln-ne","name":"Google Lincoln","state":"NE","county":"Lancaster County","orgIds":["google","lincoln-electric-system"],"iso":"SPP","utilities":["lincoln-electric-system"],"id":"epoch-google-lincoln:size.buildings_operational:epoch-ai-data-centers:2026-05-12","date":"2026-05-12","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/google-lincoln-lincoln-ne","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-lincoln","slug":"google-lincoln-lincoln-ne","name":"Google Lincoln","state":"NE","county":"Lancaster County","orgIds":["google","lincoln-electric-system"],"iso":"SPP","utilities":["lincoln-electric-system"],"id":"epoch-google-lincoln:status:epoch-ai-data-centers:2026-05-12","date":"2026-05-12","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/google-lincoln-lincoln-ne","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-lincoln","slug":"google-lincoln-lincoln-ne","name":"Google Lincoln","state":"NE","county":"Lancaster County","orgIds":["google","lincoln-electric-system"],"iso":"SPP","utilities":["lincoln-electric-system"],"id":"epoch-google-lincoln:phase_operational:2026-05-12:epoch-ai-data-centers","date":"2026-05-12","kind":"milestone","milestone":"phase_operational","description":"Building 1 operational. This is based on the fact that is no more visible equipment or construction around the building, and based on previous imagery and when construction started on the last pieces of equipment (fans). Building 2's roof is complete, with generator construction more than halfway complete and cooling construction beginning. Electrical equipment on the side of Building 2 is also around halfway complete.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 operational. This is based on the fact that is no more visible equipment or construction around the building, and based on previous imagery and when construction started on the last pieces of equipment (fan…","url":"https://datacenters.prithvidixit.com/facilities/google-lincoln-lincoln-ne","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-marble-nc","slug":"coreweave-marble-nc-marble-nc","name":"CoreWeave Marble NC","state":"NC","county":"Cherokee County","orgIds":["coreweave","openai","duke-energy"],"iso":"None (non-RTO region)","utilities":["duke-energy"],"id":"epoch-coreweave-marble-nc:power.it_mw:epoch-ai-data-centers:2026-05-06","date":"2026-05-06","kind":"value","field":"power.it_mw","before":36,"after":65,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 36 MW → 65 MW","url":"https://datacenters.prithvidixit.com/facilities/coreweave-marble-nc-marble-nc","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-marble-nc","slug":"coreweave-marble-nc-marble-nc","name":"CoreWeave Marble NC","state":"NC","county":"Cherokee County","orgIds":["coreweave","openai","duke-energy"],"iso":"None (non-RTO region)","utilities":["duke-energy"],"id":"epoch-coreweave-marble-nc:power.facility_mw:epoch-ai-data-centers:2026-05-06","date":"2026-05-06","kind":"value","field":"power.facility_mw","before":50,"after":91,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 50 MW → 91 MW","url":"https://datacenters.prithvidixit.com/facilities/coreweave-marble-nc-marble-nc","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-marble-nc","slug":"coreweave-marble-nc-marble-nc","name":"CoreWeave Marble NC","state":"NC","county":"Cherokee County","orgIds":["coreweave","openai","duke-energy"],"iso":"None (non-RTO region)","utilities":["duke-energy"],"id":"epoch-coreweave-marble-nc:status:epoch-ai-data-centers:2026-05-06","date":"2026-05-06","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/coreweave-marble-nc-marble-nc","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-papillion","slug":"google-papillion-sarpy-county-ne","name":"Google Papillion","state":"NE","county":"Sarpy County","orgIds":["google","google-deepmind","opdp"],"iso":"SPP","utilities":["opdp"],"id":"epoch-google-papillion:status:epoch-ai-data-centers:2026-05-04","date":"2026-05-04","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/google-papillion-sarpy-county-ne","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-eagle-mountain","slug":"meta-eagle-mountain-eagle-mountain-ut","name":"Meta Eagle Mountain","state":"UT","county":"Utah County","orgIds":["meta","mortenson","williams","pacificorp"],"iso":"None (non-RTO region)","utilities":["pacificorp"],"id":"epoch-meta-eagle-mountain:status:epoch-ai-data-centers:2026-05-02","date":"2026-05-02","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-eagle-mountain-eagle-mountain-ut","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-columbus","slug":"google-columbus-columbus-oh","name":"Google Columbus","state":"OH","county":"Franklin County","orgIds":["google","google-deepmind","magellan-enterprises-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-google-columbus:power.it_mw:epoch-ai-data-centers:2026-05-01","date":"2026-05-01","kind":"value","field":"power.it_mw","before":216,"after":303,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 216 MW → 303 MW","url":"https://datacenters.prithvidixit.com/facilities/google-columbus-columbus-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-columbus","slug":"google-columbus-columbus-oh","name":"Google Columbus","state":"OH","county":"Franklin County","orgIds":["google","google-deepmind","magellan-enterprises-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-google-columbus:power.facility_mw:epoch-ai-data-centers:2026-05-01","date":"2026-05-01","kind":"value","field":"power.facility_mw","before":260,"after":364,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 260 MW → 364 MW","url":"https://datacenters.prithvidixit.com/facilities/google-columbus-columbus-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-columbus","slug":"google-columbus-columbus-oh","name":"Google Columbus","state":"OH","county":"Franklin County","orgIds":["google","google-deepmind","magellan-enterprises-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-google-columbus:size.buildings_operational:epoch-ai-data-centers:2026-05-01","date":"2026-05-01","kind":"value","field":"size.buildings_operational","before":3,"after":4,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 3 → 4","url":"https://datacenters.prithvidixit.com/facilities/google-columbus-columbus-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-columbus","slug":"google-columbus-columbus-oh","name":"Google Columbus","state":"OH","county":"Franklin County","orgIds":["google","google-deepmind","magellan-enterprises-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-google-columbus:phase_operational:2026-05-01:epoch-ai-data-centers","date":"2026-05-01","kind":"milestone","milestone":"phase_operational","description":"Building 4 operational. No more visible construction, and since only 3 fans needed to be installed since Feburary, operational date was likely soon after. Building 5 roof almost complete.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 4 operational. No more visible construction, and since only 3 fans needed to be installed since Feburary, operational date was likely soon after. Building 5 roof almost complete.","url":"https://datacenters.prithvidixit.com/facilities/google-columbus-columbus-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-stream-phoenix","slug":"stream-phoenix-maricopa-county-az","name":"Stream Phoenix","state":"AZ","county":"Maricopa County","orgIds":["sdc-phxa4-llc","sdc-phx-ii-llc","sdc-phxa7-llc","srp"],"iso":"None (non-RTO region)","utilities":["srp"],"id":"epoch-stream-phoenix:size.buildings_operational:epoch-ai-data-centers:2026-05-01","date":"2026-05-01","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/stream-phoenix-maricopa-county-az","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-stream-phoenix","slug":"stream-phoenix-maricopa-county-az","name":"Stream Phoenix","state":"AZ","county":"Maricopa County","orgIds":["sdc-phxa4-llc","sdc-phx-ii-llc","sdc-phxa7-llc","srp"],"iso":"None (non-RTO region)","utilities":["srp"],"id":"epoch-stream-phoenix:status:epoch-ai-data-centers:2026-05-01","date":"2026-05-01","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/stream-phoenix-maricopa-county-az","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-stream-phoenix","slug":"stream-phoenix-maricopa-county-az","name":"Stream Phoenix","state":"AZ","county":"Maricopa County","orgIds":["sdc-phxa4-llc","sdc-phx-ii-llc","sdc-phxa7-llc","srp"],"iso":"None (non-RTO region)","utilities":["srp"],"id":"epoch-stream-phoenix:phase_operational:2026-05-01:epoch-ai-data-centers","date":"2026-05-01","kind":"milestone","milestone":"phase_operational","description":"Estimated: AI building 1 should be operational. Major construction work finished by January 31, 2026, and the shell looked complete by that date. We estimate after three months the building will be operational.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Estimated: AI building 1 should be operational. Major construction work finished by January 31, 2026, and the shell looked complete by that date. We estimate after three months the building will be operational.","url":"https://datacenters.prithvidixit.com/facilities/stream-phoenix-maricopa-county-az","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}}],"meta":{"total":48,"limit":100,"offset":0,"dataAsOf":"2026-10-12"},"attribution":{"license":"Open Database License (ODbL) 1.0 for the compiled database; individual sources keep their own terms (see sources[].license).","credit":["© OpenStreetMap contributors (ODbL 1.0) — https://www.openstreetmap.org/copyright","Epoch AI, 'AI data centers'. Published online at epoch.ai. Retrieved from 'https://epoch.ai/data/ai-data-centers' (CC BY 4.0)","Datacenter Source — https://datacenters.prithvidixit.com"],"terms":"/api#license","note":"Every figure links to its source. MW totals are floors (most facilities don't disclose power). Evidence levels: confirmed / announced / estimated — see /sources#evidence-levels."}}