{"data":[{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:power.it_mw:epoch-ai-data-centers:2026-01-18","date":"2026-01-18","kind":"value","field":"power.it_mw","before":76,"after":368,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 76 MW → 368 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:power.facility_mw:epoch-ai-data-centers:2026-01-18","date":"2026-01-18","kind":"value","field":"power.facility_mw","before":99,"after":478,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 99 MW → 478 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:size.buildings_operational:epoch-ai-data-centers:2026-01-18","date":"2026-01-18","kind":"value","field":"size.buildings_operational","before":1,"after":6,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 6","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:phase_operational:2026-01-18:epoch-ai-data-centers","date":"2026-01-18","kind":"milestone","milestone":"phase_operational","description":"Buildings 2-6 are operational, based on all equipment being in place, the paved ground, and minimal construction equipment by the buildings. Buildings 7-11 all have some kind of power or cooling equipment lining their right side which are not fully installed. Building 14 has chillers installed. Buildings 16-20 roofs are complete. The Socrates South power plant to the right of Buildings 7-11 has 7 gas turbines in place, judging by the exhaust stacks.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Buildings 2-6 are operational, based on all equipment being in place, the paved ground, and minimal construction equipment by the buildings. Buildings 7-11 all have some kind of power or cooling equipment lining their…","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}}],"meta":{"total":4,"limit":100,"offset":0,"dataAsOf":"2026-10-12"},"attribution":{"license":"Open Database License (ODbL) 1.0 for the compiled database; individual sources keep their own terms (see sources[].license).","credit":["© OpenStreetMap contributors (ODbL 1.0) — https://www.openstreetmap.org/copyright","Epoch AI, 'AI data centers'. Published online at epoch.ai. Retrieved from 'https://epoch.ai/data/ai-data-centers' (CC BY 4.0)","Datacenter Source — https://datacenters.prithvidixit.com"],"terms":"/api#license","note":"Every figure links to its source. MW totals are floors (most facilities don't disclose power). Evidence levels: confirmed / announced / estimated — see /sources#evidence-levels."}}