{"data":[{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:power.it_mw:epoch-ai-data-centers:2026-02-23","date":"2026-02-23","kind":"value","field":"power.it_mw","before":67,"after":131,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 67 MW → 131 MW","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:power.facility_mw:epoch-ai-data-centers:2026-02-23","date":"2026-02-23","kind":"value","field":"power.facility_mw","before":94,"after":183,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 94 MW → 183 MW","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:size.buildings_operational:epoch-ai-data-centers:2026-02-23","date":"2026-02-23","kind":"value","field":"size.buildings_operational","before":3,"after":4,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 3 → 4","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:phase_operational:2026-02-23:epoch-ai-data-centers","date":"2026-02-23","kind":"milestone","milestone":"phase_operational","description":"Buildings 1-3 (Denton North) are largely built out/operational, and Denton South has its first data hall plus support equipment substantially installed. Remaining Denton South buildings (4-7) still under construction. This is according to satellite imagery.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Buildings 1-3 (Denton North) are largely built out/operational, and Denton South has its first data hall plus support equipment substantially installed. Remaining Denton South buildings (4-7) still under construction.…","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-dalton-1-and-2","slug":"coreweave-dalton-1-and-2-whitfield-county-ga","name":"CoreWeave Dalton 1 & 2","state":"GA","county":"Whitfield County","orgIds":["coreweave","openai","georgia-power"],"iso":"None (non-RTO region)","utilities":["georgia-power"],"id":"epoch-coreweave-dalton-1-and-2:size.buildings_operational:epoch-ai-data-centers:2026-02-20","date":"2026-02-20","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/coreweave-dalton-1-and-2-whitfield-county-ga","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-dalton-1-and-2","slug":"coreweave-dalton-1-and-2-whitfield-county-ga","name":"CoreWeave Dalton 1 & 2","state":"GA","county":"Whitfield County","orgIds":["coreweave","openai","georgia-power"],"iso":"None (non-RTO region)","utilities":["georgia-power"],"id":"epoch-coreweave-dalton-1-and-2:status:epoch-ai-data-centers:2026-02-20","date":"2026-02-20","kind":"value","field":"status","before":"under_construction","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating","url":"https://datacenters.prithvidixit.com/facilities/coreweave-dalton-1-and-2-whitfield-county-ga","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-dalton-1-and-2","slug":"coreweave-dalton-1-and-2-whitfield-county-ga","name":"CoreWeave Dalton 1 & 2","state":"GA","county":"Whitfield County","orgIds":["coreweave","openai","georgia-power"],"iso":"None (non-RTO region)","utilities":["georgia-power"],"id":"epoch-coreweave-dalton-1-and-2:phase_operational:2026-02-20:epoch-ai-data-centers","date":"2026-02-20","kind":"milestone","milestone":"phase_operational","description":"Building 1 is operational, given it was announced completed 4 months ago and looks completed in satellite imagery. All cooling/mechanical rows are installed, with no obvious active building construction visible.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 is operational, given it was announced completed 4 months ago and looks completed in satellite imagery. All cooling/mechanical rows are installed, with no obvious active building construction visible.","url":"https://datacenters.prithvidixit.com/facilities/coreweave-dalton-1-and-2-whitfield-county-ga","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}}],"meta":{"total":7,"limit":100,"offset":0,"dataAsOf":"2026-10-12"},"attribution":{"license":"Open Database License (ODbL) 1.0 for the compiled database; individual sources keep their own terms (see sources[].license).","credit":["© OpenStreetMap contributors (ODbL 1.0) — https://www.openstreetmap.org/copyright","Epoch AI, 'AI data centers'. Published online at epoch.ai. Retrieved from 'https://epoch.ai/data/ai-data-centers' (CC BY 4.0)","Datacenter Source — https://datacenters.prithvidixit.com"],"terms":"/api#license","note":"Every figure links to its source. MW totals are floors (most facilities don't disclose power). Evidence levels: confirmed / announced / estimated — see /sources#evidence-levels."}}