{"data":[{"facilityId":"epoch-vantage-tx1","slug":"vantage-tx1-san-antonio-tx","name":"Vantage TX1","state":"TX","county":"Bexar County","orgIds":["pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-vantage-tx1:size.buildings_operational:epoch-ai-data-centers:2026-02-15","date":"2026-02-15","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/vantage-tx1-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-vantage-tx1","slug":"vantage-tx1-san-antonio-tx","name":"Vantage TX1","state":"TX","county":"Bexar County","orgIds":["pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-vantage-tx1:status:epoch-ai-data-centers:2026-02-15","date":"2026-02-15","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/vantage-tx1-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-vantage-tx1","slug":"vantage-tx1-san-antonio-tx","name":"Vantage TX1","state":"TX","county":"Bexar County","orgIds":["pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-vantage-tx1:phase_operational:2026-02-15:epoch-ai-data-centers","date":"2026-02-15","kind":"milestone","milestone":"phase_operational","description":"Building 1 operational; Roads around Building 1 complete, all cooling and side generator equipment construction has since finished as well. Although this is still earlier than the completion date reported on TDLR, based on the appearance, we believe it is operational. Reported IT power of 32 MW. [Source](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2024007561)","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 operational; Roads around Building 1 complete, all cooling and side generator equipment construction has since finished as well. Although this is still earlier than the completion date reported on TDLR, bas…","url":"https://datacenters.prithvidixit.com/facilities/vantage-tx1-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}}],"meta":{"total":3,"limit":100,"offset":0,"dataAsOf":"2026-10-12"},"attribution":{"license":"Open Database License (ODbL) 1.0 for the compiled database; individual sources keep their own terms (see sources[].license).","credit":["© OpenStreetMap contributors (ODbL 1.0) — https://www.openstreetmap.org/copyright","Epoch AI, 'AI data centers'. Published online at epoch.ai. Retrieved from 'https://epoch.ai/data/ai-data-centers' (CC BY 4.0)","Datacenter Source — https://datacenters.prithvidixit.com"],"terms":"/api#license","note":"Every figure links to its source. MW totals are floors (most facilities don't disclose power). Evidence levels: confirmed / announced / estimated — see /sources#evidence-levels."}}